Skip to main contentSkip to navigation
VTP Bellissimo, from the builder's websiteVTP Realty logo
The builder's picture
MahaRERA registered P52100033888Verify on MahaRERA (opens in a new tab)

VTP Bellissimo Phase 1, Hinjawadi

See the site from above today

by VTP Realty · Hinjawadi, Mulshi, Pune district · 411057

Homes
2, 2.5, 3 BHK
Price
from ₹79.97 L
EMI about ₹55,520 a month
Possession
from Apr 2027
its parts filed Apr 2027 to Apr 2028
Booked
1,472 of 1,610
across all 3 of its MahaRERA registrations

Avasetu's read (from MahaRERA data, 20 Oct 2026)

With 1193 of 1246 homes booked (96%), this project is selling well ahead of 34 similar Hinjawadi projects at about 74%. However, the builder's timeline record is worrying, as 29 of 55 VTP Realty projects in Pune moved their completion date 3 months or more later. Ask the builder how they plan to finish by the 30 Apr 2027 completion date.

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • 96% of homes booked: Buyers have booked 1193 of the 1246 homes in this phase. Similar projects are at about 74%.
  • Out of 55 VTP Realty projects in Pune with both dates listed on MahaRERA, 29 moved their completion date later by 3 months or more.

Updated 21 Nov 2026

Pictures

VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website
VTP Bellissimo, from the builder's website

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • 2 BHK

    ₹79.97 L – ₹1.15 Cr

    from 851 sq ft · ₹9,397/sq ft

    Last checked 4 Nov 2026

    All-in cost of the 2 BHK at ₹79.97 L: about ₹89.87 L
    Price (agreement value)₹79.97 L
    GST (5%)₹4 L
    Stamp duty (7%)₹5.6 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹89.87 L
  • 2.5 BHK

    ₹94 L – ₹96 L

    Last checked 4 Nov 2026

    All-in cost of the 2.5 BHK at ₹94 L: about ₹1.06 Cr
    Price (agreement value)₹94 L
    GST (5%)₹4.7 L
    Stamp duty (7%)₹6.58 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.06 Cr
  • 3 BHK

    ₹93 L – ₹1.9 Cr

    from 1,217 sq ft · ₹7,642/sq ft

    Last checked 4 Nov 2026

    All-in cost of the 3 BHK at ₹93 L: about ₹1.04 Cr
    Price (agreement value)₹93 L
    GST (5%)₹4.65 L
    Stamp duty (7%)₹6.51 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.04 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹55,520 a monthOn a ₹63.98 L loan (80% of ₹79.97 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for VTP Bellissimo Phase 1

  • 4 BHK about ₹1.4 – 1.6 Cr
  • 4.5 BHK about ₹1.6 – 1.8 Cr
  • 5 BHK about ₹1.7 – 2 Cr

Our own rounded guide, checked against the area on 4 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
  • 2.5 BHK about ₹90 L – ₹1.5 Cr (3 projects)
  • 3 BHK about ₹1 – 1.6 Cr (43 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (13 projects)
  • 4.5 BHK about ₹1.9 – 2.3 Cr (4 projects)
  • 5 BHK about ₹2.4 – 2.8 Cr (3 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,555/sq ft across 20 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

VTP Bellissimo Phase 1 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

VTP Bellissimo Phase 1, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. VTP Bellissimo Phase 1 from above, satellite picture of Nov 2022
    Nov 2022
  2. VTP Bellissimo Phase 1 from above, satellite picture of Jan 2024
    Jan 2024
  3. VTP Bellissimo Phase 1 from above, satellite picture of Feb 2025
    Feb 2025
  4. VTP Bellissimo Phase 1 from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Construction activity and tall building shadows continue around the ring.

Registered with MahaRERA Mar 2022 · possession filed for from Apr 2027

Season by season, Jan 2021 to Oct 2026: 17 seasons, October to May (the monsoon is under cloud).

VTP Bellissimo Phase 1 shows initial land clearing leading to major construction activity following its 2022 MahaRERA registration. Over subsequent years, dark shadows from tall tower structures emerge and expand across the ring area, reflecting active development.

The seasons before

  1. Apr–May 2026Little change, structural footprints and shadows remain stable.
  2. Jan–Mar 2026Dark winter shadows stretch across the ring from tall towers.
  3. Oct–Dec 2025Dense shadows indicate advanced structural heights surrounding the ring.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change, heavy shadow patterns remain visible.
  2. Jan–Mar 2025Prominent shadows from tall structures cross the ring area.
  3. Oct–Dec 2024Long shadows indicate tall buildings under construction nearby.
  4. Apr–May 2024Little change, ongoing structural work and shadows persist.
  5. Jan–Mar 2024Ground cleared
  6. Oct–Dec 2023Groundwork and early foundations appear within the ring boundaries.
  7. Apr–May 2023Little change, dry excavated soil visible inside the ring.
  8. Jan–Mar 2023Clearing continues with bare soil dominating the ring area.
  9. Oct–Dec 2022Ground clearing is evident inside the ring after recent registrations.
  10. Jan–Mar 2022Bare earth and minimal sparse vegetation are visible in the ring.
  11. Oct–Dec 2021Vegetation appears in parts of the ring following monsoon season.
  12. Apr–May 2021Little change, dry ground remains visible inside the ring.
  13. Jan–Mar 2021Ring shows green patches and bare ground with no structures.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

See the 1 floor plan

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)1.3 km
  • Baner-Balewadi High Street5 km
  • Pune Railway Station16.5 km
  • Pune Airport (Lohegaon)18.9 km

Nearby

  • ShoppingStreets of Europe0.2 km
  • Industrial areaSoftware Technology Parks of India0.8 km
  • Industrial areaRadius Tech Park1 km
  • ShoppingGrand Highstreet1.3 km
  • SchoolAkshara International School & Junior College3.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

Last checked 4 Nov 2026.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Apr 2027 to 29 Apr 2028

The completion dates filed with MahaRERA for its 3 registrations; each is in the table of towers and phases below.

For P52100033888: 30 Apr 2027. Completion date filed with MahaRERA. At registration: 30 Mar 2026. Moved 9 months later, 4 of them by MahaRERA's August 2026 order for most projects.

Ask for the possession date in writing in your agreement for sale.

The record

Homes booked
1,472 of 1,610
Across all 3 of its MahaRERA registrations. P52100033888 alone: 1,193 of 1,246.
Towers
7 in this registration
The tallest has 34 floors. 9 in the whole project.
Units
1,246
1,225 homes, 21 shops or offices.
Registered on
14 Mar 2022
Main MahaRERA registration
P52100033888
Listed or updated on MahaRERA 25 Aug 2026.
Promoter (builder)
Magnite Developers Private Limited
Project type
Others
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • The builder has moved the completion date 9 months later since registration, from Mar 2026 to Apr 2027 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
  • A large project: 1,610 homes in 7 towers, built in phases. Ask when your own tower and the clubhouse are due, not only the project.
  • Towers go up to 34 floors. Ask how many lifts serve your tower and how many homes share them.
  • 21 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 registrations, 7 buildings

Towers and phases (3 registrations)

From MahaRERA

MahaRERA holds VTP Bellissimo Phase 1 as 3 registrations. Together they list 1,610 homes, 1,472 booked.

RegistrationCompletion filedBooked
VTP BELLISSIMO PHASE 1P52100033888 (opens in a new tab)30 Apr 2027at registration 30 Mar 20261,193 of 1,246
VTP BELLISSIMO PHASE 3P52100048331 (opens in a new tab)31 Jul 2027at registration 31 Mar 2027142 of 208
VTP BELLISSIMO PHASE 2P52100047246 (opens in a new tab)29 Apr 2028at registration 30 Dec 2026137 of 156

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER 1312050
TOWER 2312400
TOWER 3342080
TOWER 4341560
TOWER 5341564
TOWER 63410413
TOWER 7341564

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 29 floors

Last checked 4 Nov 2026. MahaRERA counts where they differ.

VTP Realty: track record

From MahaRERA records

VTP Realty has 50 projects in our MahaRERA register for Pune. 27 of 50 with both dates moved the completion date 3 months or more later, by 20 months on average.

All 50 projects by VTP Realty in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

FAQ

What is the price of VTP Bellissimo Phase 1?

2 BHK: ₹79.97 L to ₹1.15 Cr; 2.5 BHK: ₹94 L to ₹96 L; 3 BHK: ₹93 L to ₹1.9 Cr, checked on 4 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of VTP Bellissimo Phase 1?

The 3 MahaRERA registrations of VTP Bellissimo Phase 1 have filed completion dates from 30 Apr 2027 to 29 Apr 2028. For P52100033888: The completion date filed with MahaRERA is 30 Apr 2027. At registration it was 30 Mar 2026. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.

What is the MahaRERA number of VTP Bellissimo Phase 1?

VTP Bellissimo Phase 1 is registered with MahaRERA in 3 parts (towers or phases): P52100033888, P52100048331, P52100047246.

How many towers and floors does VTP Bellissimo Phase 1 have?

MahaRERA lists 7 buildings in registration P52100033888, one of the project's 3, the tallest with 34 floors.

How many flats are there in VTP Bellissimo Phase 1?

MahaRERA lists 1610 units across all 3 of its MahaRERA registrations; P52100033888 has 1246.

How many homes in VTP Bellissimo Phase 1 are booked?

1472 of 1610 homes were booked as per MahaRERA on 19 Nov 2026, across all 3 of its MahaRERA registrations.

Who is the builder of VTP Bellissimo Phase 1?

The promoter registered with MahaRERA is Magnite Developers Private Limited. Our register has 50 Pune projects by VTP Realty; 27 of 50 with both dates moved their completion date 3 months or more later.

Where is VTP Bellissimo Phase 1?

VTP Bellissimo Phase 1 is in Mulshi, Pune district (pincode 411057).

Which school is nearest to VTP Bellissimo Phase 1?

Akshara International School & Junior College, about 3.3 km away in a straight line from the map position; the drive is longer.

How far is VTP Bellissimo Phase 1 from Pune Airport?

About 18.9 km in a straight line from the map position; the drive is longer.

How far is VTP Bellissimo Phase 1 from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 1.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VTP Bellissimo Phase 1.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 25 Aug 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (4 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (4 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (4 Nov 2026)

Get the price sheet and floor plans for VTP BELLISSIMO PHASE 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment