Skip to main contentSkip to navigation
Sukhwani Chawla Developers logo
The builder's logo, from sukhwani.in
MahaRERA registered P52100021183Verify on MahaRERA (opens in a new tab)Near completion

Sukhwani Skylines, Hinjawadi

Sold as Wakad by 8 property sites; we list it under Hinjawadi (pincode 411057).

See the site from above today

by Sukhwani Chawla Developers · Hinjawadi, Mulshi, Pune district · 411057

Price
from ₹91 L
EMI about ₹63,178 a month
Possession
Dec 2027
completion filed with MahaRERA
Booked
631 of 853

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • With 853 homes in this registration, the development has more units than 142 of 150 projects currently under construction in Hinjawadi.
  • 74% of homes booked: Buyers have already booked 631 of the 853 units registered in this phase.
  • The developer filed a completion date of 30 Dec 2027 with MahaRERA across its 7 towers of 15 floors each.

Updated 21 Nov 2026

Price

  • Homes

    ₹91 L – ₹1.18 Cr

    Last checked 4 Nov 2026

    All-in cost of a home at ₹91 L: about ₹1.02 Cr
    Price (agreement value)₹91 L
    GST (5%)₹4.55 L
    Stamp duty (7%)₹6.37 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.02 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹63,178 a monthOn a ₹72.8 L loan (80% of ₹91 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (45 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (44 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,462/sq ft across 21 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Sukhwani Skylines from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Sukhwani Skylines, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Sukhwani Skylines from above, satellite picture of Nov 2022
    Nov 2022
  2. Sukhwani Skylines from above, satellite picture of Jan 2024
    Jan 2024
  3. Sukhwani Skylines from above, satellite picture of Feb 2025
    Feb 2025
  4. Sukhwani Skylines from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Final views show established building footprints matching prior seasons.

Registered with MahaRERA Jun 2019 · possession filed for Dec 2027

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

Sukhwani Skylines in Wakad, Pune, registered in June 2019, shows vacant land transitioning to construction activity with building footprints and shadows emerging after registration, aligning with the project timeline.

The seasons before

  1. Apr–May 2026Little change in the site conditions.
  2. Jan–Mar 2026Building shadows remain visible within the ring area.
  3. Oct–Dec 2025Little change as construction footprints remain consistent.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change in the visible site layout.
  2. Jan–Mar 2025Clear building shadows continue to show structures inside the ring.
  3. Oct–Dec 2024Little change with ongoing presence of building structures.
  4. Apr–May 2024Little change observed in the established building footprints.
  5. Jan–Mar 2024Building shadows indicate ongoing structure heights within the ring.
  6. Oct–Dec 2023Little change as construction footprints remain stable inside the ring.
  7. Apr–May 2023Little change in the structures visible inside the ring.
  8. Oct–Dec 2022New building footprints and shadows appear after the June 2019 registration.
  9. Apr–May 2022Dry conditions persist inside the ring with no structural activity.
  10. Jan–Mar 2022Sparse vegetation remains visible inside the ring with little change.
  11. Oct–Dec 2021Little change as ground remains largely vacant inside the ring.
  12. Apr–May 2021Dry ground inside the ring with no new construction visible.
  13. Jan–Mar 2021Ring shows vacant land and sparse vegetation with little change from before.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.6 km
  • Baner-Balewadi High Street4.9 km
  • Pune Railway Station16 km
  • Pune Airport (Lohegaon)17.5 km

Nearby

  • SchoolAkshara International School & Junior College0.5 km
  • TempleShani Mandir0.7 km
  • CollegeIndira College of Commerce & Science (ICCS)0.8 km
  • ShoppingPhoenix Mall of the Millennium1.4 km
  • Industrial areaSoftware Technology Parks of India2.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • 6-acre ready landmark.
  • 2 and 3 BHK apartments, carpet area 756–938 sq.ft.

Amenities

  • Clubhouse available.

Last checked 4 Nov 2026.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Dec 2027

Completion date filed with MahaRERA. Not moved since registration.

Beside other Hinjawadi projects

Worked out by Avasetu
Completion date
Not moved by the builder
47 of 150 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
631 of 853
Towers
9 in this registration
The tallest has 17 floors.
Units
853
844 homes, 9 shops or offices.
Registered on
14 Jun 2019
MahaRERA registration
P52100021183
Listed or updated on MahaRERA 26 Feb 2026.
Promoter (builder)
Sukhwani Chawla Developers
Project type
Others
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Tower by tower

9 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
A161330
B161070
C161090
D171200
E17600
F171180
G171180
H - MHADA and Commercial15790
I - Community Building409

As filed with MahaRERA (sanctioned floors).

Sukhwani Chawla Developers: track record

From MahaRERA records

Sukhwani Chawla Developers has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

FAQ

What is the price of Sukhwani Skylines?

Homes from ₹91 L to ₹1.18 Cr, checked on 4 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Sukhwani Skylines?

The completion date filed with MahaRERA is 30 Dec 2027.

What is the MahaRERA number of Sukhwani Skylines?

Sukhwani Skylines is registered with MahaRERA as P52100021183.

How many towers and floors does Sukhwani Skylines have?

MahaRERA lists 9 buildings, the tallest with 17 floors.

How many flats are there in Sukhwani Skylines?

MahaRERA lists 853 units (844 residential, 9 other).

How many homes in Sukhwani Skylines are booked?

631 of 853 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Sukhwani Skylines?

The promoter registered with MahaRERA is Sukhwani Chawla Developers.

Where is Sukhwani Skylines?

Sukhwani Skylines is in Mulshi, Pune district (pincode 411057).

Which school is nearest to Sukhwani Skylines?

Akshara International School & Junior College, about 0.5 km away in a straight line from the map position; the drive is longer.

How far is Sukhwani Skylines from Pune Airport?

About 17.5 km in a straight line from the map position; the drive is longer.

How far is Sukhwani Skylines from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Sukhwani Skylines.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 26 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (4 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (4 Nov 2026)

Get the price sheet and floor plans for Sukhwani Skylines

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment