MahaRERA registered P52100050915Verify on MahaRERA (opens in a new tab)Near completion

Yashada Windsong, Ravet

See the site from above today

by Vivanta Realty · Ravet, Haveli, Pune district · 412101

Homes
2, 3 BHK
Price
from ₹85.44 L
EMI about ₹59,317 a month
Possession
Dec 2026
completion filed with MahaRERA
Booked
404 of 407

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 99% of homes booked: Buyers have already booked 404 of the 407 homes in this phase. Similar projects are at about 61% booked.
  • With 407 units in this registration, the development has more homes than 187 of 199 active projects in the neighborhood.
  • Across 9 projects in Pune with both dates on MahaRERA, the builder has not delayed completion dates by 3 months or more.
  • The developer filed a formal completion date of 31 Dec 2026 with MahaRERA.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹85.44 L – ₹1.05 Cr

    from 932 sq ft · ₹9,167/sq ft

    Last checked 5 Nov 2026

    All-in cost of the 2 BHK at ₹85.44 L: about ₹95.99 L
    Price (agreement value)₹85.44 L
    GST (5%)₹4.27 L
    Stamp duty (7%)₹5.98 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹95.99 L
  • 3 BHK

    ₹1.15 Cr – ₹1.56 Cr

    from 1,379 sq ft · ₹8,339/sq ft

    Last checked 5 Nov 2026

    All-in cost of the 3 BHK at ₹1.15 Cr: about ₹1.29 Cr
    Price (agreement value)₹1.15 Cr
    GST (5%)₹5.75 L
    Stamp duty (7%)₹8.05 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.29 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹59,317 a monthOn a ₹68.35 L loan (80% of ₹85.44 L) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Yashada Windsong

  • 4 BHK about ₹1.7 – 2 Cr

Our own rounded guide, checked against the area on 5 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Ravet usually ask

  • 2 BHK about ₹60 – 85 L (46 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (3 projects)
  • 3 BHK about ₹85 L – ₹1.2 Cr (50 projects)
  • 4 BHK about ₹1.5 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Ravet, rounded. Use it to judge an offer, not as a price.

Ravet average ₹9,816/sq ft across 29 projectsThe middle asking price per sq ft of other projects in Ravet.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Yashada Windsong from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Yashada Windsong, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Yashada Windsong from above, satellite picture of Nov 2022
    Nov 2022
  2. Yashada Windsong from above, satellite picture of Jan 2024
    Jan 2024
  3. Yashada Windsong from above, satellite picture of Feb 2025
    Feb 2025
  4. Yashada Windsong from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Apr–May 2026 (looked Nov 2026)

Little change in the ring.

Registered with MahaRERA May 2023 · possession filed for Dec 2026

Season by season, Jan 2022 to Oct 2026: 15 seasons, October to May (the monsoon is under cloud).

Yashada Windsong shows vacant land initially, followed by ground clearing and construction activity appearing after its May 2023 registration, with multiple tall buildings eventually casting distinct shadows within the ring.

The seasons before

  1. Jan–Mar 2026Building shadows remain clearly visible.
  2. Oct–Dec 2025Structures remain prominent with visible shadows.
  3. Apr–May 2025Little change in the ring.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2 (10 earlier seasons)
  1. Jan–Mar 2025Tall building shadows fall across the ring.
  2. Oct–Dec 2024Shadows lengthen, showing vertical growth.
  3. Apr–May 2024Little change in structure heights.
  4. Jan–Mar 2024Building footprints and shadows grow clearer.
  5. Oct–Dec 2023New structures and shadows indicate construction activity.
  6. Apr–May 2023Ground is cleared as work shows after the May 2023 registration.
  7. Jan–Mar 2023Very low plant cover visible.
  8. Oct–Dec 2022Little change in the ring.
  9. Apr–May 2022Ground remains mostly bare.
  10. Jan–Mar 2022Sparse vegetation persists within the ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)7.1 km
  • Baner-Balewadi High Street10 km
  • Pune Airport (Lohegaon)19.2 km
  • Pune Railway Station19.6 km

Nearby

  • SchoolS.B. Patil Public School (SBPPS) Ravet, Pune0.2 km
  • TempleISKCON (Shree Govinda Dham) Ravet1.1 km
  • ShoppingD Mart Ravet1.6 km
  • CollegePimpri Chinchwad College Of Engineering (PCCOE)1.8 km
  • CollegeD.Y. Patil College of Engineering1.8 km

Straight-line distances; the drive is longer. Places: Google Maps.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

31 Dec 2026

Completion date filed with MahaRERA. Not moved since registration.

Beside other Ravet projects

Worked out by Avasetu
Homes booked
99%
The middle of 58 Ravet projects registered within a year of it: 61%.
Completion date
Not moved by the builder
56 of 205 Ravet projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
404 of 407
Towers
3 in this registration
The tallest has 16 floors.
Units
407
317 homes, 90 shops or offices.
Registered on
15 May 2023
MahaRERA registration
P52100050915
Listed or updated on MahaRERA 6 Feb 2026.
Promoter (builder)
Vivanta Realty
Project type
Others
Pincode
412101

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • 90 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
BUILDING-B1615638
BUILDING-C1611338
BUILDING-A164814

As filed with MahaRERA (sanctioned floors).

Vivanta Realty: track record

From MahaRERA records

Vivanta Realty has 9 projects in our MahaRERA register for Pune. 0 of 9 with both dates moved the completion date 3 months or more later.

All 9 projects by Vivanta Realty in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Ravet

More by Vivanta Realty

FAQ

What is the price of Yashada Windsong?

2 BHK: ₹85.44 L to ₹1.05 Cr; 3 BHK: ₹1.15 Cr to ₹1.56 Cr, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Yashada Windsong?

The completion date filed with MahaRERA is 31 Dec 2026.

What is the MahaRERA number of Yashada Windsong?

Yashada Windsong is registered with MahaRERA as P52100050915.

How many towers and floors does Yashada Windsong have?

MahaRERA lists 3 buildings, the tallest with 16 floors.

How many flats are there in Yashada Windsong?

MahaRERA lists 407 units (317 residential, 90 other).

How many homes in Yashada Windsong are booked?

404 of 407 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Yashada Windsong?

The promoter registered with MahaRERA is Vivanta Realty. Our register has 9 Pune projects by Vivanta Realty; 0 of 9 with both dates moved their completion date 3 months or more later.

Where is Yashada Windsong?

Yashada Windsong is in Haveli, Pune district (pincode 412101).

Which school is nearest to Yashada Windsong?

S.B. Patil Public School (SBPPS) Ravet, Pune, about 0.2 km away in a straight line from the map position; the drive is longer.

How far is Yashada Windsong from Pune Airport?

About 19.2 km in a straight line from the map position; the drive is longer.

How far is Yashada Windsong from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 7.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Yashada Windsong.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 6 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (5 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (5 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (5 Nov 2026)

Get the price sheet and floor plans for YASHADA WINDSONG

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment