Shapoorji Pallonji Vyomora from space, 2024 to 2026
Registered with MahaRERA in Jul 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.
9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Oct–Dec 2026Open land shows seasonal plant growth following the monsoon season.
- Apr–May 2026Dry ground with no structural changes inside the ring.
- Jan–Mar 2026Undeveloped land persists around the map pin ahead of registered project timelines.
- Oct–Dec 2025Seasonal vegetation appears across the plot.
- Apr–May 2025Dry terrain with minimal visible activity inside the ring.
- Jan–Mar 2025Open ground remains largely untouched with surrounding urban features.
- Oct–Dec 2024Patchy vegetation growth observed within the ring boundary.
- Apr–May 2024Dry earth visible with no major alterations in the area.
- Jan–Mar 2024Sparse plant cover persists on the open land.
Shapoorji Pallonji Vyomora: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.