Vardhaman Altezza, Tathawade

See the site from above today

by Shree Vardhaman Associates · Tathawade, Mulshi, Pune district · 411033

Homes
2, 3 BHK
Price
from ₹77.43 L
EMI about ₹53,756 a month
Possession
Oct 2028
completion filed with MahaRERA
Booked
154 of 319

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • 48% of homes booked: MahaRERA shows 154 of 319 homes booked.
  • Buildings in this registration: 2, up to 34 floors.
  • 48% booked here; the middle of 94 Tathawade projects registered within a year of it is 43%.
  • Compared with other projects still being built in Tathawade: Compared with other projects still being built in Tathawade: its tallest building is higher than that of 99 of 114.
  • Completion date filed with MahaRERA: 30 Oct 2028.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹77.43 L – ₹99.29 L

    from 739 sq ft · ₹10,478/sq ft

    Last checked 20 Nov 2026

    All-in cost of the 2 BHK at ₹77.43 L: about ₹87.02 L
    Price (agreement value)₹77.43 L
    GST (5%)₹3.87 L
    Stamp duty (7%)₹5.42 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹87.02 L
  • 3 BHK

    ₹1.38 Cr – ₹1.46 Cr

    from 1,111 sq ft · ₹12,421/sq ft

    Last checked 20 Nov 2026

    All-in cost of the 3 BHK at ₹1.38 Cr: about ₹1.55 Cr
    Price (agreement value)₹1.38 Cr
    GST (5%)₹6.9 L
    Stamp duty (7%)₹9.66 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.55 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹53,756 a monthOn a ₹61.94 L loan (80% of ₹77.43 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Tathawade usually ask

  • 2 BHK about ₹70 – 90 L (38 projects)
  • 2.5 BHK about ₹90 L – ₹1.1 Cr (4 projects)
  • 3 BHK about ₹90 L – ₹1.3 Cr (37 projects)
  • 4 BHK about ₹1.3 – 2 Cr (7 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Tathawade, rounded. Use it to judge an offer, not as a price.

Tathawade average ₹10,752/sq ft across 18 projectsThe middle asking price per sq ft of other projects in Tathawade.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Vardhaman Altezza from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Vardhaman Altezza, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024 and Oct 2025, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Vardhaman Altezza from above, satellite picture of Nov 2022
    Nov 2022
  2. Vardhaman Altezza from above, satellite picture of Jan 2024
    Jan 2024
  3. Vardhaman Altezza from above, satellite picture of Oct 2025
    Oct 2025 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Active construction continues with defined building shadows near the map pin.

Registered with MahaRERA May 2024 · possession filed for Oct 2028

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Vardhaman Altezza shows open land and vegetation through early 2024. Following its May 2024 RERA registration, ground clearing and construction footprints appear, with tall building shadows developing visibly through 2025 and 2026.

The seasons before

  1. Apr–May 2026Site activity persists with clear structures and shadows present in the area.
  2. Jan–Mar 2026Building footprints expand inside the ring with long shadows visible.
  3. Oct–Dec 2025Further structural growth is evident with prominent building shadows across the site.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Apr–May 2025Ground cleared
  2. Jan–Mar 2025Tall structure shadows and active footprints grow within the ring.
  3. Oct–Dec 2024New building footprints and shadows indicate construction following the May 2024 registration.
  4. Apr–May 2024Earthwork and early site clearing are visible inside the ring.
  5. Jan–Mar 2024Ground clearing begins inside the ring prior to project registration.
  6. Oct–Dec 2023Green patches reappear following rains, while the ground layout remains stable.
  7. Apr–May 2023Dry soil and scattered plants dominate the ring area without alterations.
  8. Jan–Mar 2023Sparse vegetation and open ground fill the ring with little change.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)4.2 km
  • Baner-Balewadi High Street6.2 km
  • Pune Railway Station16 km
  • Pune Airport (Lohegaon)16.5 km

Nearby

  • HospitalAditya Birla Memorial Hospital1.6 km
  • CollegeSri Balaji University, Pune (SBUP)1.7 km
  • CollegeIndira College of Commerce & Science (ICCS)1.8 km
  • TempleShani Mandir2 km
  • SchoolAkshara International School & Junior College2.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • 2 Towers.

Amenities

  • Ample car parking.

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

30 Oct 2028

The completion date filed with MahaRERA is 30 Oct 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2028.

Beside other Tathawade projects

Worked out by Avasetu
Homes booked
48%
The middle of 94 Tathawade projects registered within a year of it: 43%.
Completion date
Not moved by the builder
53 of 233 Tathawade projects being built moved theirs 3 months or more.

From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
154 of 319
Towers
2 in this registration
The tallest has 34 floors.
Registered on
31 May 2024
MahaRERA registration
P52100056423
Listed or updated on MahaRERA 31 May 2024.
Promoter (builder)
Shree Vardhaman Associates
Project type
Residential / Group Housing
Pincode
411033

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA and checked sites
  • About 160 homes per acre (319 homes on 2 acres, from two property sites that agree). Towers stand close: ask how far your tower is from the next and which flats face another tower.
  • Towers go up to 34 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

2 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
BUILDING C341450
Building D341740

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
2 acres

Last checked 20 Nov 2026. MahaRERA counts where they differ.

Shree Vardhaman Associates: track record

From MahaRERA records

Shree Vardhaman Associates has 1 project in our MahaRERA register for Pune.

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Tathawade

FAQ

What is the price of Vardhaman Altezza?

2 BHK: ₹77.43 L to ₹99.29 L; 3 BHK: ₹1.38 Cr to ₹1.46 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Vardhaman Altezza?

The completion date filed with MahaRERA is 30 Oct 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Vardhaman Altezza?

Vardhaman Altezza is registered with MahaRERA as P52100056423.

How many towers and floors does Vardhaman Altezza have?

MahaRERA lists 2 buildings, the tallest with 34 floors.

How many flats are there in Vardhaman Altezza?

MahaRERA lists 319 units.

How many homes in Vardhaman Altezza are booked?

154 of 319 homes were booked as per MahaRERA on 13 Nov 2026.

Who is the builder of Vardhaman Altezza?

The promoter registered with MahaRERA is Shree Vardhaman Associates.

Where is Vardhaman Altezza?

Vardhaman Altezza is in 411033, Mulshi, Pune district (pincode 411033).

Which hospital is nearest to Vardhaman Altezza?

Aditya Birla Memorial Hospital, about 1.6 km away in a straight line from the map position; the drive is longer.

Which school is nearest to Vardhaman Altezza?

Akshara International School & Junior College, about 2.3 km away in a straight line from the map position; the drive is longer.

How far is Vardhaman Altezza from Pune Airport?

About 16.5 km in a straight line from the map position; the drive is longer.

How far is Vardhaman Altezza from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 4.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Vardhaman Altezza.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 31 May 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 9 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for VARDHAMAN ALTEZZA

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment