Skip to main contentSkip to navigation

Shapoorji Pallonji Vyomora from space, 2024 to 2026

Registered with MahaRERA in Jul 2026. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

Today, from Google satellite, centred on the same map pin.

9 seasons, Jan 2024 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Open land shows seasonal plant growth following the monsoon season.
  2. Apr–May 2026Dry ground with no structural changes inside the ring.
  3. Jan–Mar 2026Undeveloped land persists around the map pin ahead of registered project timelines.
  4. Oct–Dec 2025Seasonal vegetation appears across the plot.
  5. Apr–May 2025Dry terrain with minimal visible activity inside the ring.
  6. Jan–Mar 2025Open ground remains largely untouched with surrounding urban features.
  7. Oct–Dec 2024Patchy vegetation growth observed within the ring boundary.
  8. Apr–May 2024Dry earth visible with no major alterations in the area.
  9. Jan–Mar 2024Sparse plant cover persists on the open land.

Shapoorji Pallonji Vyomora: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.