Skip to main contentSkip to navigation

Yashada Dreamsong from space, 2023 to 2026

The site remained largely barren land and tracks through 2024. Following the November 2024 MahaRERA registration, ground clearing, new building footprints, and construction shadows emerged by early 2025 and continued developing through 2026.

Today, from Google satellite, centred on the same map pin.

12 seasons, Jan 2023 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.

Season by season

  1. Oct–Dec 2026Little change, structures and shadows persist around the ring.
  2. Apr–May 2026Little change, construction footprints remain visible.
  3. Oct–Dec 2025New structural foundations and dark shadows from emerging construction appear.
  4. Apr–May 2025Little change, active ground preparation and cleared soil visible.
  5. Jan–Mar 2025New building footprints and earthworks appear inside the ring.
  6. Oct–Dec 2024Work shows after the Nov 2024 registration with ground clearing.
  7. Apr–May 2024Little change, dry earth and tracks visible.
  8. Jan–Mar 2024Little change, minimal plant cover and bare soil.
  9. Oct–Dec 2023Little change, ground remains largely undeveloped.
  10. Apr–May 2023Little change, dry soil conditions continue.
  11. Jan–Mar 2023Little change, barren ground persists inside the ring.

Yashada Dreamsong: prices, MahaRERA facts and floor plansMore Pune projects from space

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.