West World, Tathawade
Sold as Punawale by 7 property sites; we list it under Tathawade (pincode 411033).
See the site from above todayby Landmark Realty · Tathawade, Mulshi, Pune district · 411033
- Price
- from ₹78.27 L
- EMI about ₹54,340 a month
- Possession
- Apr 2029
- completion filed with MahaRERA
- Booked
- 187 of 346
What stands out
As of 19 Nov 2026, from MahaRERA and the sources below.
- With 346 units, this registration has more homes than 161 of 222 comparable projects in the area.
- 187 of 346 homes are booked, a 54% rate that sits above the median 32% of 103 nearby projects.
Updated 21 Nov 2026
Price
Homes
₹78.27 L – ₹1.16 Cr
Last checked 8 Nov 2026
All-in cost of a home at ₹78.27 L: about ₹87.96 L
Price (agreement value) ₹78.27 L GST (5%) ₹3.91 L Stamp duty (7%) ₹5.48 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹87.96 L
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹54,340 a monthOn a ₹62.62 L loan (80% of ₹78.27 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Tathawade usually ask
- 2 BHK about ₹70 – 90 L (39 projects)
- 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
- 3 BHK about ₹90 L – ₹1.3 Cr (38 projects)
- 4 BHK about ₹1.3 – 2 Cr (7 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.
Tathawade average ₹10,852/sq ft across 19 projectsThe middle asking price per sq ft of other projects in Tathawade.
Ask about this project
Outside our main East Pune areas: the Avasetu team finds out what it can.
West World from above, today
West World, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Little change, final view shows stable site conditions.
Registered with MahaRERA Jan 2025 · possession filed for Apr 2029
Satellite images show the site evolving from open ground with sparse vegetation to active ground disturbance following the January 2025 registration, with surrounding urban development remaining stable throughout the timeline.
The seasons before
- Apr–May 2026Little change, dry ground.
- Jan–Mar 2026Low vegetation, ground activity visible near pin.
- Oct–Dec 2025Little change, surrounding structures remain constant.
Construction proof from space: Jan 2024 to Oct 2026, Copernicus Sentinel-2 (5 earlier seasons)
- Apr–May 2025Little change, dry conditions persist.
- Jan–Mar 2025Work shows after the Jan 2025 registration, ground disturbance visible.
- Oct–Dec 2024Little change inside the ring area.
- Apr–May 2024Little change, dry ground conditions.
- Jan–Mar 2024Plant cover decreases, blue sheets remain.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2024-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)4.5 km
- Baner-Balewadi High Street8 km
- Pune Railway Station18.5 km
- Pune Airport (Lohegaon)19 km
Nearby
- SchoolS.B. Patil Public School (SBPPS) Ravet, Pune2.5 km
- CollegeD.Y. Patil College of Engineering2.6 km
- ShoppingD Mart Ravet2.6 km
- SchoolAkshara International School & Junior College2.7 km
- CollegeIndira College of Commerce & Science (ICCS)2.7 km
Straight-line distances; the drive is longer. Places: Google Maps.
Amenities
- grand clubhouse.
Last checked 8 Nov 2026.
MahaRERA record
From MahaRERA, read 19 Nov 2026Possession date
30 Apr 2029
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.
Beside other Tathawade projects
Worked out by Avasetu- Homes booked
- 54%
- The middle of 101 Tathawade projects registered within a year of it: 32%.
- Completion date
- Not moved by the builder
- 53 of 233 Tathawade projects being built moved theirs 3 months or more.
From MahaRERA records read 19 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 187 of 346
- Towers
- 4 in this registration
- The tallest has 25 floors. 8 in the whole project.
- Registered on
- 15 Jan 2025
- MahaRERA registration
- P52100078839
- Listed or updated on MahaRERA 1 Oct 2026.
- Promoter (builder)
- Landmark Realty
- Project type
- Residential / Group Housing
- Pincode
- 411033
Tower by tower
4 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| Tower - 3 | 25 | 89 | 0 |
| Tower - 4 | 24 | 84 | 0 |
| Tower - 5 | 24 | 84 | 0 |
| Tower - 6 | 17 | 89 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Land
- 7 acres
Last checked 8 Nov 2026. MahaRERA counts where they differ.
Landmark Realty: track record
From MahaRERA recordsLandmark Realty has 2 projects in our MahaRERA register for Pune.
- Silvianacompletion filed 30 Jun 2022
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Tathawade
- 12th Avenuepossession Apr 2029
- 18 Magnitudefrom ₹67.95 L · possession Apr 2029Starts ₹10 L lower than West World
- 24Life Altaapossession Feb 2029
- 33 Central Avenue2, 3 BHK · from ₹87.3 L · possession Apr 2029Starts ₹9 L higher than West World
- AA Privilege2, 3 BHK · from ₹69 L · possession Apr 2029Starts ₹9 L lower than West World
- Akshay Residencypossession Dec 2029
More by Landmark Realty
FAQ
What is the price of West World?
Homes from ₹78.27 L to ₹1.16 Cr, checked on 8 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of West World?
The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of West World?
West World is registered with MahaRERA as P52100078839.
How many towers and floors does West World have?
MahaRERA lists 4 buildings, the tallest with 25 floors.
How many flats are there in West World?
MahaRERA lists 346 units.
How many homes in West World are booked?
187 of 346 homes were booked as per MahaRERA on 19 Nov 2026.
Who is the builder of West World?
The promoter registered with MahaRERA is Landmark Realty. Our register has 2 Pune projects by Landmark Realty.
Where is West World?
West World is in Mulshi, Pune district (pincode 411033).
Which school is nearest to West World?
S.B. Patil Public School (SBPPS) Ravet, Pune, about 2.5 km away in a straight line from the map position; the drive is longer.
How far is West World from Pune Airport?
About 19 km in a straight line from the map position; the drive is longer.
How far is West World from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?
About 4.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to West World.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 1 Oct 2026
- Dates and homes bookedFrom MahaRERA
Checked 8 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Nov 2026
- Location and nearbyGathered and checked
Checked 8 Nov 2026
- DescriptionGathered and checked
Checked 8 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (8 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (8 Nov 2026)
Get the price sheet and floor plans for West World
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.