MahaRERA registered PM1260002500070Verify on MahaRERA (opens in a new tab)Early stage

The Aqua Retreat, Hinjawadi

Filed on MahaRERA as The Aqua Retreat at Godrej Park World

See the site from above today

by Maan-Hinje Township Developers Private Limited · Hinjawadi, Mulshi, Pune district · 411057

Price
from ₹1.23 Cr
EMI about ₹85,394 a month
Possession
Jan 2032
completion filed with MahaRERA
Booked
632 of 1,864

What stands out

As of 27 Nov 2026, from MahaRERA and the sources below.

  • Taller than 45 of 48 projects: The buildings in this development reach up to 38 floors, which is higher than most other active projects in the local area.
  • While 539 of 1864 homes are booked, this 29% booking rate is higher than the 13% seen in similar projects registered nearby within the same year.
  • Completion date 30 Jan 2032: The builder originally filed for a September 2031 finish, and the final date reflects 4 months added by a MahaRERA order.

Updated 21 Nov 2026

Price

  • Homes

    From ₹1.23 Cr

    Last checked 25 Nov 2026

    All-in cost of a home at ₹1.23 Cr: about ₹1.38 Cr
    Price (agreement value)₹1.23 Cr
    GST (5%)₹6.15 L
    Stamp duty (7%)₹8.61 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.38 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹85,394 a monthOn a ₹98.4 L loan (80% of ₹1.23 Cr) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹40 – 80 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (47 projects)
  • 2.5 BHK about ₹80 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹1 – 1.6 Cr (45 projects)
  • 3.5 BHK about ₹1.6 – 2.3 Cr (5 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (13 projects)
  • 4.5 BHK about ₹1.7 – 2.1 Cr (3 projects)
  • 5 BHK about ₹2 – 2.6 Cr (3 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,607/sq ft across 26 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

The Aqua Retreat from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

The Aqua Retreat, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. The Aqua Retreat from above, satellite picture of Nov 2022
    Nov 2022
  2. The Aqua Retreat from above, satellite picture of Jan 2024
    Jan 2024
  3. The Aqua Retreat from above, satellite picture of Feb 2025
    Feb 2025
  4. The Aqua Retreat from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Structures and shadows persist within the ring, showing ongoing site activity.

Registered with MahaRERA Jun 2025 · possession filed for Jan 2032

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jun 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026New bright structures and cleared ground are visible inside and around the ring.
  2. Jan–Mar 2026Dark shadows and new structures appear inside the ring following registration.
  3. Oct–Dec 2025Work shows after the June 2025 registration with new footprints and activity.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Dry land with little change just before the June 2025 MahaRERA registration.
  2. Jan–Mar 2025Sparse vegetation and open ground inside the ring before project registration.
  3. Oct–Dec 2024Little change visible as the ground remains largely open and undeveloped.
  4. Apr–May 2024Dry conditions persist inside the ring with unchanged surroundings and cleared soil.
  5. Jan–Mar 2024Ground remains cleared with faint tracks and no new building footprints visible.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.8 km
  • Baner-Balewadi High Street5 km
  • Pune Railway Station16.4 km
  • Pune Airport (Lohegaon)19 km

Nearby

  • ShoppingStreets of Europe0.7 km
  • Industrial areaRadius Tech Park1.1 km
  • Industrial areaSoftware Technology Parks of India1.3 km
  • ShoppingGrand Highstreet1.7 km
  • SchoolAkshara International School & Junior College3.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Around The Aqua Retreat

Measured from the project's pin, each with its source and date.

ToBy road9 am6 pm, back
Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)2.3 km8 min9 min
Baner-Balewadi offices (Balewadi High Street)6.3 km15-27 min16-31 min
Hinjawadi Phase 2 (Rajiv Gandhi Infotech Park)6.6 km18-28 min13-24 min
Hinjawadi Phase 3 (Rajiv Gandhi Infotech Park)9.6 km22-35 min19-33 min
Pune Airport (Lohegaon)29.2 km62-107 min70-115 min

Driving from the project's pin on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026

What's changing nearby

  • Metro Line 3 (Hinjawadi to Shivajinagar)Open: passenger trains run between Hinjawadi and District Court at 17 of the 23 stations, after the inauguration on 3 November. The other six, including Baner's and Shivajinagar, are to open in stages by January 2027.Status of 4 Nov 2026

Being built around it

17 projects with 11,308 homes being built within 2 km, due 2027 to 2031.

From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026

Asked rent, from 139 listings within 2 km, Nov 2026

SizeA monthMiddleListingsYield
1 BHK₹22,000 to ₹26,000₹23,00037
2 BHK₹25,000 to ₹34,000₹29,000673.8%
3 BHK₹32,000 to ₹45,000₹35,000353.3%

What owners ask on listings, not what tenants pay; the middle half of asks. Yield: a year's middle rent over the middle asking price for that size. Sources: MagicBricks rent listings, NoBroker rent listings, Square Yards rent listings, Asking prices of new projects (Avasetu project pages) · measured 28 Nov 2026

Work nearby

Companies from each hub's own tenant list; straight-line distance. Source: MahaRERA project register (our copy) and each hub's own tenant list · measured 28 Nov 2026

Project facts

  • Project offers 1BHK, 2BHK, and 3BHK configurations.

Last checked 8 Nov 2026.

MahaRERA record

From MahaRERA, read 27 Nov 2026

Possession date

30 Jan 2032

The completion date filed with MahaRERA is 30 Jan 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Sep 2031.

Beside other Hinjawadi projects

Worked out by Avasetu
Homes booked
34%
The middle of 37 Hinjawadi projects registered within a year of it: 17%.
Completion date
Not moved by the builder
45 of 148 Hinjawadi projects being built moved theirs 3 months or more.

From MahaRERA records read 27 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
632 of 1,864
Towers
14 in this registration
The tallest has 38 floors.
Units
1,864
1,852 homes, 12 shops or offices.
Registered on
12 Jun 2025
MahaRERA registration
PM1260002500070
Listed or updated on MahaRERA 24 Nov 2026.
Promoter (builder)
Maan-Hinje Township Developers Private Limited
Project type
Mixed
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Jan 2032, about 5 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • A large project: 1,864 homes in 14 towers, built in phases. Ask when your own tower and the clubhouse are due, not only the project.
  • Towers go up to 38 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

14 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER-1, WING-A381266
TOWER-1, WING-B381296
TOWER-2, WING-C381270
TOWER-2, WING-D381350
TOWER-3, WING-E381360
TOWER-3, WING-F381290
TOWER-4, WING-G381350
TOWER-4, WING-H381310
TOWER-5, WING-I381310
TOWER-5, WING-J381350
TOWER-6, WING-K381290
TOWER-6, WING-L381390
TOWER-7, WING-M381390
TOWER-7, WING-N381310

As filed with MahaRERA (sanctioned floors).

Maan-Hinje Township Developers Private Limited: track record

From MahaRERA records

Maan-Hinje Township Developers Private Limited has 3 projects in our MahaRERA register for Pune.

All 3 projects by Maan-Hinje Township Developers Private Limited in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

More by Maan-Hinje Township Developers Private Limited

FAQ

What is the price of The Aqua Retreat?

Homes from ₹1.23 Cr, checked on 25 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of The Aqua Retreat?

The completion date filed with MahaRERA is 30 Jan 2032; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of The Aqua Retreat?

The Aqua Retreat is registered with MahaRERA as PM1260002500070.

How many towers and floors does The Aqua Retreat have?

MahaRERA lists 14 buildings, the tallest with 38 floors.

How many flats are there in The Aqua Retreat?

MahaRERA lists 1864 units (1852 residential, 12 other).

How many homes in The Aqua Retreat are booked?

632 of 1864 homes were booked as per MahaRERA on 27 Nov 2026.

Who is the builder of The Aqua Retreat?

The promoter registered with MahaRERA is Maan-Hinje Township Developers Private Limited. Our register has 3 Pune projects by Maan-Hinje Township Developers Private Limited.

Where is The Aqua Retreat?

The Aqua Retreat is in Mulshi, Pune district (pincode 411057).

Which school is nearest to The Aqua Retreat?

Akshara International School & Junior College, about 3.8 km away in a straight line from the map position; the drive is longer.

How far is The Aqua Retreat from Pune Airport?

About 19 km in a straight line from the map position; the drive is longer.

How far is The Aqua Retreat from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.8 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to The Aqua Retreat.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 24 Nov 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 8 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 8 Nov 2026

  • DescriptionGathered and checked

    Checked 8 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (25 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (8 Nov 2026)

Get the price sheet and floor plans for The Aqua Retreat

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment