Skip to main contentSkip to navigation

All area guides

Upper Kharadi, Pune (2026): projects, booking numbers, prices, metro and what to check before you buy

Last checked: 19 October 2026

Upper Kharadi is the newer stretch between Kharadi's IT parks and Wagholi, where Lodha, Gera, Mahindra and Godrej are building. Here is every big project from the MahaRERA register with how many homes are already booked, what portals say about prices, where the metro really stands, and the questions a buyer should ask.

MahaRERA register, read 18-19 Oct 2026: the 9 big projects sold as Upper Kharadi or Kharadi Annex have 6,668 homes registered and 3,794 (57%) booked. The towers finishing first, in 2027 and 2028, are 92-100% booked; Godrej Ivara, registered in February 2026 with 2,792 homes due in August 2032, is 18% booked. The metro station named "Upper Kharadi Road" is approved but not yet under construction, and no opening date has been announced.

  • 43 projects on MahaRERA

MahaRERA register, as of 23 November 2026

Busy lately in Upper Kharadi, on the map

Numbered by homes booked lately and new launches on MahaRERA, not by share of homes booked as the Top list is. Each pin is the project's own place on Google Maps, checked against the builder's address. Pick a pin or a project for its possession date, homes booked and price.

  • New launch
  • Being built
  • Nearly ready
  • Listed by a local agent
  • Map data © OpenStreetMap contributors

Also on the map (square icons): World Trade Center Pune (office hub);EON IT Park (EON Free Zone) (office hub);G H Raisoni College of Engineering, Wagholi (college)

4 more active projects are not on the map yet: we have not checked their location. All projects in Upper Kharadi →

Key dates

Godrej Properties announces two land parcels in the Kharadi-Wagholi belt (14 acres, then 16 acres in Upper Kharadi)
2 and 17 June 2025
Union Cabinet approves Metro Line 2B, Ramwadi to Wagholi/Vitthalwadi (11.63 km, 11 stations)
25 June 2025
Maha Metro invites bids for the Ramwadi-Wagholi viaduct and six-lane elevated road
February 2026
Preparatory work starts at Ramwadi (barricading, soil tests); first phase runs about 4.7 km to Tulja Bhavani Chowk
September 2026
Lodha's first Upper Kharadi towers (Kharadi Pune Phase I, towers 1-4) completion date filed on MahaRERA
28 February 2027planned
Metro opening at Ubale Nagar and Upper Kharadi Road stations
No opening date has been announced. When the Cabinet approved the line in June 2025, it gave the whole corridor four years to build.not confirmed

Where is Upper Kharadi?

Upper Kharadi is a market name, not a village in the land records. It is the stretch along Upper Kharadi Main Road, north-east of EON IT Park, running towards Ubale Nagar and Wagholi.

  • PIN code reality: Most projects sold under this name carry Wagholi's PIN, 412207, on MahaRERA, and their builders' addresses say Wagholi. Kharadi proper is 411014.
  • Three sales names: Builders call this side "Upper Kharadi" (Lodha, Gera), "Kharadi Annex" (Mahindra) or "New Kharadi". None of them is a village in the land records.
  • The "New Kharadi" confusion: VTP's Pegasus township, often sold as New Kharadi, is on the Manjari side (PIN 412307), south of Kharadi, not in Upper Kharadi. Gera Avive Towers is sometimes listed as Upper Kharadi too, but its MahaRERA PIN is also 412307. Check the map pin of any project before you believe the locality name.
  • What your papers say: The sale agreement and the 7/12 extract name the village and survey number. A Wagholi address is normal here, but know it before you compare a project with flats in Kharadi proper.
  • Civic services: Wagholi came into Pune Municipal Corporation limits in 2021 with 22 other villages. Water, roads and drainage are still catching up, which is why the water question below matters.

The big projects and how much is already booked

Every row is from the MahaRERA register as we read it on 18 October 2026 (Godrej Ivara on 19 October). "Booked" is what the builder last filed with MahaRERA, so the real number may be a little higher. Brand names are what the builder or portals call the project; the register often uses a working name.

Project (builder)MahaRERA nameHomesBookedCompletion filed
Lodha Giardino (Lodha)Resale onlyKharadi Pune Phase I, towers 1-4611588 (96%)Feb 2027
Lodha Giardino (Lodha)Resale onlyKharadi Pune, towers 5-8509482 (95%)Sep 2027 to Oct 2029
Lodha Estilo (Lodha)LimitedKharadi Pune P2 and P3212195 (92%)Feb and Sep 2028
Lodha (newer phase)LimitedKharadi Pune P17846 (59%)Oct 2029
Lodha Camelot (Lodha)LimitedKharadi New Project, towers 1-4 and 11308145 (47%)Jul 2030 to Mar 2031
Gera's Island of Joy (Gera)Resale onlyGera Island of Joy Project620600 (97%)Sep 2028
Gera's World of Joy, tower M (Gera)Resale onlyGera's World of Joy M320320 (100%)Dec 2027
My Home Upper Kharadi (Godiva Promoters)LimitedMy Home Upper Kharadi143102 (71%)Apr 2029
Mahindra IvyLush, Kharadi Annex (Mahindra)LimitedCodename Crown towers A, B, E and IvyLush C, D1,075827 (77%)Jul to Dec 2030
Godrej Ivara (Godrej; promoter on MahaRERA: Manjari Housing Projects LLP)High availabilityGodrej Ivara, towers A-K2,792489 (18%)Aug 2032 (MahaRERA shows Dec 2032 with its 4-month extension)

Resale only 95% or more bookedLimited 30-94% bookedHigh availability under 30% booked

Total: 6,668 homes registered, 3,794 booked (57%). Without Godrej Ivara: 3,876 homes, 3,305 booked (85%). Builders' own names for towers change; search the MahaRERA number, not the brochure name.

  • The flats finishing first (Lodha Giardino, Gera Island of Joy, Gera World of Joy M) are 95-100% booked. If you want a home ready by 2027-28, expect to buy resale or one of the last few units, not to pick from a full price list.
  • What is still open is mostly in towers due in 2029-2031: Lodha Camelot, Lodha's P1 phase, Mahindra IvyLush and Godrej Ivara, which alone has about 2,300 homes not yet booked. Buying there means a 3-6 year wait.
  • Godrej's announcement was revenue potential (what it expects to sell, about ₹3,100 crore here and ₹4,200 crore on its 14-acre Kharadi-Wagholi land), not money already invested. The Upper Kharadi land is planned as premium flats plus high-street retail, about 2.5 million sq ft.

What does it cost?

There is no official price index for Upper Kharadi. Portals disagree, and most quote asking prices, not what buyers actually paid. These are the numbers we found, with where they come from.

Locality averages

WhatFigureSource
Upper Kharadi Main Road, average asking rateabout ₹10,350-10,400 per sq ftHomebazaar, 2025 series
Upper Kharadi, rate timelineabout ₹12,260 per sq ftAurum PropTech, 2026
Kharadi as a whole, asking₹14,199 per sq ft (Mar 2026), up from ₹13,515 (Jun 2025)Square Yards
Kharadi as a whole, apartments₹11,500 per sq ft, +7% in a year99acres

These are asking rates, which run ahead of what buyers actually pay, and they mix carpet and saleable area.

Project specifics

Project and sizeCarpet area and priceSource
Lodha Camelot 3 BHKabout 1,200-1,270 sq ft carpet, ₹2.21-2.34 croreHomebazaar, Houssed listings
Lodha Camelot 4 / 4.5 BHKabout 2,150-2,244 sq ft carpet, ₹3.99-4.23 croreHomebazaar, Houssed listings
My Home Upper Kharadi 2-3 BHKabout 740-957 sq ft carpet, ₹72 lakh-1.05 crorePropertyPistol, 360 Realtors listings

Portal prices lag the builder's price sheet. Ask for the all-in cost: agreement value, GST (5% on under-construction homes), stamp duty (7% in Pune city, including metro cess and LBT), registration (1%, capped at ₹30,000), parking, club and maintenance deposits.

  • A claim like "Upper Kharadi is 15-20% cheaper than Kharadi" depends on which two projects you compare. Compare the same size, same age and the all-in cost, not the per sq ft headline.
  • Some posts promise that prices will "jump" at possession or when the metro opens. Nobody knows that. Prices can also stay flat for years.

Metro and roads: what is real today

  • Metro Line 2B (Ramwadi to Wagholi/Vitthalwadi) is approved: 11.63 km, 11 stations, part of a ₹3,626 crore Phase 2 sanctioned in June 2025.
  • Its stations, in order: Viman Nagar, Somnath Nagar, Kharadi Bypass, Tulaja Bhavani, Ubale Nagar, Upper Kharadi Road, Wagheshwar Temple, Wagholi, Siddharth Nagar, Bakori Phata, Vitthalwadi.
  • Work so far (September 2026): barricading and soil tests near Ramwadi. The first phase being built stops at Tulja Bhavani Chowk, about 4.7 km. Ubale Nagar and Upper Kharadi Road come after that.
  • A six-lane elevated road is planned under the metro along Nagar Road, which matters more for daily traffic than the metro itself.
  • Pune Municipal Corporation approved a "model road" upgrade for Kesnand Phata to Dube Nagar Phata in Wagholi in April 2026.
  • Pune's Ring Road and "DP roads" to EON Phase 2 are often mentioned in sales pitches. We have not confirmed distances or dates for them, so do not count on them.

Work, schools and hospitals nearby

  • Jobs: EON IT Park, Commerzone and World Trade Center Pune in Kharadi are the reason this belt grew. Lodha says EON is 5 minutes and Commerzone 3 minutes by two-wheeler from Estilo in normal traffic. Drive it yourself at 9:30 am before you trust any minute count.
  • Airport: Lodha's figure is 20 minutes from Estilo by two-wheeler in normal traffic.
  • Schools named by builders here: Podar International School (on the Kharadi-Wagholi road), EuroSchool Kharadi, Oxford World School, Wellington College International, Dhole Patil institutes.
  • Hospitals: Motherhood and Manipal in Kharadi (about 10 minutes, builder's figure), EON Hospital.
  • Malls: Phoenix Marketcity (Viman Nagar) is the nearest big mall; Amanora and Seasons in Hadapsar are further.

Who it suits, and who should look elsewhere

  • Suits: families working in Kharadi who want a newer tower, a bigger carpet area and a full clubhouse, and can wait for possession or pay for a resale.
  • Suits: buyers comparing a ₹2-4 crore 3 or 4 BHK in Kharadi proper with the same money here: you usually get more space and newer amenities, with Wagholi on the papers.
  • Look elsewhere if you need to move in within a year and want to pick from many ready flats: the ready and nearly ready towers are almost sold out.
  • Look elsewhere if your office is in Hinjewadi or Baner: there is no fast road across the city from here today.

Seven questions to ask before you pay a token

  • What is the MahaRERA number of my tower, and what completion date is filed there? (Not the brochure date.)
  • How many homes in my tower are already booked? Look it up on MahaRERA or on our project pages.
  • Which village and survey number are on the agreement? Is the land in Wagholi or Kharadi?
  • Where does the society's water come from today: a PMC connection, a borewell or tankers? What did residents of the builder's finished towers pay for tankers last summer?
  • What is the carpet area as filed on MahaRERA, and what is the all-in cost (GST, stamp duty, parking, deposits)?
  • Has the builder's earlier tower on this road got its occupancy certificate (OC), and how late was it?
  • How far is the gate from the planned Ubale Nagar or Upper Kharadi Road metro station, walking?

Want the MahaRERA record for one of these towers? Name the project in chat and we will send its registration number, filed completion date and latest booking figures.

Projects and flats in Upper Kharadi

With the completion date filed on MahaRERA and how many homes are booked.

See every project in Upper Kharadi, with possession dates and homes booked from MahaRERA.

Homes in Upper Kharadi

East Pune corridor: running and coming

Nagar Road, Ramwadi to Wagholi

  • Running
  • Work started
  • Approved, not started
  • Elevated road
NAGAR ROADPune AirportLohegaon · openEON · WTC · ITPPKharadi offices · openLine 2Line 4, Kharadi to Khadakwasla · approvedRamwadiTulja BhavaniUpper Kharadi RoadWagholiVitthalwadi

Line 2B (11 stations) was approved in June 2025; work began at Ramwadi in September 2026, and the first phase runs to Tulja Bhavani. No opening date is announced for Upper Kharadi Road or Wagholi.

Diagram, not to scale. Status as of October 2026: Maha-Metro, PIB, MSRDC, MSIDC and our trackers.

What is coming to east Pune

Each with the stage it has actually reached, as of October 2026. Approved is not the same as running.

Already open

Offices
EON IT Park, World Trade Center, ITPP Kharadi (since 2023), Zensar
Shopping
Phoenix Marketcity, Viman Nagar
Airport
Pune Airport, Lohegaon

Landmarks near Upper Kharadi

The nearest running metro station to Upper Kharadi is Ramwadi (Aqua Line), about 6.5 km west of the middle of Upper Kharadi, as of November 2026.

Straight-line distances from the middle of Upper Kharadi, rounded; not travel times. Each name opens the place on Google Maps.

Metro

Work

Homes near these offices, by commute

Shopping

Hospitals

Colleges

Travel

Positions © OpenStreetMap contributors. Metro status from Maha-Metro (Lines 1 and 2) and PMRDA (Line 3).

In the MahaRERA records

43 projects in Upper Kharadi on MahaRERA's public register. See the projects in Upper Kharadi

Completion dates filed with MahaRERA

  • 20262 projects
  • 20277 projects
  • 20284 projects
  • 20299 projects
  • 203010 projects
  • 20318 projects
  • 20321 project

Recently listed or updated on MahaRERA

  • PRISTINE O2 WORLD PART 1LOGIPARK WAREHOUSING LLP · MahaRERA P52100054937 · completion filed for 30 April 2029 · listed or updated 10 October 2026
  • Kharadi New Project -Tower 6Lodha Developers Limited · MahaRERA PR1260002602176 · completion filed for 31 March 2031 · listed or updated 7 October 2026
  • Kharadi New Project -Tower 9Lodha Developers Limited · MahaRERA PR1260002602168 · completion filed for 30 September 2031 · listed or updated 6 October 2026
  • PRISTINE O2 WORLD PART 3LOGIPARK WAREHOUSING LLP · MahaRERA P52100079026 · completion filed for 30 April 2030 · listed or updated 8 September 2026
  • 31 Palma Drive Phase 2Sagar Construction Company · MahaRERA PR1261012601574 · completion filed for 31 December 2030 · listed or updated 18 August 2026

Source: MahaRERA public records, as of 23 November 2026. Dates are what the builder filed; check each project on the MahaRERA website before you book.

How Upper Kharadi grew

Projects registered with MahaRERA, per year

Projects registered with MahaRERA in Upper Kharadi, per year, 2018 to 2026
YearProjects registered in Upper Kharadi
20182
20192
20200
20211
20224
20235
20249
202513
20267

Source: MahaRERA public records, as of 23 November 2026. Counted by the year each project was registered; 2026 so far.

Upper Kharadi from above, then and now

Upper Kharadi from above, February 2017, Sentinel-2 satellite
Upper Kharadi, February 2017Contains modified Copernicus Sentinel data 2017
Upper Kharadi from above, February 2026, Sentinel-2 satellite
Upper Kharadi, February 2026Contains modified Copernicus Sentinel data 2026

Sentinel-2 satellite, true colour, 10 m a pixel: the same box on the least cloudy February to April pass of each year.

Upper Kharadi from space

Latest reading from space, Jan–Mar 2026 (looked Nov 2026)

Additional building groups appear in the central area.

From 2019 to 2026, the area transformed as agricultural fields and open ground in the north-west and north-east gave way to numerous new building blocks and cleared patches, matching high registration counts.

The seasons before

  1. Jan–Mar 2025More structures appear in the north-east.
  2. Jan–Mar 2024New building clusters expand in the north-west.
  3. Jan–Mar 2023Ground clearing expands across the north-east.

Upper Kharadi, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the middle of Upper Kharadi, about 1160 m across at about 0.3 m a pixel.

  1. Upper Kharadi from above, satellite picture of Nov 2022
    Nov 2022
  2. Upper Kharadi from above, satellite picture of Jan 2024
    Jan 2024
  3. Upper Kharadi from above, satellite picture of Feb 2025
    Feb 2025
  4. Upper Kharadi from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

How Upper Kharadi changed from space: Jan 2019 to Oct 2026, Copernicus Sentinel-2 (3 earlier seasons)
  1. Jan–Mar 2022Additional structures emerge in the north-west.
  2. Jan–Mar 2021New building blocks appear in the north-west sector.
  3. Jan–Mar 2019Sparse buildings and agricultural fields span the central and eastern areas.

Each picture is 6 km across, north up, centred on the middle of Upper Kharadi, at 10 m a pixel: it shows fields, roads and blocks of buildings, not single buildings or floors. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The lines are written from the pictures and the area's MahaRERA counts, and say only what can be seen. Contains modified Copernicus Sentinel data 2019-2026.

Open the full timelineMore of Pune from space

Latest from Upper Kharadi

Our posts about Upper Kharadi

  • 4 BHK from ₹4.93 crore4 BHK, 2,800 sq ft carpet Price starts at ₹4.93 crore Premium living within reach Comment INFO for a private tour. Lodha Giardino, Upper Kharadi: 4 BHK from ₹4.93 Cr onwards 💬 WhatsApp: 🌐 Website: house-deal.com 🏠 On…Reel · 22 Nov 2026
  • 4 BHK in Upper Kharadi at ₹2.49 Cr3.5 BHK with 1,393 sq ft carpet 4 BHK with 1,688 sq ft carpet Spacious living in Upper Kharadi Does your family need more room? Comment INFO Pristine O2 World, Upper Kharadi: 2, 2.5, 3, 3.5 & 4 BHK from ₹1.13 Cr…Reel · 22 Nov 2026
  • From ₹90 lakh, 2 BHKWork‑life balance starts here. Upper Kharadi: 2 & 3 BHK from ₹90 Lakh onwards 💬 WhatsApp: 🌐 Website: house-deal.com 🏠 On Avasetu: avasetu.in/agent/house-deal Photos and full details: ✓ Checked by the House Deal team…Reel · 22 Nov 2026
  • Pristine O2 World, Upper Kharadi: 2, 2.5, 3, 3.5 & 4 BHK from ₹1.13 Cr onwards🏠 Homes and prices • 2 BHK · 811 sq ft carpet · ₹1.13 Cr • 2.5 BHK · 991 sq ft carpet · ₹1.39 Cr • 3 BHK · 1,103 sq ft carpet · ₹1.64 Cr • 3.5 BHK · 1,393 sq ft carpet · ₹2.80 Cr • 4 BHK · 1,688 sq ft carpet · ₹2.49 Cr…Post · 21 Nov 2026
  • Upper Kharadi: 2 & 3 BHK from ₹90 Lakh onwards🏠 Homes and prices • 2 BHK · 709 sq ft carpet · ₹90 Lakh • 2 BHK · 725 sq ft carpet · ₹96 Lakh • 3 BHK · 865 sq ft carpet · ₹1.12 Cr 🗓️ Possession: Dec 2029 (the builder's date) 📍 International Tech Park Pune, Kharadi…Post · 20 Nov 2026
  • Ramwadi-Wagholi metro 2026: when does Upper Kharadi Road station actually come?🚇 Line 2B: Ramwadi to Wagholi/Vitthalwadi, 11.63 km, 11 stations (approved June 2025) Stations: Viman Nagar · Somnath Nagar · Kharadi Bypass · Tulaja Bhavani · Ubale Nagar · Upper Kharadi Road · Wagheshwar Temple ·…Reel · 22 Oct 2026

All posts

Our video updates

Questions people ask

Is Upper Kharadi part of Kharadi?

Not on paper. Upper Kharadi is a name builders use for the stretch along Upper Kharadi Main Road towards Wagholi. Most projects sold under it carry Wagholi's PIN, 412207, on MahaRERA. Kharadi proper is PIN 411014.

Is Upper Kharadi under PMC?

Yes. Wagholi, where most Upper Kharadi projects sit, came into Pune Municipal Corporation limits in 2021 along with 22 other villages. Residents' groups have complained about water supply since then, so ask each project where its water comes from.

When will the metro reach Upper Kharadi?

No date has been announced. Line 2B is approved and has a station called Upper Kharadi Road, but work started only at the Ramwadi end in September 2026, and the first phase being built stops at Tulja Bhavani Chowk.

What does a 3 BHK cost in Upper Kharadi?

Portal listings in 2026 put a Lodha Camelot 3 BHK of about 1,200-1,270 sq ft carpet at ₹2.2-2.3 crore, and 4 BHKs around ₹4 crore. Smaller projects start well below that. Ask the builder for the current price sheet and the all-in cost.

Can I get a ready-to-move flat in Upper Kharadi?

Few from builders. The towers finishing in 2027-28 were 92-100% booked on MahaRERA in October 2026. Most new stock is in towers due in 2029-2031, so a ready flat usually means resale.

Has Godrej launched in Upper Kharadi?

Yes. Godrej Ivara is registered with MahaRERA as PR1260002502426 (registered 20 February 2026; the promoter on MahaRERA is Manjari Housing Projects LLP). On 19 October 2026 it showed 11 towers (A to K, 37 to 43 floors), 2,792 homes, 489 booked, and the builder's completion date 16 August 2032 (MahaRERA shows 16 December 2032: it added 4 months to most projects in August 2026, Order 66/2026). Portals list it on Upper Kharadi Main Road; check the village and survey number on the agreement. Godrej announced a 16-acre Upper Kharadi parcel and a 14-acre Kharadi-Wagholi parcel in June 2025; we have not confirmed which one Ivara is.

Is Upper Kharadi the same as Kharadi Annex or New Kharadi?

Kharadi Annex (Mahindra's name) is on the same Wagholi side, PIN 412207. New Kharadi is often used for VTP's Pegasus township, which is on the Manjari side (PIN 412307), south of Kharadi. They are different places.

Will prices rise when the metro opens?

Nobody can promise that. Metro lines have lifted prices near stations in other cities, but the timing is uncertain and prices here already include some of that hope. Buy for the home and the commute you have today.

What is the difference between Kharadi and Upper Kharadi?

Kharadi is closest to the office campuses and more established; Upper Kharadi tends to have newer projects and more open space. Visit both at rush hour before you choose.

How do I check an under-construction project?

Look up its RERA registration and stated possession date on MahaRERA, ask for the approved plan, and visit a finished project by the same builder.

What should I ask about water and power?

Ask whether water is municipal, tanker or borewell, how much storage the building has, and what the power backup covers (lifts, common areas, your flat) and who pays.

Which IT parks and offices are near Upper Kharadi?

EON IT Park (EON Free Zone) (about 2 km south-west of the middle of Upper Kharadi); World Trade Center Pune (about 2 km west of the middle of Upper Kharadi). Straight-line distances, not travel times.

Which hospitals are near Upper Kharadi?

Manipal Hospital, Kharadi (about 4 km south-west of the middle of Upper Kharadi). Straight-line distances, not travel times.

How far is Pune airport from Upper Kharadi?

Pune Airport is about 6 km north-west of the middle of Upper Kharadi in a straight line; road distance is longer.

How many new projects were registered in Upper Kharadi in 2025?

13 projects in Upper Kharadi were registered with MahaRERA in 2025, as MahaRERA's register read on 23 November 2026.

Official links

⚠️ "Upper Kharadi", "Kharadi Annex" and "New Kharadi" are sales names. Check the village, survey number and MahaRERA number on the agreement, and never pay a token for a project that has no MahaRERA registration.