Flats and residential projects in Katraj, Pune
Updated 23 Nov 2026
- Projects being built
- 152
- Homes booked
- 40%
- 1 BHK from
- ₹43.52 L
- Past their completion date
- 28
As of 24 Nov 2026, MahaRERA lists 152 housing projects in Katraj, Pune being built or recently finished (4 sold out). 5,039 of their 12,536 homes are booked. The earliest filed completion date is Astonia Royale Phase IV M and N Buildings (Sep 2025). 1 BHK flats start from ₹43.52 L (Basil Shivraj).
Every residential project MahaRERA lists in Katraj, the flats and apartments on sale here and the ones already handed over: 152 being built or recently finished, and 171 older ones. Before you buy a property in Katraj, each page shows the completion date the builder filed with MahaRERA, whether it has moved, and how many homes are booked, with the date we read the record.
Top projects you can still buy
Most homes booked first, with 10 or more open
- Rank 2Under constructionThe project's position on the mapChaandrai Galaxy
123 of 139 homes open · 12% booked · possession Aug 2029
- Rank 3Under constructionLaxmi Greens 1 BHK ₹46.7 L to ₹51.06 L
86 of 157 homes open · possession Oct 2030
- See all 60 →
Just launched
Registered with MahaRERA in the last 12 months
Flat prices in Katraj
Starting prices of new flats in Katraj by size, from the builder's own site or two property sites that agree, read in the last 45 days. Parking, stamp duty, registration and GST are usually extra.
| Size | Starting price | Lowest at | Projects |
|---|---|---|---|
| 1 BHK | ₹43.52 L to ₹49 L | Basil Shivraj | 3 with 1 BHK flats |
What new homes in Katraj usually ask
- 1 BHK about ₹35 – 50 L (4 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Katraj, rounded. Use it to judge an offer, not as a price.
Katraj: the good and what to check
What's going for it
- Room to choose: 7,497 of 12,536 homes in projects being built are still open.
- 41 projects have possession filed within the next 12 months.
Check before you book
- 45 of 152 projects have moved their possession date by 3 months or more, usually by 19 months (not counting MahaRERA's 2026 extension for all projects). See the date history on a project's page before you book.
- 28 projects are past the completion date filed with MahaRERA: ask for the occupancy certificate (OC) before you pay.
- Starting prices are for the smallest home of each size and usually leave out parking, stamp duty, registration and GST: ask for the full cost sheet.
Counted from MahaRERA records of the projects on this page.
Most active projects in Katraj
- Chaandrai Galaxy 16 homes booked (12% of its 139 homes) between 2026-10-20 and 2026-11-19 (MahaRERA)
- Laxmi Greens 15 homes booked (10% of its 157 homes) between 2026-10-20 and 2026-11-19 (MahaRERA)
- Uptown Plaza 4 homes booked (3% of its 156 homes) between 2026-10-21 and 2026-11-20 (MahaRERA)
- Creata Splendora completion filed for 31 Jul 2029 (MahaRERA)
- Habitat Spring completion filed for 1 May 2028 (MahaRERA)
- Elmont Towers completion filed for 31 Dec 2031 (MahaRERA)
- Shree Ganesh Heritage completion filed for 30 Apr 2031 (MahaRERA)
- GV7 Insignia Building B and C 6 homes booked (5% of its 118 homes) between 2026-10-13 and 2026-11-12 (MahaRERA)
Being built (148)
New launch (17)
- Amit Elite Checked 3/4by Harmony Developers · possession Jul 2029 · 0/17 booked
- Balaji Ambarleve Checked 3/4by Techbalaji Infracapital Private Limited · possession Dec 2030 · 0/106 booked
- Balwant Empire Checkedby Kcnest Housing Corporation LLP · possession Dec 2029 · 0/46 booked
- Basil Krushnai Checkedby Basil Built Landmark Private Limited · possession Apr 2030 · 0/39 booked
- BKC Pearl Checked 3/4possession Dec 2028 · 0/40 booked
- Elmont Towers Checked 3/4by Shree Bhairavnath Developers · possession Dec 2031 · 0/72 booked
- Ganga Lake View Checked 2/4by Shreenath Developers · possession Jul 2028 · 0/15 booked
- Indu Aspire Enclave MahaRERA onlyby Indu Aspire Properties · possession Apr 2031 · 0/42 booked
- Kalpashree Anagha Checked 3/4by Kalpashree Associates · possession Mar 2030 · 0/21 booked
- Lake Ridge City Checkedby Bhaishree Landmarks LLP · possession Dec 2029 · 0/300 booked · from ₹64 L
- Prerna Checked 3/4by M/s Kalpavruksha Group · possession Mar 2028 · 0/17 booked
- Sai Aspire Square MahaRERA onlyby Shree Aspire Ventures · possession Apr 2031 · 0/31 booked
- Shiv Parvati Apartment MahaRERA onlyby Shiv Parvati Developers · possession Apr 2031 · 0/16 booked
- Shivam Residency Checked 3/4by Shivam Developers · possession Oct 2029 · 0/21 booked
- Uptown Plaza Checkedby Greenestpr Buildcon LLP · possession Aug 2030 · 4/156 booked · from ₹38.41 L
- Vrundavan MahaRERA onlyby Trinity Developers · possession Dec 2029 · 0/39 booked
- Yashraj Sanskruti Checked 3/4by G.k Infra · possession Dec 2029 · 0/18 booked
Early stage (21)
- Amit Eternity MahaRERA onlyby Amit Constructions & Saidhan Udyog Samuh · possession Apr 2030 · 0/34 booked
- Atrinandan Heights Checked 3/4by Krushna Developers · possession Apr 2032 · 6/41 booked
- Chaandrai Galaxy Checked 3/4by Sachin Developers · possession Aug 2029 · 16/139 booked
- Creata Splendora Checkedby Acme Creata Associates · possession Jul 2029 · 8/56 booked
- Dnyandeep Heights MahaRERA onlyby Mahalaxmi Venture · possession Apr 2029 · 1/60 booked
- Grand View Vismay Building A, B, C, D, E Checked 3/4by Gold Natrajan Developers LLP · possession Apr 2030 · 0/142 booked
- GV7 Insignia Building B and C Checked 3/4by M/S Chirag Developers · possession Apr 2030 · 61/118 booked
- Infinity Studio Checked 3/4possession Apr 2028 · 0/121 booked
- Karthikeya Residency MahaRERA onlyby Laxman Kala Constructions · possession Sep 2029 · 14/42 booked
- Kohinoor A/C MahaRERA onlyby Sneha Constructions · possession Jun 2029 · 0/20 booked
- Kohinoor B Checked 3/4by Sneha Constructions · possession Jun 2029 · 96/120 booked · from ₹49 L
- Meghsparsh D Wing MahaRERA onlypossession Apr 2030 · 15/58 booked
- Shiv Harsh Vihar MahaRERA onlyby M/S Shiv Raj Developers · possession Apr 2032 · 0/36 booked
- Shree Ganesh Heritage Checked 3/4by Bramhachaitanya Properties · possession Apr 2031 · 0/25 booked · from ₹55.33 L
- Siddhi Aspire Checked 3/4by Siddhivinayak Group · possession Oct 2029 · 56/149 booked
- Skyrise MahaRERA onlyby Prathamakruti Construction LLP · possession Apr 2030 · 2/48 booked
- Sun Apex Checkedby Jindal Mittal Graha Nirman Pvt. Ltd. · possession Dec 2030 · 0/140 booked
- The Vantage MahaRERA onlyby Giriraj Promoters Private Limited · possession Dec 2028 · 0/27 booked
- TSB Gloria MahaRERA onlyby R D Developers · possession Aug 2029 · 0/24 booked
- Varad Dwarka MahaRERA onlyby Varad Realty · possession Apr 2029 · 1/20 booked
- Vrindavan MahaRERA onlyby M/S Jain Bafna Associates · possession Oct 2032 · 26/60 booked
Mid stage (34)
- 4-Flamingos Checked 3/4by Kondhare Wable Associates · possession Apr 2029 · 37/123 booked
- Aura Bliss MahaRERA onlyby Sunflower Associates · possession Dec 2027 · 0/66 booked
- Basil Shivraj Checkedby Shree Sadguru Developers · possession Apr 2028 · 91/138 booked · from ₹43.52 L
- Blossom Garden MahaRERA onlyby M S Associates · possession May 2031 · 2/35 booked
- Chaandrai Vrundavan MahaRERA onlyby Chaandrai SR Construction · possession Dec 2027 · 7/69 booked
- D Hermes Avenue MahaRERA onlyby Khushi Neel Developers · possession Apr 2028 · 0/9 booked
- Dhiraj Riseonic Checkedby M/s Dhiraj Construction · possession Jul 2029 · 101/148 booked
- Emerald Skies Checkedby Rajyog Group · possession May 2028 · 66/102 booked
- Golden Lake Katraj MahaRERA onlyby Narsinh Associates · possession Apr 2028 · 4/83 booked
- Habitat Spring Checked 3/4by Habitat Builders and Developers · possession May 2028
- Ivory Vista MahaRERA onlyby Phate Kamthe Associates · possession Oct 2027 · 31/90 booked
- Krishna Residency MahaRERA onlyby M/S Kiran Constructions · possession Oct 2027 · 18/45 booked
- Laxmi Greens Checked 3/4by Darsheel Buildcon · possession Oct 2030 · 71/157 booked · from ₹46.7 L
- Optima Aspire Checkedpossession Apr 2028 · 31/235 booked
- Optima Aspire Plus Checkedby Optima Infra · possession Apr 2029 · 5/146 booked
- Padmashree Phase - I MahaRERA onlypossession Apr 2028 · 15/44 booked
- Platinum Pride MahaRERA onlyby Shree Mauli Developers · possession Mar 2028 · 11/54 booked
- Prabhas MahaRERA onlyby Nidisha Buildcon LLP · possession Aug 2027 · 7/42 booked
- Punyashri MahaRERA onlypossession Dec 2027 · 20/72 booked
- Sai Samruddhi Residency MahaRERA onlyby Rathod Promoters And Developers · possession Apr 2028 · 0/57 booked
- Siddhi Avenue MahaRERA onlyby Siddhivinayak Developers · possession Apr 2028 · 7/28 booked
- Sumedhraj Hill View MahaRERA onlyby Shrikrishna Developers · possession Nov 2027 · 14/23 booked
- Sun View B1 Wing MahaRERA onlyby Aoudumber Developers · possession Apr 2029 · 64/90 booked
- Talav Sangam MahaRERA onlyby Rays Infra · possession Apr 2028 · 6/56 booked
- TCG Gardenia F G BLDG MahaRERA onlyby The Construction & Development Co · possession Dec 2027 · 48/82 booked
- The Leaf Phase V MahaRERA onlyby Shree Pushkar Developers · possession Dec 2028 · 3/33 booked
- Unique Residency MahaRERA onlypossession Apr 2028 · 19/34 booked
- Vaishnavi Arcade Phase 2 MahaRERA onlyby Trimurti Developers · possession Apr 2029 · 4/43 booked
- Vastu Shilp MahaRERA onlyby Vastu Construction · possession Jul 2028 · 5/41 booked
- Venkatesh Anandmayi MahaRERA onlyby Shree Venkatesh Enterprises · possession Jan 2028 · 27/92 booked
- Vivanta Residency MahaRERA onlyby Utkarsh Landmarks · possession Nov 2027 · 0/21 booked
- Vrundavan Kunal MahaRERA onlyby Narayan Construction · possession Apr 2028 · 0/16 booked
- Wisteria Checkedby Jnd Construction · possession Apr 2028 · 88/130 booked
- Wisteria Wing A MahaRERA onlyby Shri Balaji Construction · possession Apr 2028 · 52/71 booked
Near completion (42)
- 100 Katraj MahaRERA onlyby Prathamesh Associates · possession Apr 2027 · 29/45 booked
- Airavat B Wing Checkedby Ashtavinayak Developers · possession Mar 2027 · 3/102 booked
- Aishwarya Heights MahaRERA onlyby Shree Sadguru Construction · possession Nov 2026
- AMIT BLOOMFIELD PHASE III - J AND K BUILDING Checkedby Amit Enterprises Housing Limited · possession Jan 2027 · 176/252 booked
- Amrai Lake MahaRERA onlyby Omkar Constructions · possession Apr 2027
- Ankur Residency MahaRERA onlyby Ankur Developers · possession Feb 2027 · 8/20 booked
- Balaji Residency MahaRERA onlyby Shree Balaji Properties · possession Apr 2027
- Balaji Siddhi Checked 3/4by Shri Balaji Siddhi Developers · possession Feb 2028 · 65/152 booked
- Basil Aarambha MahaRERA onlyby Aarambha Buildspace LLP · possession Apr 2027 · 4/30 booked
- Basil Shreeji Commercial MahaRERA onlyby Gsv Constructions · possession Nov 2026 · 18/32 booked
- Bella Casa - Phase 1 Checked 3/4by Kakkad Infra LLP · possession Apr 2027 · 306/346 booked
- Capella MahaRERA onlyby D K Realties · possession Dec 2026
- Chandrangan Rajgad MahaRERA onlyby Chandrangan Buildcon · possession Apr 2027 · 48/53 booked
- Chandrangan Revanta C Wing MahaRERA onlyby Chandrangan Buildcon · possession Apr 2027 · 21/42 booked
- Chintamani Heights MahaRERA onlyby Avadhoot Developers · possession Apr 2027 · 0/16 booked
- Chintamani Residency MahaRERA onlyby G P K Developers · possession Apr 2027 · 4/36 booked
- Divya Elite MahaRERA onlyby Rrs Infracon LLP · possession Dec 2026 · 8/12 booked
- Green Hill Phase 2 MahaRERA onlyby D.S. Dhone Builders · possession Dec 2026 · 24/63 booked
- Gulmohar MahaRERA onlypossession Apr 2027
- Krupa Checked 3/4by Pam Realty Pvt Ltd · possession Apr 2027 · 92/110 booked
- Lake N Hills MahaRERA onlyby Unicus Developers · possession Apr 2027
- Lake Tierra MahaRERA onlyby Anand Constructions · possession Apr 2027
- Matoshri Enclave MahaRERA onlypossession Apr 2027 · 4/28 booked
- Mbm Orbit Checkedby Sai Sankalp Developers · possession Jan 2027 · 15/23 booked
- Nakshatra Apartment MahaRERA onlypossession May 2027 · 18/22 booked
- Padmarang MahaRERA onlypossession Mar 2027 · 26/56 booked
- Parijaat MahaRERA onlyby GKC Buildcon LLP · possession Jul 2027 · 36/56 booked
- Rajyog C Wing MahaRERA onlypossession Dec 2026 · 22/46 booked
- S P Pride MahaRERA onlyby S P Builders · possession Sep 2027 · 11/42 booked
- Sadguru Heritage MahaRERA onlyby Sb Realty · possession Dec 2027 · 37/84 booked
- Sai Empire MahaRERA onlyby Shree Sai construction · possession Apr 2028
- Sai Mystique Phase III Building L MahaRERA onlyby Sai Shree Developers · possession Apr 2027 · 62/65 booked
- Saideep Dwarka MahaRERA onlyby M/s. Saideep Construction and Land Developers · possession Dec 2026 · 0/20 booked
- Shree Sadguru Kshitij MahaRERA onlyby Shri Sadguru Developers · possession Dec 2026 · 7/20 booked
- Shri Laxmi Bhagyoday Sankul MahaRERA onlypossession Apr 2027 · 8/23 booked
- Tcg Gardenia MahaRERA onlyby The Construction & Development Company · possession Dec 2026
- TCG Gardenia PH-III Building - E MahaRERA onlyby The Construction & Development Co. · possession Dec 2026 · 23/43 booked
- The Grand Checkedby Venkateshwara Construction · possession Apr 2028 · 52/132 booked
- The Pavilion MahaRERA onlyby Optima Reality · possession Jul 2027
- Torna Mohar Checkedby Manoj Mandhare & Associates · possession Apr 2029 · 80/123 booked
- TSB Capital MahaRERA onlyby T S B Developers · possession Apr 2027 · 10/36 booked
- Vastudeep Avenue MahaRERA onlyby Vastudeep Construction · possession Dec 2026
Completion date passed (28)
- Arcadia MahaRERA onlyby Acme Sawant Ventures · possession Oct 2026 · 70/119 booked
- Basil Chandrakant MahaRERA onlyby Shree Sadguru Developers · possession Jul 2026 · 120/203 booked
- Dugad Heights MahaRERA onlyby Dugad Reality · possession Dec 2025 · 15/89 booked
- Durvankur Residency C Wing MahaRERA onlyby Durvankur Developers · possession May 2026 · 24/34 booked
- Excellaa Plazzo MahaRERA onlypossession Dec 2025
- Excellaa Residency MahaRERA onlypossession Dec 2025
- Grande View7 Capital 1 MahaRERA onlyby Chirag Developers · possession Dec 2025
- Guru Mantra MahaRERA onlyby Shree Gurukrupa Developers · possession Dec 2025
- GV7 Capital 4 MahaRERA onlyby Chirag Developers · possession Dec 2025
- Imperial Gold MahaRERA onlypossession Dec 2025
- Jadhav Prrestige MahaRERA onlyby Chaandrai Vsbs Construction · possession Dec 2025 · 73/165 booked
- Kalpak Shrusti A Wing MahaRERA onlyby Kalpak Developers · possession Dec 2025
- LAKE TOWN D-6, WING - A and B MahaRERA onlyby Venkatesh Associates · possession Mar 2026 · 12/28 booked
- Matoshree Residency MahaRERA onlyby Krushnai Developers · possession Dec 2025 · 10/20 booked
- Nakshatra Residency MahaRERA onlyby Shree Sairaj Developers · possession Jun 2026
- Panchratna Hills Phase 2 MahaRERA onlyby Panchratna Construction · possession Jun 2026 · 67/104 booked
- Prathamesh Aura 1 MahaRERA onlypossession Mar 2026 · 16/22 booked
- Prathamesh Aura 2 MahaRERA onlypossession Mar 2026 · 19/26 booked
- Prathamesh Aura 4 MahaRERA onlypossession Mar 2026 · 28/29 booked
- Sadguru Heights MahaRERA onlyby Ansh Construction · possession Jan 2026 · 4/11 booked
- Sai Ganesh MahaRERA onlypossession Mar 2026 · 31/43 booked
- Sai Paradise Residency MahaRERA onlyby Sai Developers · possession Oct 2026
- Sai sparsh MahaRERA onlyby Sai Rachana Lifespaces · possession Dec 2025
- Shivay Construction MahaRERA onlyby Shivay Construction · possession Dec 2025 · 32/68 booked
- Sky Pavilion MahaRERA onlyby Kiran Developers · possession Dec 2025 · 30/58 booked
- SRP Crystal MahaRERA onlyby Shreeram Developers · possession Oct 2026
- Swapnapurti Heritage MahaRERA onlyby S.d. Developers · possession Oct 2026
- Yogamrut MahaRERA onlyby Jay Ganesh Buildcon · possession Aug 2026 · 15/25 booked
Dates not read yet (6)
- Astonia Royale Phase IV M and N Buildings MahaRERA onlyby Amit Enterprises Housing Limited · possession Sep 2025 · 223/483 booked
- Basil Vrundavan Checked 3/4by Basil Promoters LLP · possession Aug 2028 · 186/424 booked
- Grande View7 Phase MahaRERA onlyby Chirag Developers · possession Dec 2025 · 46/56 booked
- NB Crystal MahaRERA onlyby Nanasaheb Bhintade Spacess Pvt Ltd · possession Dec 2025 · 106/120 booked
- One Residency MahaRERA onlyby Raviraj Realty Developers LLP · possession Jun 2026 · 178/355 booked
- Sai Nagari Phase III Checkedby Saikedareshwar Developers LLP · possession Sep 2029 · 1143/2759 booked
Stage by dates: how much of the time between MahaRERA registration and the completion date the builder filed has gone. Not a site check: MahaRERA’s construction progress reports are behind its login.
Sold out on MahaRERA (4)
- Basil Shreeji Residential MahaRERA onlyby Gsv Constructions · possession Nov 2026 · 107/107 booked
- Gokuldham MahaRERA onlyby R K Associates · possession Dec 2028 · 40/40 booked
- Mhada-TCG Gardenia MahaRERA onlyby The Construction & Development Co · possession Dec 2027 · 47/47 booked
- Prathamesh Aura 3 MahaRERA onlypossession Mar 2026 · 20/20 booked
Finished more than a year ago (171)
- "Laxminath" Project by "Swastika Landmarks" MahaRERA onlypossession Sep 2022
- 7TH Heaven MahaRERA onlyby Swapnpurti Associates · possession Aug 2025
- a Familia MahaRERA onlyby Nidisha Buildcon LLP · possession Dec 2024 · 89/123 booked
- Aakanksha Residency MahaRERA onlyby Sharvin Builders LLP · possession Sep 2024
- Aaroh Dwelling MahaRERA onlypossession Oct 2022
- ABHANG Phase I MahaRERA onlyby Kale and Dhankawade Associates · possession Aug 2024
- Adishree MahaRERA onlyby Mahalaxmi Developers And Builders · possession Sep 2023
- Agam Darshan Phase II MahaRERA onlyby Akashdeep Constructions Private Limited · possession Mar 2024
- Akshara Garden MahaRERA onlyby Nahar Reality · possession Mar 2024
- Akshara Gatha MahaRERA onlyby Parasnath Developers · possession Jun 2024
- Akshara Hills MahaRERA onlyby K N K Builders · possession Sep 2022
- Akshay Villa MahaRERA onlyby Akshay Infrastructure Pvt Ltd · possession Jun 2022
- Alliance Aishwary MahaRERA onlyby Alliance Buildcon · possession Dec 2018
- Amber Elite MahaRERA onlyby Adhar Land Developers Pvt. Ltd. · possession Dec 2017
- Amber Plaza MahaRERA onlyby Adhar Land Developers Pvt. Ltd · possession Dec 2017
- Amit Sankul MahaRERA onlypossession Mar 2025 · 10 homes
- Anandwan MahaRERA onlyby Viraj Properties · possession Jun 2024
- Apple Tree Cottage MahaRERA onlyby Saraswati Constructions · possession Jun 2019
- Aston Plaza MahaRERA onlyby SKP Corp Private Limited · possession Mar 2019 · 53/63 booked
- Atmosphere - C Wing MahaRERA onlyby JRS Associates · possession Dec 2021
- Azalea MahaRERA onlyby Acme Sawant Ventures · possession Sep 2018
- Balaji Crystal MahaRERA onlyby New Balaji Developers · possession Sep 2025 · 109/111 booked
- Balaji Krupa MahaRERA onlyby Shubharambh Balaji Construction · possession Mar 2025
- Balaji Pride MahaRERA onlyby Royal Construction · possession Oct 2022
- Balaji Residency MahaRERA onlyby Falcon Developers · possession Dec 2019
- Balaji Vishwa MahaRERA onlyby Balaji Developers · possession Oct 2021
- Balkawade Heights MahaRERA onlyby Balkawade Associates · possession Mar 2021
- Balwant Heights MahaRERA onlyby Rajyog Associates · possession Jan 2021
- Basil Amora MahaRERA onlyby Chandrangan Associates · possession Jun 2024
- Bhakti Park MahaRERA onlypossession Aug 2024
- Blossom MahaRERA onlyby Prism Constructions · possession Jun 2023
- Ceratec Greens MahaRERA onlypossession Jun 2019
- Chaandrai Capital MahaRERA onlyby Sbs Properties · possession Jun 2022
- Chandraprakash 2 MahaRERA onlyby Arena Constructions · possession Jun 2019
- Chavan Paradise - Phase II MahaRERA onlyby B K Chavan Builders Pvt Ltd · possession Dec 2022
- Chinmay Heritage Phase 2 MahaRERA onlypossession Nov 2024
- Chinmay Vaishva MahaRERA onlypossession Oct 2022
- Chitamani Nivas MahaRERA onlypossession Dec 2021
- Data Digambar Niwas MahaRERA onlypossession Dec 2023
- Dhanmai Aavaas MahaRERA onlyby Ms Rathi Construction Through Its Proprietor Mr Rajesh Dhanraj Rathi · possession Mar 2022
- Dnyaneshwar Apartment MahaRERA onlypossession Dec 2024
- Emppire Eternity MahaRERA onlyby Emppire Properties · possession Mar 2019
- G. M. Kalash MahaRERA onlyby G M Developers · possession Dec 2024
- Ganesh Park MahaRERA onlyby Ganesh Developers & Company · possession May 2018
- Ganesh Pride MahaRERA onlyby V.n.d Construction · possession Aug 2023
- Ganesh Prime Vera MahaRERA onlyby R D Developers · possession Jul 2025 · 50/69 booked
- Gloria MahaRERA onlyby Drushti Developers · possession Dec 2020
- Govind Basil MahaRERA onlyby Shree Sadguru Developers · possession Dec 2022
- Grand Icon MahaRERA onlyby Trimurti Developers · possession May 2019
- Grande View 7 MahaRERA onlyby Chirag Developers · possession Dec 2021
- Grande View 7 Capital MahaRERA onlyby Chirag Developers · possession Dec 2024
- Gulmohar Residency A Wing MahaRERA onlypossession Aug 2023
- Hare Krishna MahaRERA onlyby Yash Construction Company · possession Dec 2020
- Highrise Galaxy MahaRERA onlyby Highrise Buildcon · possession Jun 2019 · 0/25 booked
- Hira Enclave MahaRERA onlypossession Mar 2024
- Indraprastha Glory MahaRERA onlyby Indraprastha Infra · possession Dec 2022
- Ishana Associates MahaRERA onlyby Ishana Associates · possession Dec 2018
- Jai Residency MahaRERA onlyby Rajwade Developers · possession Jun 2019
- Jidnyasa MahaRERA onlyby Jidnyasa Pramoters & Developers · possession Dec 2018
- K.D. Hills MahaRERA onlyby Kulshree Associates · possession Dec 2023
- Katraj Sierra MahaRERA onlyby Bright Infra · possession Oct 2025
- Kool Homes Panchamrut MahaRERA onlyby Sanket Properties Private Limited · possession Dec 2020
- Krushnagandha MahaRERA onlypossession Jul 2022
- Kutumb MahaRERA onlyby Laxmi Developers · possession Dec 2024
- Kutumb MahaRERA onlyby Chandrangan Buildcon · possession Dec 2024
- Lake Homes MahaRERA onlyby Rays Infra · possession Mar 2018
- Lake Shine MahaRERA onlyby Poorva Developers · possession Jun 2025 · 24/67 booked
- Laxmi Heights MahaRERA onlyby Yash Associates · possession Oct 2025 · 9/20 booked
- Leela Skies MahaRERA onlyby Chandrangan Developers & Company · possession Mar 2025 · 3/22 booked
- Lotus Park MahaRERA onlyby Matrukrupa Developers · possession Dec 2019
- Luminare Heights MahaRERA onlyby Darsheel Group · possession Jan 2025
- Lush Green MahaRERA onlyby Pragati Constructions · possession Jun 2022
- Mauli Paradise MahaRERA onlyby Mauli Developers · possession Oct 2025
- Media Leaf MahaRERA onlyby Media Construction & Sons LLP · possession Jul 2025
- Meghsparsh Building C MahaRERA onlypossession Jul 2019
- Milestone MahaRERA onlyby Lagad Properties LLP · possession Mar 2023
- Morya Apartment MahaRERA onlypossession Dec 2024
- Mountscape MahaRERA onlyby Nayan Buildcon · possession Jun 2022
- MSR Olive MahaRERA onlyby Mind Space Realty Pvt. Ltd. · possession Mar 2025
- N B Opal MahaRERA onlyby Nanasaheb Bhintade Spacess Pvt. Ltd. · possession Dec 2023
- N B Square MahaRERA onlyby Ganesh Developers & Company · possession Mar 2019
- Nakashatra MahaRERA onlyby Sb Realty · possession Feb 2021
- Nandanvan Colina MahaRERA onlyby Sai Sankalp Developers · possession Dec 2021 · 30/79 booked
- Navkaar Heights MahaRERA onlyby Navkaar Nx Developers LLP · possession Dec 2024 · 4/10 booked
- Nilaya Wing A MahaRERA onlyby Good Earth Shelters · possession Dec 2019
- Nirmal Building A MahaRERA onlyby M/s. Prathamesh Promoters Company · possession Dec 2019
- Nirmal Building B MahaRERA onlyby Prathmesh Promoters Co · possession Dec 2022
- Nirman Ajinkyatara MahaRERA onlyby Nirman Developers · possession Dec 2018
- Nirman Aura Wing B MahaRERA onlyby Galaxy Hill Paradise LLP · possession Dec 2022
- Nirman Viva -F MahaRERA onlyby Nirman Homes · possession Dec 2023
- Omkar Swarup Phase-2 MahaRERA onlyby Saniket Infracon LLP · possession Jun 2025
- Panache MahaRERA onlyby Trimurti Sai Nath Infras LLP · possession Jul 2018
- Pardeshi-Darawade Height MahaRERA onlypossession Dec 2024
- Parijat Building A MahaRERA onlyby Shri Venkatesh Sharada Infracon · possession Dec 2017
- Pietra Enclave MahaRERA onlyby Pietra Infrastructure · possession Jun 2018
- Pietra Lake Castle MahaRERA onlypossession Dec 2022
- Pooja Niwas MahaRERA onlypossession Dec 2022
- Praga Serene MahaRERA onlypossession Dec 2022
- Primerose MahaRERA onlyby Gurukrupa Developers · possession Nov 2018 · 105/174 booked
- Pristine Pacific H , I MahaRERA onlyby Melange Developers · possession Dec 2019
- Pristine Pacific Part-2 MahaRERA onlyby Melange Developers · possession Aug 2018
- R K Imperial MahaRERA onlypossession Dec 2022
- Rajvika Skies MahaRERA onlypossession May 2025
- Rajyog phase II -B Wing MahaRERA onlyby Rajadhiraj Developers · possession Jan 2021
- Reelicon Kian MahaRERA onlypossession Dec 2019
- Renaissance Wing A MahaRERA onlypossession Mar 2023
- Rich County- C & D Wing MahaRERA onlyby Swastik Promoters & Builders · possession Dec 2021
- Rituparna Residence MahaRERA onlypossession Nov 2019
- Sai Balaji MahaRERA onlyby M/S Fortune Builders · possession Dec 2023
- Sai Datta Residency MahaRERA onlyby Sai Datta Enterprises · possession Mar 2023
- Sai Homes MahaRERA onlypossession Oct 2023
- Sai Majestic MahaRERA onlyby M/S Shree Bhairavnath Developers · possession Sep 2022
- Sai Plaza MahaRERA onlyby Shree Developers · possession Sep 2022
- saijeevan MahaRERA onlyby Tricon Construction Company · possession Sep 2018
- Samarth Enclave MahaRERA onlyby Shiv Samarth Developers · possession Jul 2022
- Samarth Vishwa MahaRERA onlyby Shree Samarth Developers · possession Dec 2018
- Samrat Sarthak MahaRERA onlyby Bora Realty LLP · possession Feb 2025
- Savali Heritage MahaRERA onlypossession Jun 2020
- Shelar Beldare Square MahaRERA onlyby Gurudatta Developers · possession Dec 2024
- Shivanya Classic MahaRERA onlyby Ansh Construction · possession May 2024
- Shravan Apartment MahaRERA onlypossession Jun 2018
- Shree Gajanan Shrusti MahaRERA onlyby Phoenix Developers · possession Dec 2023
- Shree Sadguru Chhaya MahaRERA onlypossession Dec 2023
- Shree Sadguru Darshan MahaRERA onlyby Shree Sadguru Developers · possession Mar 2021
- Shree Sadguru Vrundavan MahaRERA onlyby Shri Sadguru Developers · possession Dec 2024
- Shreepad Vallabh MahaRERA onlyby M/S Shreepad Developers · possession Jun 2024
- Shreeram Vrundavan MahaRERA onlypossession Oct 2024
- Shriyog MahaRERA onlyby A & A Associates · possession Mar 2019
- Shruti Prestige MahaRERA onlyby M/S. Shruti Developers · possession Mar 2018
- Shubharambh MahaRERA onlyby Crystal Homes Buildpro LLP · possession Dec 2024
- Shyam Vihar MahaRERA onlyby Krishna Developers · possession Mar 2018
- Siddhi Complex MahaRERA onlyby Siddhi Developers · possession Jan 2021
- Siddhi Samruddhi Katraj MahaRERA onlyby Sanghvi Developers · possession Nov 2021
- Silver Oak PH -II MahaRERA onlyby M/S Ashtekar Constructions · possession Jul 2018
- Sky Park MahaRERA onlyby Sky Line Developers · possession Sep 2024 · 19/31 booked
- Splendor Residency Phase 1 MahaRERA onlyby Aditi Promoters And Developers · possession Sep 2019
- Spring Heights MahaRERA onlyby Shri Ganesh Developers · possession Dec 2018
- Srinivasa Enclave MahaRERA onlyby Srinivasa Constructions · possession Dec 2023
- Sun Gloria MahaRERA onlyby S K Properties · possession Dec 2018
- Sun View MahaRERA onlyby Audumbar Developers · possession Jul 2022
- Sunfield MahaRERA onlyby Kalaratna Properties · possession Oct 2024
- Swapanpurti Heights MahaRERA onlyby Durvankur Developers · possession Dec 2022
- Tanishq Casita MahaRERA onlyby Navkaar Associates · possession Jun 2019
- TCG Gardenia Phase - I Building A B MahaRERA onlyby The Construction & Development Co · possession Jun 2025
- TCG Panorama MahaRERA onlyby The Construction & Development Company · possession Jan 2023
- TCG Panorama Building - A- Phase-III MahaRERA onlyby The Construction & Development Company · possession Dec 2023
- The Grand Majestique MahaRERA onlyby Venkateshwara Construction Company · possession Dec 2024
- Urja Residency MahaRERA onlypossession Mar 2018
- Vaishnavi Complex MahaRERA onlyby Vaishnavi Constructions · possession Jun 2025 · 38/40 booked
- Vaishnavi Vihar MahaRERA onlyby Vaishnavi Constructions · possession Dec 2022 · 36/56 booked
- Varad Anugrah B Wing MahaRERA onlyby Varad Developers · possession May 2023
- Varad Lake City MahaRERA onlyby Varad Shelters Pvt.ltd. · possession Mar 2023
- Vardhaman Pearl-Aboli MahaRERA onlypossession Apr 2021
- Vastushree MahaRERA onlyby Vastu Construction · possession Feb 2024 · 45/62 booked
- Vastushree MahaRERA onlyby Kalash Realities And Developers · possession Jan 2022
- Vasukamal EXPRESS MahaRERA onlypossession Sep 2025
- Vasundhara MahaRERA onlyby Riddhi Siddhi Developers · possession Mar 2022
- Ved - Ashritha Phase I MahaRERA onlyby Yogvinda Promoters & Developers Pvt. Ltd. · possession Oct 2023
- Venkatesh Lake Life Phase 1 MahaRERA onlyby Shree Venkatesh Realties · possession Jun 2018
- Venkatesh Lake Orchid MahaRERA onlyby Shree Venkatesh Buildcon Pvt Ltd · possession Dec 2018
- Venkatesh Navita MahaRERA onlyby Shree Venkatesh Realty · possession Dec 2021
- Venkatesh Orchid MahaRERA onlyby M/S Shree Sai Developers · possession Mar 2021
- Vidyannad MahaRERA onlypossession Mar 2023
- Vishnu Heights MahaRERA onlyby Omsai Developers · possession Jun 2022
- Wehome Lakeside MahaRERA onlypossession Oct 2018
- Westbrook MahaRERA onlyby Tara Constructions · possession May 2024
- Westbrook Avenue MahaRERA onlyby Tara Constructions · possession Jun 2024
- Windsor County MahaRERA onlyby Windsor Shelters · possession Apr 2022 · 157/256 booked
- Yashashree II MahaRERA onlyby Aashish Promoters & Builders · possession Dec 2023
- Yashoda Complex MahaRERA onlypossession Dec 2024
- Ziggurat MahaRERA onlyby M/S Built Up · possession Mar 2019
Questions buyers ask about Katraj
- How many new projects are there in Katraj, Pune?
- 152 projects registered with MahaRERA are being built or recently finished in Katraj as of 24 Nov 2026, out of 360 projects MahaRERA has listed there.
- What is the price of a 1 BHK flat in Katraj?
- Among 3 projects with a published 1 BHK price, starting prices run from ₹43.52 L to ₹49 L; the lowest is Basil Shivraj. Prices are from the builder's own site or two property sites that agree; parking, stamp duty, registration and GST are usually extra.
- Which projects in Katraj have the earliest possession?
- By the completion date the builder filed with MahaRERA: Astonia Royale Phase IV M and N Buildings (Sep 2025), Dugad Heights (Dec 2025), Excellaa Plazzo (Dec 2025). A filed date can move; each project's page shows whether it has.
- Do builders in Katraj keep their possession dates?
- 45 of the 152 projects being built in Katraj whose dates we have read have moved their MahaRERA possession date by 3 months or more, usually by 19 months, not counting MahaRERA's 2026 extension for all projects. Each project's page shows its own date history.
- Which builders have the most projects in Katraj?
- Among projects being built or recently finished: Chirag Developers (3), AMIT ENTERPRISES HOUSING LIMITED (2), Chandrangan Buildcon (2).
- Where do these Katraj numbers come from?
- MahaRERA's public register, read by Avasetu; each project's page shows the date we read its record. No builder pays to be listed.
From MahaRERA's public records, read on the date shown on each project's page. A project is listed under the area of the pincode it is filed under. This is general information, not investment or legal advice.