

VJ Yashwin Enchante, Upper Kharadi
Filed on MahaRERA as Yashwin Enchante Phase 1
See the site from above todayby Vilas Javdekar Developers · Upper Kharadi, Pune · 412207
- Homes
- 2, 3 BHK
- Price
- from ₹90 L
- EMI about ₹62,483 a month
- Possession
- from Oct 2027
- its parts filed Oct 2027 to Apr 2030
- Booked
- 1,074 of 2,041
- across all 2 of its MahaRERA registrations
What stands out
As of 4 Nov 2026, from MahaRERA and the sources below.
- 94% of homes booked: Buyers have already booked 887 out of the 941 homes registered in this phase.
- The finish date changed from 30 Jun 2027 to 30 Oct 2027 solely because MahaRERA's order added 4 months to the timeline.
Updated 21 Nov 2026
Pictures
From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.
Price
2 BHK
₹90 L – ₹96 L
from 725 sq ft · ₹12,414/sq ft
Last checked 3 Nov 2026
All-in cost of the 2 BHK at ₹90 L: about ₹1.01 Cr
Price (agreement value) ₹90 L GST (5%) ₹4.5 L Stamp duty (7%) ₹6.3 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.01 Cr 3 BHK
From ₹1.12 Cr
Last checked 3 Nov 2026
All-in cost of the 3 BHK at ₹1.12 Cr: about ₹1.26 Cr
Price (agreement value) ₹1.12 Cr GST (5%) ₹5.6 L Stamp duty (7%) ₹7.84 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.26 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹62,483 a monthOn a ₹72 L loan (80% of ₹90 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Upper Kharadi usually ask
- 2 BHK about ₹90 L – ₹1.2 Cr (9 projects)
- 2.5 BHK about ₹1.3 – 1.5 Cr (5 projects)
- 3 BHK about ₹1.3 – 1.6 Cr (10 projects)
- 3.5 BHK about ₹1.9 – 2.6 Cr (7 projects)
- 4 BHK about ₹2.3 – 3 Cr (10 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Upper Kharadi, rounded. Use it to judge an offer, not as a price.
Upper Kharadi average ₹11,254/sq ft across 4 projectsThe middle asking price per sq ft of other projects in Upper Kharadi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
VJ Yashwin Enchante from above, today
VJ Yashwin Enchante, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Apr–May 2026 (looked Nov 2026)
Main building envelopes remain stable with surrounding layout work. Little change.
Registered with MahaRERA Aug 2022 · possession filed for from Oct 2027
The site transitions from bare land in 2021 to active construction following the August 2022 MahaRERA registration. By 2023, foundations and building footprints emerge, leading to tall structures casting prominent shadows through 2025 and 2026.
The seasons before
- Jan–Mar 2026Advanced structural silhouettes visible inside the ring.
- Oct–Dec 2025Multiple building structures present with distinct shadows.
- Apr–May 2025Dense structural footprints and casting shadows fill the ring area.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (11 earlier seasons)
- Jan–Mar 2025Tall building shadows clearly visible indicating active construction.
- Oct–Dec 2024Structure outlines become clearer with surrounding earthworks.
- Apr–May 2024Construction activity intensifies with defined building footprints and shadows.
- Jan–Mar 2024Dark shadows from tall structures appearing inside the ring.
- Apr–May 2023Early foundations and structural footprints appearing within the ring.
- Jan–Mar 2023Earthworks and ground clearing visible inside the ring.
- Oct–Dec 2022Initial ground clearing visible after the August registration. Little change.
- Jan–Mar 2022Undeveloped terrain with sparse vegetation around the ring. Little change.
- Oct–Dec 2021Ground remains cleared with no new activity. Little change.
- Apr–May 2021Bare earth remains visible inside the ring. Little change.
- Jan–Mar 2021Empty ground with no structures inside the ring. Little change.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Flat sizes
- 2 BHK: 690 to 710 sq ft, carpet area
Your agreement for sale states the final carpet area. Tell us the home you like and the Avasetu team confirms its size.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- EON IT Park, Kharadi3.1 km
- World Trade Center, Kharadi3.3 km
- Pune Airport (Lohegaon)6.7 km
- Magarpatta City7.8 km
Nearby
- CollegeG.H. Raisoni College OF Engineering & Management, PUNE1.1 km
- TempleWagheshwar Temple1.3 km
- Industrial areaInternational Tech Park Pune, Kharadi2.1 km
- Industrial areaEon IT Park Pune3.1 km
- SchoolBjs School Wagholi3.6 km
Straight-line distances; the drive is longer. Places: Google Maps.
Project facts
- Project spans 12 acres. (the builder's site)
Amenities
- Three-storey clubhouse. (the builder's site)
- 1200 × 600 mm vitrified tiles with 3‑inch skirting throughout. (the builder's site)
- Rainwater harvesting system installed. (the builder's site)
- 24x7 security. (the builder's site)
Last checked 18 Nov 2026.
MahaRERA record
From MahaRERA, read 4 Nov 2026Possession date
30 Oct 2027 to 30 Apr 2030
The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.
For P52100046510: 30 Oct 2027. The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Jun 2027.
The record
- Homes booked
- 1,074 of 2,041
- Across all 2 of its MahaRERA registrations. P52100046510 alone: 887 of 941.
- Towers
- 5 in this registration
- The tallest has 25 floors.
- Units
- 941
- 887 homes, 54 shops or offices.
- Registered on
- 10 Aug 2022
- Main MahaRERA registration
- P52100046510
- Listed or updated on MahaRERA 12 Feb 2026.
- Promoter (builder)
- Vilas Javdekar Infinitee Developers Pvt. Ltd.
- Project type
- Others
- Pincode
- 412207
Check before you book
From MahaRERA- 54 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.
Tower by tower
2 registrations, 5 buildings
Towers and phases (2 registrations)
From MahaRERAMahaRERA holds VJ Yashwin Enchante as 2 registrations. Together they list 2,041 homes, 1,074 booked.
| Registration | Completion filed | Booked |
|---|---|---|
| Yashwin Enchante Phase 1P52100046510 (opens in a new tab) | 30 Oct 2027at registration 30 Jun 2027 | 887 of 941 |
| Yashwin Enchante Phase 2P52100077455 (opens in a new tab) | 30 Apr 2030at registration 31 Dec 2029 | 187 of 1,100 |
Each row is its own MahaRERA registration, as filed.
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A1 - A2 | 25 | 206 | 0 |
| B1 - B2 | 25 | 147 | 0 |
| D1 - D2 | 25 | 198 | 17 |
| E1 - E2 | 25 | 166 | 23 |
| F1 - F2 | 25 | 170 | 14 |
As filed with MahaRERA (sanctioned floors).
Vilas Javdekar Developers: track record
From MahaRERA recordsVilas Javdekar Developers has 41 projects in our MahaRERA register for Pune. 1 of 41 with both dates moved the completion date 3 months or more later, by 12 months on average.
- Yashwin Jeevancompletion filed 30 Apr 2018
- Yashwin E,F,Gcompletion filed 31 Dec 2018
- Prudentia - Phase 1completion filed 30 Jun 2019
- Yashwin Anandcompletion filed 30 Jun 2019
- Portiacompletion filed 31 Dec 2019, moved 12 months later
- Yashwin Acompletion filed 30 Sep 2020
- YashONE Phase - Icompletion filed 30 Dec 2020
- YASH101completion filed 30 Mar 2021
- Palladio Phase 2completion filed 30 Dec 2022
- YashONE Pirangut Phase IIcompletion filed 30 Dec 2022
- VJ One Avenuecompletion filed 30 Dec 2023
- YashONE Hinjawadi - Phase 1completion filed 30 Dec 2023
- VJ 67 K Inclusive Housingcompletion filed 31 Dec 2023
- Yashwin Orizzonte - Phase Icompletion filed 30 Jun 2024
- VJ IndiLifecompletion filed 30 Sep 2024
- VJ Town Centrecompletion filed 30 Sep 2024
- MHADA - Yashwin Encorecompletion filed 30 Dec 2024
- VJ Grand Centralcompletion filed 30 Dec 2024
- YashONE Wakad Centralcompletion filed 30 Dec 2024
- Yashwin Encorecompletion filed 30 Dec 2024
- YASHWIN HINJAWADIcompletion filed 30 Jun 2025
- YashONE Infinitee - Phase Icompletion filed 30 Jun 2025
- 51B Inclusive Housingcompletion filed 31 Dec 2025
- Yashwin SuperNovacompletion filed 30 Mar 2026
- YashONE Eternitee Phase 1completion filed 30 Apr 2026
- 172W Inclusive Housingcompletion filed 30 Jun 2026
- Yashwin NuovoCentrocompletion filed 30 Jun 2026
- UK1321 Inclusive Housingcompletion filed 31 Dec 2026
- 38K Inclusive Housingcompletion filed 30 Apr 2027
- VJ Central Avenuecompletion filed 30 Apr 2027
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Upper Kharadi
- 343 Crestfrom ₹71 L · possession Dec 2027Starts ₹19 L lower than VJ Yashwin Enchante
- Lodha Kharadi Pune Phase Ifrom ₹1.6 Cr · possession Feb 2027Starts ₹70 L higher than VJ Yashwin Enchante
- Menlo Business Hubpossession Dec 2027
- Lodha Kharadi Pune P2from ₹2.54 Cr · possession Feb 2028Starts ₹1.64 Cr higher than VJ Yashwin Enchante
- Lodha Kharadi Pune P33, 3.5, 4.5, 5 BHK · from ₹2.34 Cr · possession Sep 2028Starts ₹1.44 Cr higher than VJ Yashwin Enchante
- Vilas Javdekar UK1321 Inclusive Housingpossession Dec 2026
More by Vilas Javdekar Infinitee Developers Pvt. Ltd.
- Vilas Javdekar Palladio Presidential Towers Phase 12, 3, 4 BHK · from ₹1.2 Cr · possession Dec 2032
- Vilas Javdekar Pratik Nagar Palladio Kothrud Central2 BHK · from ₹1.67 Cr · possession Apr 2031
- Vilas Javdekar UK1321 Inclusive Housingpossession Dec 2026
- Vilas Javdekar YashONE Eterniteepossession Apr 2026
- Vilas Javdekar YashONE Infiniteepossession Jun 2025
- Vilas Javdekar Yashwin Urbo Centropossession Apr 2028
FAQ
What is the price of VJ Yashwin Enchante?
2 BHK: ₹90 L to ₹96 L; 3 BHK: ₹1.12 Cr, checked on 3 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of VJ Yashwin Enchante?
The 2 MahaRERA registrations of VJ Yashwin Enchante have filed completion dates from 30 Oct 2027 to 30 Apr 2030. For P52100046510: The completion date filed with MahaRERA is 30 Oct 2027; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of VJ Yashwin Enchante?
VJ Yashwin Enchante is registered with MahaRERA in 2 parts (towers or phases): P52100046510, P52100077455.
How many towers and floors does VJ Yashwin Enchante have?
MahaRERA lists 5 buildings in registration P52100046510, one of the project's 2, the tallest with 25 floors.
How many flats are there in VJ Yashwin Enchante?
MahaRERA lists 2041 units across all 2 of its MahaRERA registrations; P52100046510 has 941.
How many homes in VJ Yashwin Enchante are booked?
1074 of 2041 homes were booked as per MahaRERA on 4 Nov 2026, across all 2 of its MahaRERA registrations.
Who is the builder of VJ Yashwin Enchante?
The promoter registered with MahaRERA is Vilas Javdekar Infinitee Developers Pvt. Ltd.. Our register has 41 Pune projects by Vilas Javdekar Developers; 1 of 41 with both dates moved their completion date 3 months or more later.
Where is VJ Yashwin Enchante?
VJ Yashwin Enchante is in Upper Kharadi, Pune (pincode 412207).
Which school is nearest to VJ Yashwin Enchante?
Bjs School Wagholi, about 3.6 km away in a straight line from the map position; the drive is longer.
How far is VJ Yashwin Enchante from Pune Airport?
About 6.7 km in a straight line from the map position; the drive is longer.
How far is VJ Yashwin Enchante from EON IT Park, Kharadi?
About 3.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VJ Yashwin Enchante.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 12 Feb 2026
- Dates and homes bookedFrom MahaRERA
Checked 18 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 4 Nov 2026
- Location and nearbyGathered and checked
Checked 18 Nov 2026
- DescriptionGathered and checked
Checked 5 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (3 Nov 2026)
- Home sizesGathered and checked
The builder's site, or two property sites that agree
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (18 Nov 2026)
Get the price sheet and floor plans for Yashwin Enchante Phase 1
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

