VTP Aurelia Phase 1, Wagholi

Sold as Kharadi by 6 property sites; we list it under Wagholi (pincode 412307).

See the site from above today

by VTP Realty · Wagholi, Pune · 412307

Homes
2 & 3 BHK
Price
from ₹93 L
EMI about ₹64,566 a month
Possession
Jan 2031
completion filed with MahaRERA
Booked
502 of 901

Listed by House DealSee it on House Deal's page →

Avasetu's read (from MahaRERA data, 13 Oct 2026)

At 56% booked, this project is well ahead of 15 similar Manjari projects which are at about 15%. However, VTP Realty has moved completion dates 3 months or more later on 29 of 55 Pune projects with both dates on MahaRERA. With completion date filed with MahaRERA set for 30 Jan 2031, ask the builder about their timeline record.

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 56% of homes booked: Buyers have already booked 502 of the 901 homes in this phase. Similar projects are at about 15% booked.
  • The original finish date was 30 Sep 2030, and MahaRERA's order added the months to reach January 2031 without builder delays.

Updated 21 Nov 2026

Pictures

VTP Aurelia Phase 1, picture 2
VTP Aurelia Phase 1, picture 3
VTP Aurelia Phase 1, picture 4
VTP Aurelia Phase 1, picture 5
VTP Aurelia, from the builder's website
VTP Aurelia, from the builder's website
VTP Aurelia, from the builder's website

From House Deal's listing and the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • Sample flat · from House Deal · Watch

Price

On offer

Listed by House Deal

From ₹93 L

2 & 3 BHK · apartments · 739 to 1,092 sq ft carpet

HomeCarpet areaPricePer sq ft
2 BHK739 sq ft₹93 L₹12,585/sq ft
2 BHK768 sq ft₹95 L₹12,370/sq ft
2 BHK808 sq ft₹1.02 Cr₹12,624/sq ft
3 BHK1,008 sq ft₹1.3 Cr₹12,897/sq ft
3 BHK1,092 sq ft₹1.39 Cr₹12,729/sq ft

With a home loan, your own cash for the 2 BHK: about ₹25.41 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

All-in cost of the 2 BHK at ₹93 L: about ₹1.04 Cr
Price (agreement value)As quoted, before taxes.₹93 L
GST (5%)On a home being built.₹4.65 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹6.51 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹1.04 Cr

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 30 Oct 2026.

Wagholi average ₹8,168/sq ft across 13 projectsThe middle asking price per sq ft of other projects in Wagholi.

Want this at today's price?

Prices change. The Avasetu team confirms today's price, what is still available and the full cost.

Ask for the current offer

VTP Aurelia Phase 1 from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

VTP Aurelia Phase 1, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. VTP Aurelia Phase 1 from above, satellite picture of Nov 2022
    Nov 2022
  2. VTP Aurelia Phase 1 from above, satellite picture of Jan 2024
    Jan 2024
  3. VTP Aurelia Phase 1 from above, satellite picture of Jan 2025
    Jan 2025
  4. VTP Aurelia Phase 1 from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Active building footprints and structural shadows expand across the ring area.

possession filed for Jan 2031

Month by month, Jan 2021 to Nov 2026: 41 clear months, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Construction structures and machinery footprints are clearly visible within the ring.
  2. Jan–Mar 2026Building footprints and dark structural shadows indicate active construction inside the ring.
  3. Oct–Dec 2025New foundation footprints and early building structures emerge in the ring.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Bare ground and early site activity appear following the July 2025 registration.
  2. Jan–Mar 2025Soil is exposed and cleared inside the ring ahead of work.
  3. Oct–Dec 2024Ground remains cleared with minimal vegetation inside the ring.
  4. Apr–May 2024Dry earth and cleared ground are visible across the ring.
  5. Jan–Mar 2024Vegetation clears partially, revealing bare soil patches inside the ring.
  6. Oct–Dec 2023Greenery returns to the ring area following seasonal rains.
  7. Apr–May 2023Dry conditions prevail inside the ring with sparse vegetation remnants.
  8. Jan–Mar 2023Vegetation thrives across the ring area with no new structures.
  9. Oct–Dec 2022Green fields persist inside the ring with no visible site preparation.
  10. Jan–Mar 2022Dense vegetation fills the ring, maintaining the agricultural appearance.
  11. Oct–Dec 2021Post-monsoon greenery covers the entire ring area uniformly.
  12. Apr–May 2021Little change, dry soil and sparse vegetation remain inside the ring.
  13. Jan–Mar 2021Vegetation covers the ring, showing open farmland with no construction activity.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

See the 1 floor plan

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi3.9 km
  • World Trade Center, Kharadi4 km
  • Magarpatta City6.8 km
  • Pune Airport (Lohegaon)8.9 km

Nearby

  • CollegeG.H. Raisoni College OF Engineering & Management, PUNE3.2 km
  • Industrial areaEon IT Park 23.4 km
  • Industrial areaEon IT Park Pune3.6 km
  • Industrial areaInternational Tech Park Pune, Kharadi3.7 km
  • Railway stationManjari Budruk3.8 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Last checked 19 Nov 2026.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Jan 2031

The completion date filed with MahaRERA is 30 Jan 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Sep 2030.

Beside other Wagholi projects

Worked out by Avasetu
Homes booked
56%
The middle of 37 Wagholi projects registered within a year of it: 6%.
Completion date
Not moved by the builder
26 of 95 Wagholi projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
502 of 901
Towers
3 in this registration
The tallest has 40 floors. 4 in the whole project (builder's site).
Units
901
858 homes, 43 shops or offices.
Registered on
16 Jul 2025
MahaRERA registration
PM1260002500280
Listed or updated on MahaRERA 22 Jul 2025.
Promoter (builder)
Asoj Realty LLP
Project type
Mixed
Pincode
412307

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • Completion is filed for Jan 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • About 180 homes per acre (901 homes on 5 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • Towers go up to 40 floors. Ask how many lifts serve your tower and how many homes share them.
  • 43 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER-14028614
TOWER-24028614
TOWER-34028615

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 36 floors
From the builder's site
Land
5 acres

Last checked 19 Nov 2026. MahaRERA counts where they differ.

VTP Realty: track record

From MahaRERA records

VTP Realty has 50 projects in our MahaRERA register for Pune. 27 of 50 with both dates moved the completion date 3 months or more later, by 20 months on average.

All 50 projects by VTP Realty in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Wagholi

FAQ

What is the price of VTP Aurelia Phase 1?

A local agent quotes from ₹93 L for VTP Aurelia Phase 1. Prices change often: ask for today's price and what it includes.

What is the possession date of VTP Aurelia Phase 1?

The completion date filed with MahaRERA is 30 Jan 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of VTP Aurelia Phase 1?

VTP Aurelia Phase 1 is registered with MahaRERA as PM1260002500280.

How many towers and floors does VTP Aurelia Phase 1 have?

MahaRERA lists 3 buildings, the tallest with 40 floors.

How many flats are there in VTP Aurelia Phase 1?

MahaRERA lists 901 units (858 residential, 43 other).

How many homes in VTP Aurelia Phase 1 are booked?

502 of 901 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of VTP Aurelia Phase 1?

The promoter registered with MahaRERA is Asoj Realty LLP. Our register has 50 Pune projects by VTP Realty; 27 of 50 with both dates moved their completion date 3 months or more later.

Where is VTP Aurelia Phase 1?

VTP Aurelia Phase 1 is in Wagholi, Pune (pincode 412307).

Which railway station is nearest to VTP Aurelia Phase 1?

Manjari Budruk, about 3.8 km away in a straight line from the map position; the drive is longer.

How far is VTP Aurelia Phase 1 from Pune Airport?

About 8.9 km in a straight line from the map position; the drive is longer.

How far is VTP Aurelia Phase 1 from EON IT Park, Kharadi?

About 3.9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VTP Aurelia Phase 1.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 22 Jul 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 19 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 19 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (30 Oct 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (19 Nov 2026)

Get the price sheet and floor plans for VTP AURELIA PHASE 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment