
Sun Valley by Bramhacorp - Phase 1, Bavdhan
See the site from above todayby Contigo Realty LLP · Bavdhan, Mulshi, Pune district · 411021
- Homes
- 2, 2.5, 3, 3.5, 4.5 BHK
- Price
- from ₹1.08 Cr
- EMI about ₹74,980 a month
- Possession
- Apr 2031
- completion filed with MahaRERA
- Booked
- 142 of 411
- 31 booked in the last 30 days
Avasetu's read (from MahaRERA data, 12 Nov 2026)
The project has 142 of 411 homes booked, or 35%, while 42 similar Bavdhan projects sit at about 16%. Sales added 31 more homes between 13 Oct 2026 and 12 Nov 2026. The completion date filed with MahaRERA is 30 Apr 2031.
What stands out
As of 12 Nov 2026, from MahaRERA and the sources below.
- 35% of homes booked: Buyers have booked 142 of the 411 homes in this phase. Similar projects are at about 16% booked.
- With towers reaching up to 30 floors, the project rises higher than 34 of the 47 under-construction developments in Bavdhan.
- The finish date was originally 31 Dec 2030, and MahaRERA's order added the months to set the current target to 30 Apr 2031.
Updated 22 Nov 2026
Price
2 BHK
₹1.08 Cr – ₹1.91 Cr
Last checked 22 Nov 2026
All-in cost of the 2 BHK at ₹1.08 Cr: about ₹1.21 Cr
Price (agreement value) ₹1.08 Cr GST (5%) ₹5.4 L Stamp duty (7%) ₹7.56 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.21 Cr 2.5 BHK
From ₹2.3 Cr
from 1,455 sq ft · ₹15,808/sq ft
Last checked 22 Nov 2026
All-in cost of the 2.5 BHK at ₹2.3 Cr: about ₹2.58 Cr
Price (agreement value) ₹2.3 Cr GST (5%) ₹11.5 L Stamp duty (7%) ₹16.1 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹2.58 Cr 3 BHK
From ₹1.65 Cr
from 1,180 sq ft · ₹13,983/sq ft
Last checked 22 Nov 2026
All-in cost of the 3 BHK at ₹1.65 Cr: about ₹1.85 Cr
Price (agreement value) ₹1.65 Cr GST (5%) ₹8.25 L Stamp duty (7%) ₹11.55 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.85 Cr 3.5 BHK
From ₹2.7 Cr
from 1,703 sq ft · ₹15,854/sq ft
Last checked 22 Nov 2026
All-in cost of the 3.5 BHK at ₹2.7 Cr: about ₹3.03 Cr
Price (agreement value) ₹2.7 Cr GST (5%) ₹13.5 L Stamp duty (7%) ₹18.9 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹3.03 Cr 4.5 BHK
From ₹3.3 Cr
from 2,129 sq ft · ₹15,500/sq ft
Last checked 22 Nov 2026
All-in cost of the 4.5 BHK at ₹3.3 Cr: about ₹3.7 Cr
Price (agreement value) ₹3.3 Cr GST (5%) ₹16.5 L Stamp duty (7%) ₹23.1 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹3.7 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹74,980 a monthOn a ₹86.4 L loan (80% of ₹1.08 Cr) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Bavdhan usually ask
- 2 BHK about ₹85 L – ₹1.1 Cr (13 projects)
- 3 BHK about ₹1.2 – 1.7 Cr (14 projects)
- 4 BHK about ₹2.4 – 3.25 Cr (6 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Bavdhan, rounded. Use it to judge an offer, not as a price.
Bavdhan average ₹11,432/sq ft across 11 projectsThe middle asking price per sq ft of other projects in Bavdhan.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
Sun Valley by Bramhacorp - Phase 1 from above, today
Sun Valley by Bramhacorp - Phase 1, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Mar 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Mar 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Seasonal greenery appears near the boundaries.
Registered with MahaRERA May 2025 · possession filed for Apr 2031
Satellite images show the site remaining mostly undeveloped with seasonal vegetation changes and land clearing over the years, matching the timeline of the May 2025 MahaRERA registration without significant structural visibility.
The seasons before
- Apr–May 2026Little change observed on the site.
- Jan–Mar 2026Little change, bare land persists in the ring.
- Oct–Dec 2025Monsoon vegetation recedes, leaving bare ground.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
- Apr–May 2025Little change following the May 2025 registration.
- Jan–Mar 2025Sparse vegetation, land remains largely cleared.
- Oct–Dec 2024Green patches appear around the ring.
- Apr–May 2024Little change, dry soil observed.
- Jan–Mar 2024Minimal plant cover, bare ground dominates the area.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Baner-Balewadi High Street7.6 km
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)10.6 km
- Pune Railway Station11.2 km
- Magarpatta City16.5 km
Nearby
- Industrial areaGalore Tech IT Park1.2 km
- Industrial areaKapil Zenith IT park1.3 km
- Industrial areaLohia Jain IT Park, Kothrud1.9 km
- BankDombivli Nagari Sahakari Bank Ltd.2.2 km
- Bus standKothrud4.3 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 12 Nov 2026Possession date
30 Apr 2031
The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2030.
Sun Valley by Bramhacorp - Phase 1: what changed, as we read it
31 more homes booked between 13 Oct 2026 and 12 Nov 2026: 111 to 142, of 411 homes.
- 12 Nov 2026: 142 booked
- 13 Oct 2026: 111 booked
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Bavdhan projects
Worked out by Avasetu- Homes booked
- 35%
- The middle of 42 Bavdhan projects registered within a year of it: 16%.
- Completion date
- Not moved by the builder
- 30 of 121 Bavdhan projects being built moved theirs 3 months or more.
From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 142 of 411
- Towers
- 3 in this registration
- The tallest has 30 floors.
- Registered on
- 6 May 2025
- MahaRERA registration
- P52100080203
- Listed or updated on MahaRERA 6 May 2025.
- Promoter (builder)
- Contigo Realty LLP
- Project type
- Residential / Group Housing
- Pincode
- 411021
Check before you book
From MahaRERA- Completion is filed for Apr 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
- Towers go up to 30 floors. Ask how many lifts serve your tower and how many homes share them.
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| Tower 1 | 30 | 108 | 0 |
| Tower 2 | 30 | 108 | 0 |
| Tower 3 and 4 | 24 | 195 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 26 floors
- Land
- 11 acres
Last checked 22 Nov 2026. MahaRERA counts where they differ.
Contigo Realty LLP: track record
From MahaRERA recordsContigo Realty LLP has 2 projects in our MahaRERA register for Pune.
- HILL VIEWcompletion filed 30 Apr 2031
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Bavdhan
- 7 Anshulfrom ₹88 L · possession Aug 2031Starts ₹20 L lower than Sun Valley by Bramhacorp - Phase 1
- A.A. Aurorapossession Apr 2031
- Flow Bavdhanpossession Dec 2031
- Hill Viewpossession Apr 2031
- Mantra Mistara Phase Ipossession Apr 2031
- Puranik Abitante Fiore2 BHK · from ₹63.99 L · possession Apr 2031Starts ₹44 L lower than Sun Valley by Bramhacorp - Phase 1
More by Contigo Realty LLP
FAQ
What is the price of Sun Valley by Bramhacorp - Phase 1?
2 BHK: ₹1.08 Cr to ₹1.91 Cr; 2.5 BHK: ₹2.3 Cr; 3 BHK: ₹1.65 Cr; 3.5 BHK: ₹2.7 Cr; 4.5 BHK: ₹3.3 Cr, checked on 22 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Sun Valley by Bramhacorp - Phase 1?
The completion date filed with MahaRERA is 30 Apr 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Sun Valley by Bramhacorp - Phase 1?
Sun Valley by Bramhacorp - Phase 1 is registered with MahaRERA as P52100080203.
How many towers and floors does Sun Valley by Bramhacorp - Phase 1 have?
MahaRERA lists 3 buildings, the tallest with 30 floors.
How many flats are there in Sun Valley by Bramhacorp - Phase 1?
MahaRERA lists 411 units.
How many homes in Sun Valley by Bramhacorp - Phase 1 are booked?
142 of 411 homes were booked as per MahaRERA on 12 Nov 2026.
Who is the builder of Sun Valley by Bramhacorp - Phase 1?
The promoter registered with MahaRERA is Contigo Realty LLP. Our register has 2 Pune projects by Contigo Realty LLP.
Where is Sun Valley by Bramhacorp - Phase 1?
Sun Valley by Bramhacorp - Phase 1 is in 411021, Mulshi, Pune district (pincode 411021).
How far is Sun Valley by Bramhacorp - Phase 1 from Baner-Balewadi High Street?
About 7.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Sun Valley by Bramhacorp - Phase 1.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 6 May 2025
- Dates and homes bookedFrom MahaRERA
Checked 22 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Nov 2026
- Location and nearbyGathered and checked
Checked 22 Nov 2026
- DescriptionGathered and checked
Checked 22 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (22 Nov 2026)
Get the price sheet and floor plans for SUN VALLEY BY BRAMHACORP - PHASE 1
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.