Gera Avive Towers Phase I, picture 1Gera Developments logo
From House Deal's listing
MahaRERA registered PR1261012500289Verify on MahaRERA (opens in a new tab)Early stage

Gera Avive Towers Phase I, Upper Kharadi

Filed on MahaRERA as Geras Avive Towers Phase I

Also known as: Gera's Avive Towers Phase I

See the site from above today

by Gera Developments · Upper Kharadi, Pune · 412307

Homes
3, 3.5 & 4.5 BHK
Price
from ₹1.37 Cr
EMI about ₹95,113 a month
Possession
Jan 2031
completion filed with MahaRERA
Booked
219 of 517
40 booked in the last 21 days

Avasetu's read (from MahaRERA data, 16 Nov 2026)

The project is selling faster than similar ones, with 42% booked. The builder has delayed 4 of 22 projects. You may want to ask the builder about the likelihood of delays, given their record.

What stands out

As of 20 Nov 2026, from MahaRERA and the sources below.

  • 42% of homes booked: Buyers have already booked 219 of the 517 homes in this part of the project. Similar projects in Upper Kharadi registered around the same time are at about 22%.
  • Completion date 1 Jan 2031: The builder originally filed for a September 2030 finish. MahaRERA's order added the 4 months that lead to the current January 2031 date.

Updated 21 Nov 2026

Pictures

Gera Avive Towers Phase I, picture 2
Gera Avive Towers Phase I, picture 3
Gera Avive Towers Phase I, picture 4

From House Deal's listing. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Sample flat video

  • Sample flat · from House Deal · Watch

Gera Avive Towers Phase I in a short video

3.9 km from Eon IT Park Pune · 15.4 seconds
Open the video on its own page

Price

On offer

Listed by House Deal

From ₹1.37 Cr

3, 3.5 & 4.5 BHK · apartments · 1,062 to 2,224 sq ft carpet

HomeCarpet areaPricePer sq ft
3 BHK1,062 sq ft₹1.37 Cr₹12,900/sq ft
3 BHK1,264 sq ft₹1.59 Cr₹12,579/sq ft
3 BHK1,369 sq ft₹1.82 Cr₹13,294/sq ft
3.5 BHK1,677 sq ft₹2.26 Cr₹13,476/sq ft
4.5 BHK2,224 sq ft₹3.02 Cr₹13,579/sq ft

With a home loan, your own cash for the 3 BHK: about ₹44.14 LYour own cash, about: the part banks may not lend (RBI: 75% to 90% of the price is the most a home loan covers), stamp duty 7% (6% if a woman buys) and registration up to ₹30,000. Add GST (5% on homes being built) if the price leaves it out.

EMI, as an example: about ₹95,113 a monthOn a ₹1.1 Cr loan (80% of the price) at 8.5% for 20 years. Ask your bank for its rate.

All-in cost of the 3 BHK at ₹1.37 Cr: about ₹1.54 Cr
Price (agreement value)As quoted, before taxes.₹1.37 Cr
GST (5%)On a home being built.₹6.85 L
Stamp duty (7%)The rate inside PMC and PCMC limits; 6% if a woman buys. Charged on the ready reckoner value instead when that is higher.₹9.59 L
Registration (1%, at most ₹30,000)₹30,000
Total before the builder's charges₹1.54 Cr

Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

From the agent's listing, 20 Nov 2026.

Upper Kharadi average ₹12,384/sq ft across 4 projectsThe middle asking price per sq ft of other projects in Upper Kharadi.

Want this at today's price?

Prices change. House Deal confirms today's price, what is still available and the full cost.

Ask for the current offer

Gera Avive Towers Phase I from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Gera Avive Towers Phase I, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Gera Avive Towers Phase I from above, satellite picture of Nov 2022
    Nov 2022
  2. Gera Avive Towers Phase I from above, satellite picture of Jan 2024
    Jan 2024
  3. Gera Avive Towers Phase I from above, satellite picture of Jan 2025
    Jan 2025
  4. Gera Avive Towers Phase I from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Prominent building footprints with long shadows cast southward across the ring.

possession filed for Jan 2031

Month by month, Jan 2021 to Nov 2026: 41 clear months, October to May (the monsoon is under cloud).

Registered with MahaRERA in Jul 2025. This is the ground within 100 m of its map pin as the satellite has seen it each season; a new picture is added every season as the project goes on.

The seasons before

  1. Apr–May 2026Bright footprint and excavated surfaces appear inside the eastern half of ring.
  2. Oct–Dec 2025Work shows after Jul 2025 registration with deeper shadows and ground changes.
  3. Oct–Dec 2024Dark shadow extends along southern edge; ring surface remains largely open.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (7 earlier seasons)
  1. Oct–Dec 2023Broad cleared ground remains; adjacent construction visible to the west.
  2. Apr–May 2023Bright paved or cleared ground extends along the ring's northwest edge.
  3. Jan–Mar 2023Most vegetation is gone; cleared ground covers the ring interior.
  4. Oct–Dec 2022Dark shadow appears northwest; ground in ring is partially disturbed.
  5. Jan–Mar 2022Patches of green remain amid widespread bare earth in the ring.
  6. Oct–Dec 2021Vegetation inside the ring decreases as surrounding plots undergo earthmoving.
  7. Jan–Mar 2021Greenery covers central ring; surrounding ground exhibits early clearing and tracks.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

See the 8 floor plans

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi4.1 km
  • World Trade Center, Kharadi4.2 km
  • Magarpatta City6.7 km
  • Pune Airport (Lohegaon)9.3 km

Nearby

  • Railway stationManjari Budruk3.5 km
  • CollegeG.H. Raisoni College OF Engineering & Management, PUNE3.7 km
  • SchoolThe Orbis School, Keshav Nagar, Pune (CBSE)3.9 km
  • Industrial areaEon IT Park Pune3.9 km
  • Industrial areaInternational Tech Park Pune, Kharadi4.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

Last checked 20 Nov 2026.

MahaRERA record

From MahaRERA, read 20 Nov 2026

Possession date

1 Jan 2031

The completion date filed with MahaRERA is 1 Jan 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 1 Sep 2030.

Gera Avive Towers Phase I: what changed, as we read it

40 more homes booked between 13 Oct 2026 and 3 Nov 2026: 179 to 219, of 517 homes.

13 Oct 20263 Nov 2026
  • 3 Nov 2026: 219 booked
  • 13 Oct 2026: 179 booked

Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.

Beside other Upper Kharadi projects

Worked out by Avasetu
Homes booked
42%
The middle of 12 Upper Kharadi projects registered within a year of it: 22%.
Completion date
Not moved by the builder
2 of 21 Upper Kharadi projects being built moved theirs 3 months or more.

From MahaRERA records read 20 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
219 of 517
Towers
3 in this registration
The tallest has 40 floors.
Registered on
16 Jul 2025
MahaRERA registration
PR1261012500289
Listed or updated on MahaRERA 14 Jan 2026.
Promoter (builder)
Gera Real Estate Private Limited
Project type
Residential / Group Housing
Pincode
412307

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Completion is filed for Jan 2031, about 4 years away. Until then you may pay rent and loan interest (pre-EMI) together; ask for a construction-linked payment plan.
  • Towers go up to 40 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower-2392030
Tower-3391710
Tower-4401430

As filed with MahaRERA (sanctioned floors).

Gera Developments: track record

From MahaRERA records

Gera Developments has 22 projects in our MahaRERA register for Pune. 4 of 22 with both dates moved the completion date 3 months or more later, by 28 months on average.

  • A3, Song of Joy, Geras Greensville2completion filed 30 Jun 2019
  • B1 Song Of Joy Geras Greenville 2completion filed 31 Dec 2019
  • Geras Isle Royale Tower 2 and 3completion filed 30 Dec 2021
  • Geras Imperium Risecompletion filed 30 May 2022, moved 17 months later
  • Geras Imperium Oasiscompletion filed 30 Dec 2022
  • Geras Imperium Alphacompletion filed 30 Jan 2023
  • Geras Misty Waterscompletion filed 14 Jun 2023, moved 12 months later
  • Geras Adaracompletion filed 30 Oct 2023
  • Geras World of Joy Ccompletion filed 15 Sep 2025
  • Geras World of Joy Scompletion filed 15 Sep 2025
  • SHRISHTIcompletion filed 15 Sep 2025
  • Geras Planet of Joy Project Icompletion filed 31 Dec 2025
  • Geras Imperium Gateway A and Ccompletion filed 31 Mar 2026
  • Geras Imperium Gateway Bcompletion filed 31 Mar 2026
  • Geras Affiniacompletion filed 30 Apr 2027
  • 343 CRESTcompletion filed 30 Dec 2027, moved 8 months later
  • THE JOY STREET GERAS ISLAND OF JOYcompletion filed 30 Jan 2028
  • Geras Island of Joy Project Acompletion filed 15 Sep 2028
  • Joy on The Tree Tops Project Acompletion filed 3 Jul 2030
  • Geras Isle Royale Tower 4 and 5completion filed 31 Dec 2030, moved 76 months later
  • Geras Joy on the Tree Tops Project Bcompletion filed 30 Apr 2032

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

More from House Deal

All homes from House Deal

FAQ

What is the price of Gera Avive Towers Phase I?

A local agent quotes from ₹1.37 Cr for Gera Avive Towers Phase I. Prices change often: ask for today's price and what it includes.

What is the possession date of Gera Avive Towers Phase I?

The completion date filed with MahaRERA is 1 Jan 2031; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Gera Avive Towers Phase I?

Gera Avive Towers Phase I is registered with MahaRERA as PR1261012500289.

How many towers and floors does Gera Avive Towers Phase I have?

MahaRERA lists 3 buildings, the tallest with 40 floors.

How many flats are there in Gera Avive Towers Phase I?

MahaRERA lists 517 units.

How many homes in Gera Avive Towers Phase I are booked?

219 of 517 homes were booked as per MahaRERA on 20 Nov 2026.

Who is the builder of Gera Avive Towers Phase I?

The promoter registered with MahaRERA is Gera Real Estate Private Limited. Our register has 22 Pune projects by Gera Developments; 4 of 22 with both dates moved their completion date 3 months or more later.

Where is Gera Avive Towers Phase I?

Gera Avive Towers Phase I is in Upper Kharadi, Pune (pincode 412307).

Which school is nearest to Gera Avive Towers Phase I?

The Orbis School, Keshav Nagar, Pune (CBSE), about 3.9 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Gera Avive Towers Phase I?

Manjari Budruk, about 3.5 km away in a straight line from the map position; the drive is longer.

How far is Gera Avive Towers Phase I from Pune Airport?

About 9.3 km in a straight line from the map position; the drive is longer.

How far is Gera Avive Towers Phase I from EON IT Park, Kharadi?

About 4.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Gera Avive Towers Phase I.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 14 Jan 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 20 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 20 Nov 2026

  • Location and nearbyGathered and checked

    Checked 20 Nov 2026

  • DescriptionGathered and checked

    Checked 20 Nov 2026

  • PriceGathered and checked

    The agent's price sheet (20 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (20 Nov 2026)

Get the price sheet and floor plans for Geras Avive Towers Phase I

House Deal calls or WhatsApps you back; your number is never shared without your OK.

What would you like?

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment