Yashada Windsong from space, 2022 to 2026
Yashada Windsong shows vacant land initially, followed by ground clearing and construction activity appearing after its May 2023 registration, with multiple tall buildings eventually casting distinct shadows within the ring.
15 seasons, Jan 2022 to Oct 2026: every clear pass of the Sentinel-2 satellite over the project's map pin, October to May (the monsoon is under cloud). A new picture is added every season.
Season by season
- Apr–May 2026Little change in the ring.
- Jan–Mar 2026Building shadows remain clearly visible.
- Oct–Dec 2025Structures remain prominent with visible shadows.
- Apr–May 2025Little change in the ring.
- Jan–Mar 2025Tall building shadows fall across the ring.
- Oct–Dec 2024Shadows lengthen, showing vertical growth.
- Apr–May 2024Little change in structure heights.
- Jan–Mar 2024Building footprints and shadows grow clearer.
- Oct–Dec 2023New structures and shadows indicate construction activity.
- Apr–May 2023Ground is cleared as work shows after the May 2023 registration.
- Jan–Mar 2023Very low plant cover visible.
- Oct–Dec 2022Little change in the ring.
- Apr–May 2022Ground remains mostly bare.
- Jan–Mar 2022Sparse vegetation persists within the ring.
Yashada Windsong: prices, MahaRERA facts and floor plansMore Pune projects from space
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.