Skip to main contentSkip to navigation
Sukhwani Ambar, from the builder's websiteSUKHWANI DEVELOPERS logo
The builder's picture
MahaRERA registered P52100026576Verify on MahaRERA (opens in a new tab)Near completion

Sukhwani Ambar, Hinjawadi

Sold as Wakad by 8 property sites; we list it under Hinjawadi (pincode 411057).

See the site from above today

by Sukhwani Developers · Hinjawadi, Mulshi, Pune district · 411057

Homes
2, 3 BHK
Price
from ₹1.1 Cr
EMI about ₹76,368 a month
Possession
Oct 2027
completion filed with MahaRERA
Booked
100 of 358
12 booked in the last 31 days

Avasetu's read (from MahaRERA data, 14 Nov 2026)

It is selling slowly, with 100 of 358 homes booked, the builder filed completion date with MahaRERA as 30 Oct 2027, you may want to ask the builder about the slow pace

What stands out

As of 14 Nov 2026, from MahaRERA and the sources below.

  • MahaRERA's order added 4 months to the completion date, which is now 30 Oct 2027, as the builder did not move it
  • 28% of homes booked: Only 100 of 358 homes are booked, which is lower than similar projects at about 76%
  • This registration has more homes than 109 of 143 other projects in Hinjawadi

Updated 22 Nov 2026

Price

  • 2 BHK

    ₹1.17 Cr – ₹1.19 Cr

    from 803 sq ft · ₹14,570/sq ft

    Last checked 21 Nov 2026

    All-in cost of the 2 BHK at ₹1.17 Cr: about ₹1.31 Cr
    Price (agreement value)₹1.17 Cr
    GST (5%)₹5.85 L
    Stamp duty (7%)₹8.19 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.31 Cr
  • 3 BHK

    From ₹1.1 Cr

    Last checked 21 Nov 2026

    All-in cost of the 3 BHK at ₹1.1 Cr: about ₹1.24 Cr
    Price (agreement value)₹1.1 Cr
    GST (5%)₹5.5 L
    Stamp duty (7%)₹7.7 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.24 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹76,368 a monthOn a ₹88 L loan (80% of ₹1.1 Cr) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (43 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,406/sq ft across 20 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Sukhwani Ambar from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Sukhwani Ambar, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Sukhwani Ambar from above, satellite picture of Nov 2022
    Nov 2022
  2. Sukhwani Ambar from above, satellite picture of Jan 2024
    Jan 2024
  3. Sukhwani Ambar from above, satellite picture of Feb 2025
    Feb 2025
  4. Sukhwani Ambar from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2022 (looked Nov 2026)

Plant cover reduced within the ring compared to previous year.

Registered with MahaRERA Oct 2020 · possession filed for Oct 2027

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

From 2021 to 2026, vegetation within the ring gradually decreased while surrounding urban structures remained dense, showing minimal overall change at the site.

The seasons before

  1. Jan–Mar 2021Ground cleared near ring with sparse vegetation and nearby structures visible.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.4 km
  • Baner-Balewadi High Street4.6 km
  • Pune Railway Station15.7 km
  • Pune Airport (Lohegaon)17.3 km

Nearby

  • SchoolAkshara International School & Junior College0.8 km
  • TempleShani Mandir0.9 km
  • CollegeIndira College of Commerce & Science (ICCS)1.1 km
  • ShoppingPhoenix Mall of the Millennium1.1 km
  • Bus standWakad Chowk1.9 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Amenities

Last checked 21 Nov 2026.

MahaRERA record

From MahaRERA, read 14 Nov 2026

Possession date

30 Oct 2027

The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2027.

Sukhwani Ambar: what changed, as we read it

12 more homes booked between 14 Oct 2026 and 14 Nov 2026: 88 to 100, of 358 homes.

14 Oct 202614 Nov 2026
  • 14 Nov 2026: 100 booked
  • 14 Oct 2026: 88 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Hinjawadi projects

Worked out by Avasetu
Homes booked
28%
The middle of 15 Hinjawadi projects registered within a year of it: 76%.
Completion date
Not moved by the builder
47 of 150 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 14 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
100 of 358
Towers
5 in this registration
The tallest has 23 floors.
Units
358
338 homes, 20 shops or offices.
Registered on
6 Oct 2020
MahaRERA registration
P52100026576
Listed or updated on MahaRERA 20 Dec 2024.
Promoter (builder)
Sukhwani Developers
Project type
Others
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 20 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

5 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Building A231660
Building B201400
Building C2018
Buidling D10322
Bldg E - MAHADA Not in Revised Layout000

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 21 floors
Land
2.44 acres

Last checked 21 Nov 2026. MahaRERA counts where they differ.

Sukhwani Developers: track record

From MahaRERA records

Sukhwani Developers has 2 projects in our MahaRERA register for Pune.

All 2 projects by Sukhwani Developers in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

More by Sukhwani Developers

FAQ

What is the price of Sukhwani Ambar?

2 BHK: ₹1.17 Cr to ₹1.19 Cr; 3 BHK: ₹1.1 Cr, checked on 21 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Sukhwani Ambar?

The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Sukhwani Ambar?

Sukhwani Ambar is registered with MahaRERA as P52100026576.

How many towers and floors does Sukhwani Ambar have?

MahaRERA lists 5 buildings, the tallest with 23 floors.

How many flats are there in Sukhwani Ambar?

MahaRERA lists 358 units (338 residential, 20 other).

How many homes in Sukhwani Ambar are booked?

100 of 358 homes were booked as per MahaRERA on 14 Nov 2026.

Who is the builder of Sukhwani Ambar?

The promoter registered with MahaRERA is Sukhwani Developers. Our register has 2 Pune projects by Sukhwani Developers.

Where is Sukhwani Ambar?

Sukhwani Ambar is in Mulshi, Pune district (pincode 411057).

Which school is nearest to Sukhwani Ambar?

Akshara International School & Junior College, about 0.8 km away in a straight line from the map position; the drive is longer.

How far is Sukhwani Ambar from Pune Airport?

About 17.3 km in a straight line from the map position; the drive is longer.

How far is Sukhwani Ambar from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Sukhwani Ambar.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 20 Dec 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 21 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 21 Nov 2026

  • Location and nearbyGathered and checked

    Checked 21 Nov 2026

  • DescriptionGathered and checked

    Checked 21 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (21 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (21 Nov 2026)

Get the price sheet and floor plans for Sukhwani Ambar

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment