Sun Valley by Bramhacorp - Phase 1 from space, 2024 to 2026
Satellite images show the site remaining mostly undeveloped with seasonal vegetation changes and land clearing over the years, matching the timeline of the May 2025 MahaRERA registration without significant structural visibility.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Seasonal greenery appears near the boundaries.
- Apr–May 2026Little change observed on the site.
- Jan–Mar 2026Little change, bare land persists in the ring.
- Oct–Dec 2025Monsoon vegetation recedes, leaving bare ground.
- Apr–May 2025Little change following the May 2025 registration.
- Jan–Mar 2025Sparse vegetation, land remains largely cleared.
- Oct–Dec 2024Green patches appear around the ring.
- Apr–May 2024Little change, dry soil observed.
- Jan–Mar 2024Minimal plant cover, bare ground dominates the area.
Sun Valley by Bramhacorp - Phase 1: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.