Signature Ritz, Tathawade
Sold as Thergaon by 5 property sites; we list it under Tathawade (pincode 411033).
See the site from above todayTathawade, Mulshi, Pune district · 411033
- Possession
- Apr 2029
- completion filed with MahaRERA
- Booked
- 106 of 314
What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- 34% of homes booked: MahaRERA shows 106 of 314 homes booked.
- Buildings in this registration: 2, up to 28 floors.
- 34% booked here; the middle of 72 Tathawade projects registered within a year of it is 53%.
- Compared with other projects still being built in Tathawade: Compared with other projects still being built in Tathawade: its tallest building is higher than that of 53 of 85.
- Completion date filed with MahaRERA: 30 Apr 2029.
Updated 21 Nov 2026
Price
No price for Signature Ritz is published yet.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Signature Ritz from above, today
Signature Ritz, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024 and Oct 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Oct 2025 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Little change, construction footprint visible with tall shadows.
Registered with MahaRERA Jul 2023 · possession filed for Apr 2029
Satellite images show the site transitioning from vacant ground to active construction following the July 2023 registration of Signature Ritz, with new building footprints and tall structural shadows appearing over time.
The seasons before
- Apr–May 2026Little change, structures and shadows remain stable.
- Jan–Mar 2026Tall structures cast prominent shadows within and near the ring.
- Oct–Dec 2025Structures show further development with distinct shadows.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
- Apr–May 2025Little change, structural footprints remain visible.
- Jan–Mar 2025Dark shadows from growing structures appear to the north.
- Oct–Dec 2024New building footprints and shadows emerge inside the ring.
- Apr–May 2024Little change, ground preparation continues.
- Jan–Mar 2024Initial foundation footprints and clearing appear following registration.
- Oct–Dec 2023Work shows after the Jul 2023 registration with ground disturbance.
- Apr–May 2023Little change, dry ground persists.
- Jan–Mar 2023Vacant ground visible inside the ring with surrounding buildings.
- Oct–Dec 2022Little change, area remains mostly open ground.
- Apr–May 2022Dry vacant ground persists within the ring.
- Jan–Mar 2022Ground remains mostly cleared with low vegetation.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.
Flat sizes
- 3 BHK: 1,081 to 1,265 sq ft, carpet area
Your agreement for sale states the final carpet area.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.9 km
- Baner-Balewadi High Street4.9 km
- Pune Railway Station14.6 km
- Pune Airport (Lohegaon)15.3 km
Nearby
- HospitalAditya Birla Memorial Hospital1.6 km
- TempleShani Mandir1.8 km
- TempleMahasadhu Shree Morya Gosavi Maharaj Sanjivan Samadhi Mandir1.8 km
- ShoppingPhoenix Mall of the Millennium1.9 km
- CollegeIndira College of Commerce & Science (ICCS)2 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
30 Apr 2029
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 34%
- The middle of 71 Tathawade projects registered within a year of it: 57%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 106 of 314
- Towers
- 2 in this registration
- The tallest has 28 floors.
- Units
- 314
- 190 homes, 124 shops or offices.
- Registered on
- 19 Jul 2023
- MahaRERA registration
- P52100052042
- Listed or updated on MahaRERA 28 May 2026.
- Project type
- Others
- Pincode
- 411033
Check before you book
From MahaRERA- 124 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
2 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| SR1 | 28 | 95 | 80 |
| SR2 | 28 | 95 | 44 |
As filed with MahaRERA (sanctioned floors).
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
FAQ
What is the price of Signature Ritz?
No price for Signature Ritz is published yet. Ask through the enquiry form on this page for the current price.
What is the possession date of Signature Ritz?
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Signature Ritz?
Signature Ritz is registered with MahaRERA as P52100052042.
How many towers and floors does Signature Ritz have?
MahaRERA lists 2 buildings, the tallest with 28 floors.
How many flats are there in Signature Ritz?
MahaRERA lists 314 units (190 residential, 124 other).
How many homes in Signature Ritz are booked?
106 of 314 homes were booked as per MahaRERA on 20 Nov 2026.
Where is Signature Ritz?
Signature Ritz is in Mulshi, Pune district (pincode 411033).
Which hospital is nearest to Signature Ritz?
Aditya Birla Memorial Hospital, about 1.6 km away in a straight line from the map position; the drive is longer.
How far is Signature Ritz from Pune Airport?
About 15.3 km in a straight line from the map position; the drive is longer.
How far is Signature Ritz from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 3.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Signature Ritz.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 28 May 2026
- Dates and homes bookedFrom MahaRERA
Checked 10 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 10 Nov 2026
- Location and nearbyGathered and checked
Checked 10 Nov 2026
- DescriptionGathered and checked
Checked 10 Nov 2026
- Home sizesGathered and checked
The builder's site, or two property sites that agree