Skip to main contentSkip to navigation

VTP Aurelia Phase 1 from space, 2021 to 2026

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

41 clear months, Jan 2021 to Nov 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Active building footprints and structural shadows expand across the ring area.
  2. Apr–May 2026Construction structures and machinery footprints are clearly visible within the ring.
  3. Jan–Mar 2026Building footprints and dark structural shadows indicate active construction inside the ring.
  4. Oct–Dec 2025New foundation footprints and early building structures emerge in the ring.
  5. Apr–May 2025Bare ground and early site activity appear following the July 2025 registration.
  6. Jan–Mar 2025Soil is exposed and cleared inside the ring ahead of work.
  7. Oct–Dec 2024Ground remains cleared with minimal vegetation inside the ring.
  8. Apr–May 2024Dry earth and cleared ground are visible across the ring.
  9. Jan–Mar 2024Vegetation clears partially, revealing bare soil patches inside the ring.
  10. Oct–Dec 2023Greenery returns to the ring area following seasonal rains.
  11. Apr–May 2023Dry conditions prevail inside the ring with sparse vegetation remnants.
  12. Jan–Mar 2023Vegetation thrives across the ring area with no new structures.
  13. Oct–Dec 2022Green fields persist inside the ring with no visible site preparation.
  14. Jan–Mar 2022Dense vegetation fills the ring, maintaining the agricultural appearance.
  15. Oct–Dec 2021Post-monsoon greenery covers the entire ring area uniformly.
  16. Apr–May 2021Little change, dry soil and sparse vegetation remain inside the ring.
  17. Jan–Mar 2021Vegetation covers the ring, showing open farmland with no construction activity.

VTP Aurelia Phase 1: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.