Skip to main contentSkip to navigation
YASHADA VIVANTA REALTY PVT. LTD. logo
The builder's logo, from yashadarealty.com
MahaRERA registered P52100078168Verify on MahaRERA (opens in a new tab)Early stage

Yashada Dreamsong, Ravet

See the site from above today

by Yashada Vivanta Realty Pvt. Ltd. · Ravet, Haveli, Pune district · 412101

Homes
2, 3 BHK
Price
from ₹69.22 L
EMI about ₹48,057 a month
Possession
Apr 2030
completion filed with MahaRERA
Booked
58 of 314

What stands out

As of 11 Nov 2026, from MahaRERA and the sources below.

  • 18% of homes booked: MahaRERA shows 58 of 314 homes booked.
  • Buildings in this registration: 3, up to 19 floors.
  • 18% booked here; the middle of 70 Ravet projects registered within a year of it is 32%.
  • Compared with other projects still being built in Ravet: Compared with other projects still being built in Ravet: its tallest building is higher than that of 55 of 100.
  • Completion date filed with MahaRERA: 30 Apr 2030.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹69.22 L – ₹78.36 L

    from 855 sq ft · ₹8,096/sq ft

    As listed on the builder's site, 20 Nov 2026

    All-in cost of the 2 BHK at ₹69.22 L: about ₹77.83 L
    Price (agreement value)₹69.22 L
    GST (5%)₹3.46 L
    Stamp duty (7%)₹4.85 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹77.83 L
  • 3 BHK

    ₹89.35 L – ₹98.84 L

    from 1,101 sq ft · ₹8,115/sq ft

    As listed on the builder's site, 20 Nov 2026

    All-in cost of the 3 BHK at ₹89.35 L: about ₹1 Cr
    Price (agreement value)₹89.35 L
    GST (5%)₹4.47 L
    Stamp duty (7%)₹6.25 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹48,057 a monthOn a ₹55.38 L loan (80% of ₹69.22 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (46 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
  • 4 BHK about ₹1.6 – 2 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,816/sq ft across 29 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Yashada Dreamsong from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Yashada Dreamsong, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Yashada Dreamsong from above, satellite picture of Nov 2022
    Nov 2022
  2. Yashada Dreamsong from above, satellite picture of Jan 2024
    Jan 2024
  3. Yashada Dreamsong from above, satellite picture of Feb 2025
    Feb 2025
  4. Yashada Dreamsong from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change, structures and shadows persist around the ring.

Registered with MahaRERA Nov 2024 · possession filed for Apr 2030

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

The site remained largely barren land and tracks through 2024. Following the November 2024 MahaRERA registration, ground clearing, new building footprints, and construction shadows emerged by early 2025 and continued developing through 2026.

The seasons before

  1. Apr–May 2026Little change, construction footprints remain visible.
  2. Oct–Dec 2025New structural foundations and dark shadows from emerging construction appear.
  3. Apr–May 2025Little change, active ground preparation and cleared soil visible.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (7 earlier seasons)
  1. Jan–Mar 2025New building footprints and earthworks appear inside the ring.
  2. Oct–Dec 2024Work shows after the Nov 2024 registration with ground clearing.
  3. Apr–May 2024Little change, dry earth and tracks visible.
  4. Jan–Mar 2024Little change, minimal plant cover and bare soil.
  5. Oct–Dec 2023Little change, ground remains largely undeveloped.
  6. Apr–May 2023Little change, dry soil conditions continue.
  7. Jan–Mar 2023Little change, barren ground persists inside the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)9 km
  • Baner-Balewadi High Street12.7 km
  • Pune Airport (Lohegaon)22.5 km
  • Pune Railway Station22.8 km

Nearby

  • Railway stationDehu Road2.1 km
  • TempleGhoradeshwar caves (Shelarwadi Caves )2.8 km
  • TemplePratishirdi Shirgaon3.2 km
  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune3.5 km
  • Railway stationBegdewadi3.5 km

Straight-line distances; the drive is longer. Places: Google Maps.

Project facts

  • The project consists of three high-rise towers with 14 and 17 floors. (the builder's site)

Amenities

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 11 Nov 2026

Possession date

30 Apr 2030

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2029.

Beside other Ravet projects

Worked out by Avasetu
Homes booked
18%
The middle of 70 Ravet projects registered within a year of it: 32%.
Completion date
Not moved by the builder
56 of 205 Ravet projects being built moved theirs 3 months or more.

From MahaRERA records read 11 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
58 of 314
Towers
3 in this registration
The tallest has 19 floors.
Registered on
25 Nov 2024
MahaRERA registration
P52100078168
Listed or updated on MahaRERA 23 Mar 2026.
Promoter (builder)
Yashada Vivanta Realty Pvt. Ltd.
Project type
Residential / Group Housing
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
C BUILDING19660
B BUILDING161660
A BUILDING16820

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 17 floors
From the builder's site

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Yashada Vivanta Realty Pvt. Ltd.: track record

From MahaRERA records

Yashada Vivanta Realty Pvt. Ltd. has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

FAQ

What is the price of Yashada Dreamsong?

2 BHK: ₹69.22 L to ₹78.36 L; 3 BHK: ₹89.35 L to ₹98.84 L, as listed on the builder's site on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Yashada Dreamsong?

The completion date filed with MahaRERA is 30 Apr 2030; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Yashada Dreamsong?

Yashada Dreamsong is registered with MahaRERA as P52100078168.

How many towers and floors does Yashada Dreamsong have?

MahaRERA lists 3 buildings, the tallest with 19 floors.

How many flats are there in Yashada Dreamsong?

MahaRERA lists 314 units.

How many homes in Yashada Dreamsong are booked?

58 of 314 homes were booked as per MahaRERA on 11 Nov 2026.

Who is the builder of Yashada Dreamsong?

The promoter registered with MahaRERA is Yashada Vivanta Realty Pvt. Ltd..

Where is Yashada Dreamsong?

Yashada Dreamsong is in 412101, Haveli, Pune district (pincode 412101).

Which school is nearest to Yashada Dreamsong?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 3.5 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Yashada Dreamsong?

Dehu Road, about 2.1 km away in a straight line from the map position; the drive is longer.

How far is Yashada Dreamsong from Pune Airport?

About 22.5 km in a straight line from the map position; the drive is longer.

How far is Yashada Dreamsong from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 9 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Yashada Dreamsong.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 23 Mar 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 8 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for YASHADA DREAMSONG

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment