Skip to main contentSkip to navigation
Map: where Shapoorji Pallonji Vyomora is
The project's position on the map
MahaRERA registered PR1260002600999Verify on MahaRERA (opens in a new tab)

Shapoorji Pallonji Vyomora, Hinjawadi

Filed on MahaRERA as VYOMORA PHASE 1

See the site from above today

by Shapoorji Pallonji (Joyville) · Hinjawadi, Mulshi, Pune district · 411057

Price
from ₹84.99 L
EMI about ₹59,005 a month
Possession
from Aug 2031
its parts filed Aug 2031 to Dec 2031
Booked
0 of 720
across all 3 of its MahaRERA registrations

What stands out

As of 19 Nov 2026, from MahaRERA and the sources below.

  • None of the 330 homes in this registration are booked, while similar projects are at about 1%.
  • MahaRERA added 4 months: MahaRERA's order added the months to change the completion date from April 2031 to August 2031.

Updated 21 Nov 2026

Price

  • Homes

    ₹84.99 L – ₹2.75 Cr

    Last checked 5 Nov 2026

    All-in cost of a home at ₹84.99 L: about ₹95.49 L
    Price (agreement value)₹84.99 L
    GST (5%)₹4.25 L
    Stamp duty (7%)₹5.95 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹95.49 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹59,005 a monthOn a ₹67.99 L loan (80% of ₹84.99 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (45 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (44 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,462/sq ft across 21 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Shapoorji Pallonji Vyomora from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Shapoorji Pallonji Vyomora, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Shapoorji Pallonji Vyomora from above, satellite picture of Nov 2022
    Nov 2022
  2. Shapoorji Pallonji Vyomora from above, satellite picture of Jan 2024
    Jan 2024
  3. Shapoorji Pallonji Vyomora from above, satellite picture of Feb 2025
    Feb 2025
  4. Shapoorji Pallonji Vyomora from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Open land shows seasonal plant growth following the monsoon season.

Registered with MahaRERA Jul 2026 · possession filed for from Aug 2031

Season by season, Jan 2024 to Oct 2026: 9 seasons, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jul 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Dry ground with no structural changes inside the ring.
  2. Jan–Mar 2026Undeveloped land persists around the map pin ahead of registered project timelines.
  3. Oct–Dec 2025Seasonal vegetation appears across the plot.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
  1. Apr–May 2025Dry terrain with minimal visible activity inside the ring.
  2. Jan–Mar 2025Open ground remains largely untouched with surrounding urban features.
  3. Oct–Dec 2024Patchy vegetation growth observed within the ring boundary.
  4. Apr–May 2024Dry earth visible with no major alterations in the area.
  5. Jan–Mar 2024Sparse plant cover persists on the open land.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)2.7 km
  • Baner-Balewadi High Street5.6 km
  • Pune Railway Station16.9 km
  • Pune Airport (Lohegaon)19.8 km

Nearby

  • ShoppingStreets of Europe1.5 km
  • Industrial areaRadius Tech Park2 km
  • Industrial areaSoftware Technology Parks of India2.2 km
  • ShoppingGrand Highstreet2.3 km
  • Industrial areaRajiv Gandhi Infotech Park, Maan Phase-33.5 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Last checked 5 Nov 2026.

MahaRERA record

From MahaRERA, read 19 Nov 2026

Possession date

30 Aug 2031 to 31 Dec 2031

The completion dates filed with MahaRERA for its 3 registrations; each is in the table of towers and phases below.

For PR1260002600999: 30 Aug 2031. The completion date filed with MahaRERA is 30 Aug 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Apr 2031.

The record

Homes booked
0 of 720
Across all 3 of its MahaRERA registrations. PR1260002600999 alone: 0 of 330.
Towers
2 in this registration
The tallest has 24 floors.
Registered on
1 Jul 2026
Main MahaRERA registration
PR1260002600999
Listed or updated on MahaRERA 1 Oct 2026.
Promoter (builder)
Joyville Shapoorji Housing Private Limited
Project type
Residential / Group Housing
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Aug 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.

Tower by tower

3 registrations, 2 buildings

Towers and phases (3 registrations)

From MahaRERA

MahaRERA holds Shapoorji Pallonji Vyomora as 3 registrations. Together they list 720 homes, 0 booked.

RegistrationCompletion filedBooked
VYOMORA PHASE 1PR1260002600999 (opens in a new tab)30 Aug 2031at registration 30 Apr 20310 of 330
VYOMORA PHASE 3PM1261012602248 (opens in a new tab)31 Aug 20310 of 330
VYOMORA PHASE 2PM1261012602233 (opens in a new tab)31 Dec 20310 of 60

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower 1241650
Tower 2241650

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
25 acres

Last checked 5 Nov 2026. MahaRERA counts where they differ.

Shapoorji Pallonji (Joyville): track record

From MahaRERA records

Shapoorji Pallonji (Joyville) has 8 projects in our MahaRERA register for Pune. 0 of 8 with both dates moved the completion date 3 months or more later.

All 8 projects by Shapoorji Pallonji (Joyville) in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

More by Joyville Shapoorji Housing Private Limited

FAQ

What is the price of Shapoorji Pallonji Vyomora?

Homes from ₹84.99 L to ₹2.75 Cr, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Shapoorji Pallonji Vyomora?

The 3 MahaRERA registrations of Shapoorji Pallonji Vyomora have filed completion dates from 30 Aug 2031 to 31 Dec 2031. For PR1260002600999: The completion date filed with MahaRERA is 30 Aug 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Shapoorji Pallonji Vyomora?

Shapoorji Pallonji Vyomora is registered with MahaRERA in 3 parts (towers or phases): PR1260002600999, PM1261012602248, PM1261012602233.

How many towers and floors does Shapoorji Pallonji Vyomora have?

MahaRERA lists 2 buildings in registration PR1260002600999, one of the project's 3, the tallest with 24 floors.

How many flats are there in Shapoorji Pallonji Vyomora?

MahaRERA lists 720 units across all 3 of its MahaRERA registrations; PR1260002600999 has 330.

How many homes in Shapoorji Pallonji Vyomora are booked?

0 of 720 homes were booked as per MahaRERA on 19 Nov 2026, across all 3 of its MahaRERA registrations.

Who is the builder of Shapoorji Pallonji Vyomora?

The promoter registered with MahaRERA is Joyville Shapoorji Housing Private Limited. Our register has 8 Pune projects by Shapoorji Pallonji (Joyville); 0 of 8 with both dates moved their completion date 3 months or more later.

Where is Shapoorji Pallonji Vyomora?

Shapoorji Pallonji Vyomora is in Mulshi, Pune district (pincode 411057).

How far is Shapoorji Pallonji Vyomora from Pune Airport?

About 19.8 km in a straight line from the map position; the drive is longer.

How far is Shapoorji Pallonji Vyomora from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 2.7 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Shapoorji Pallonji Vyomora.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 1 Oct 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (5 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (5 Nov 2026)

Get the price sheet and floor plans for VYOMORA PHASE 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment