New projects in Kharadi, Pune
Every project MahaRERA lists in Kharadi: 157 being built or recently finished, and 166 older ones. Each page shows the completion date the builder filed with MahaRERA, whether it has moved, and how many homes are booked, with the date we read the record.
Being built (157)
- 38K Inclusive Housing MahaRERA onlycompletion filed 30 Apr 2027
- 48 WILLOW BY OXY MahaRERA onlycompletion filed 30 Oct 2029
- 96 Arrcade MahaRERA onlycompletion filed 30 Apr 2028
- A S Corner MahaRERA onlycompletion filed 31 Jul 2027
- AASTHA BUSINESS BAY MahaRERA onlyARUNITA LANDMARK LLP · completion filed 30 Apr 2028
- ALERIA - BLOCK B MahaRERA onlyKOLTE-PATIL DEVELOPERS LIMITED · completion filed 29 Jun 2027
- ALFA PREMIO PHASE 1 MahaRERA onlyARK PREM CONSTRUCTIONS · completion filed 31 Dec 2025
- ANANDI MahaRERA onlySAI DEVELOPERS · completion filed 30 Apr 2030
- ANSHUL IRA MahaRERA onlyS.V. ASSOCIATES · completion filed 30 Apr 2027
- Aqura Prime MahaRERA onlyAQURA BUILDER & DEVELOPER PRIVATE LIMITED · completion filed 30 Nov 2028
- ARV UTHVILLE MahaRERA onlycompletion filed 30 Dec 2025
- Atulyam-Inclusive Housing Checked 2/4Shubh Housing · completion filed 30 Apr 2028
- AUGUST TOWERS PH 1 CheckedBramhacorp Limited · completion filed 30 Apr 2029
- AUGUST TOWERS PH 2 MahaRERA onlyBramhacorp Limited · completion filed 30 Apr 2032
- Ayodhyaa Niwaas Checked 2/4Shubh Ganesh Developers · completion filed 31 Dec 2027
- BLUE BUSINESS BAY MahaRERA onlyBlue Construction Company · completion filed 30 Apr 2031
- BRAMHA SKYCITY PHASE 3 MahaRERA onlyBRAMHA MULTICON PVT LTD · completion filed 1 Aug 2027
- Bramhacorp Business Park T9-A1 MahaRERA onlyBramhacorp Limited · completion filed 30 Dec 2029
- Bramhacorp Business Park T9-A2 MahaRERA onlyBramhacorp Limited · completion filed 30 Apr 2030
- BramhaCorp Smart MahaRERA onlyBramhacorp Limited · completion filed 30 Dec 2026
- CHANDAN HEIGHTS MahaRERA onlyOM DEVELOPERS · completion filed 31 Dec 2025
- CLOVER GALLERIA Checked 2/4CLOVERBLAKEFIELD REALTY LLP · completion filed 15 Nov 2026
- DNK SQUARE MahaRERA onlyDNK REALTY · completion filed 30 Dec 2026
- Dynamic Grandstand II Phase I MahaRERA onlyDynamic Realty Creations · completion filed 31 Dec 2025
- EAGLE NEST MahaRERA onlyIlika Realtors · completion filed 30 Jun 2026
- East Street Kharadi MahaRERA onlyB.U.Bhandari M & M Realtors LLP · completion filed 30 Apr 2029
- Edition M Checked 2/4MANISHA ENTERPRISES · completion filed 30 Apr 2033
- Ekaanta Checked 2/4Prasun Associates · completion filed 31 Mar 2029
- Eon Water Front MahaRERA onlyPanchshil Realty and Developers Pvt Ltd · completion filed 30 Apr 2027
- Escala MahaRERA onlyRising Prime Developers LLP · completion filed 31 Mar 2026
- Estrella MahaRERA onlyCHANDREKAR HOUSING DEVELOPMENT LLP · completion filed 14 Oct 2027
- EVANA MahaRERA onlyROHAN KARAN INFRA · completion filed 15 Dec 2027
- EVOLVUS PHASE-I MahaRERA onlyTOWNSHINE REALTIES PRIVATE LIMITED · completion filed 30 Apr 2029
- EVOLVUS PHASE-II CheckedTOWNSHINE REALTIES PRIVATE LIMITED · completion filed 30 Apr 2029
- EVOLVUS PHASE-III MahaRERA onlyTOWNSHINE REALTIES PRIVATE LIMITED · completion filed 30 Apr 2030
- Forest Edge Phase 2 MahaRERA onlyAjanta Enterprises · completion filed 30 Dec 2025
- Gagan Avencia Phase II MahaRERA onlyOnyx Promoters LLP · completion filed 30 Apr 2031
- GALAXY PREMIERO Checked 2/4RAMDEO DEVELOPERS · completion filed 31 Dec 2031
- GANGA ALTUS KHARADI PUNE MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Dec 2028
- GANGA ALTUS WING F MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Jun 2028
- GANGA ARCADIA A BUILDING MahaRERA onlyGOEL GANGA INDIA PVT LTD · completion filed 30 Mar 2027
- GANGA AVANTA A1 MahaRERA onlySOHAM ASSOCIATES · completion filed 30 Apr 2028
- GANGA AVANTA A2 MahaRERA onlySOHAM ASSOCIATES · completion filed 31 Dec 2030
- GANGA PLATINUM A MahaRERA onlySHREE BALAJI ASSOCIATES PUNE LLP · completion filed 31 Oct 2026
- GANGA PLATINUM B MahaRERA onlySHREE BALAJI ASSOCIATES PUNE LLP · completion filed 30 Apr 2028
- GANGA SERIO G BUILDING MahaRERA onlyGOEL GANGA LANDMARKS LLP · completion filed 31 Dec 2025
- GATEWAY MahaRERA onlyRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · completion filed 30 Jun 2026
- Giga Platinum - Tower B MahaRERA onlyKOLTE-PATIL DEVELOPERS LIMITED · completion filed 31 Jul 2028
- Grant Bay MahaRERA onlyGagan Landmarks LLP · completion filed 29 Apr 2027
- Guruvista Phase II MahaRERA onlycompletion filed 30 Dec 2025
- HARMONY HEIGHTS Checked 2/4Bramhacorp Limited · completion filed 31 May 2027
- HEMANT MahaRERA onlySAI ASSOCIATES · completion filed 30 Apr 2028
- JAG RIVER VIEW MahaRERA onlyM/S JAG SPACES LLP · completion filed 30 Apr 2028
- JAG SOLITAIRE MahaRERA onlycompletion filed 30 Nov 2027
- KUMAR PALAASH A2 MahaRERA onlyKUMAR & POTNIS ASSOCIATES · completion filed 28 Feb 2029
- KUMAR PERIWINKLE-WING B3 MahaRERA onlyKUMAR & POTNIS ASSOCIATES · completion filed 30 Apr 2028
- KUMAR PRAJWAL MahaRERA onlyKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · completion filed 3 Jul 2026
- Leela by Empyrean Landmarks - Phase I MahaRERA onlycompletion filed 31 Dec 2027
- Leela by Empyrean Landmarks Ph2 MahaRERA onlycompletion filed 30 Apr 2029
- Lotus Court Phase -II MahaRERA onlyKRISHNA CONSTRUCTIONS · completion filed 30 Apr 2027
- MAITRI RESIDENCY MahaRERA onlyDHAMALE THORAT ASSOCIATES · completion filed 31 Dec 2025
- MAJESTIQUE MARBELLA PHASE 1 MahaRERA onlyMajestique Empire LLP · completion filed 30 Oct 2026
- MAJESTIQUE MARBELLA PHASE IV MahaRERA onlyMajestique Empire LLP · completion filed 31 Dec 2025
- MAJESTIQUE MARBELLA PHASE V MahaRERA onlyMajestique Empire LLP · completion filed 31 Dec 2026
- MAJESTIQUE MARBELLA PHASE VI MahaRERA onlyMajestique Empire LLP · completion filed 30 Aug 2027
- MANGAL VASTU Checked 2/4RUDVED BUILDTECH LLP · completion filed 31 Dec 2029
- Mantra Kharadi Phase 1 CheckedMANTRA LANDMARKS RESIDENCIES PRIVATE LIMITED · completion filed 30 Apr 2030
- MANTRA KHARADI PHASE 2 MahaRERA onlyMANTRA LANDMARKS RESIDENCIES PRIVATE LIMITED · completion filed 30 Apr 2030
- Mantra Kharadi Phase 3 MahaRERA onlyMANTRA LANDMARKS RESIDENCIES PRIVATE LIMITED · completion filed 30 Apr 2031
- Mantri Emporio MahaRERA onlySHORE DWELLINGS PRIVATE LIMITED · completion filed 31 Jul 2026
- Melody MahaRERA onlyLAVHE DEVELOPER AND BUILDERS · completion filed 15 Sep 2027
- Mithila Residency MahaRERA onlycompletion filed 31 Mar 2026
- Neco Park Central MahaRERA onlyVasupujya Realtor · completion filed 30 Oct 2030
- Nirman Elanza MahaRERA onlyNIRMAN DEVELOPERS · completion filed 30 Apr 2029
- NIRMITI 25 EAST MahaRERA onlyNIRMITI VASTU CREATION LLP · completion filed 28 Mar 2026
- NISHIGANDH 1 MahaRERA onlycompletion filed 30 Apr 2027
- NYATI EVOQUE Checked 2/4NYATI BUILDERS PRIVATE LIMITED · completion filed 30 Apr 2028
- OMICRON BUSINESS LANDMARKS MahaRERA onlycompletion filed 30 Apr 2029
- ONE SUITES MahaRERA onlycompletion filed 16 Dec 2028
- Onyx Business 57 Kharadi MahaRERA onlyONYX REALTY I · completion filed 30 Apr 2028
- Orville Business Port MahaRERA onlySiddhesh properties · completion filed 30 Apr 2027
- OXY BASTION MahaRERA onlycompletion filed 30 Oct 2028
- OXY BENICIO PHASE 1 MahaRERA onlycompletion filed 30 Jun 2027
- Palladio Kharadi Central Checkedcompletion filed 30 Oct 2027
- Palladio Kharadi Central Phase 2 Checkedcompletion filed 30 Apr 2029
- Palm Drive Checked 2/4completion filed 31 Dec 2029
- Panchshil Avenue MahaRERA onlyNew Level Business LLP · completion filed 30 Apr 2027
- PARK EDEN PHASE I MahaRERA onlyI Estates Infra LLP · completion filed 28 Feb 2031
- PAVILION 2 MahaRERA onlyKRISH DEVELOPERS · completion filed 31 Jul 2028
- PERCEPT BOUNTY 3 MahaRERA onlycompletion filed 15 Dec 2026
- Prasun Adara MahaRERA onlyPrasun Associates · completion filed 30 Sep 2028
- PRISTINE ALLURE PART 1 Checked 2/4completion filed 30 Apr 2028
- PRISTINE ALLURE PART 3 MahaRERA onlycompletion filed 30 Apr 2028
- PRISTINE ALLURE PART2 MahaRERA onlycompletion filed 30 Apr 2028
- Pristine Amore MahaRERA onlyPristine Landmark Spaces LLP · completion filed 30 Apr 2032
- Pristine KYRA MahaRERA onlyHighspot Realtors LLP · completion filed 31 Jul 2029
- Raichandani Aura MahaRERA onlyRaichandani Constructions Private Limited · completion filed 31 Dec 2028
- RIVERDALE AVENUE MahaRERA onlyDUVILLE ESTATES PRIVATE LIMITED · completion filed 15 Oct 2025
- RIVERDALE GRAND CheckedDUVILLE ESTATES PRIVATE LIMITED · completion filed 30 Jan 2029
- Riverdale Grove CheckedDuville Estates Private Limited · completion filed 30 Oct 2026
- RUDRAKSHUM RESIDENCY MahaRERA onlyRUDRAKSHUM CONSTRUCTIONS PRIVATE LIMITED · completion filed 31 Jul 2028
- SAI CRYSTAL COURT MahaRERA onlyImpact Builders and Developers · completion filed 30 Mar 2030
- SamarthNagar MahaRERA onlyArihant Associates · completion filed 30 Mar 2026
- SAMRUDDHI MahaRERA onlycompletion filed 30 Apr 2027
- SHANTI ANAND MahaRERA onlycompletion filed 31 Dec 2025
- SHANTISHIKHAR Checked 2/4SANKALP PLATINUM LLP · completion filed 31 Dec 2031
- SHIVTIRTH VILLA MahaRERA onlyUNITY REALTY GROUP · completion filed 31 Dec 2026
- Shrinivas Classic MahaRERA onlyShrinivas Developers · completion filed 31 Oct 2025
- SHUBH GANESH ORCHID MahaRERA onlycompletion filed 30 Apr 2028
- SHUBH SHAGUN MahaRERA onlyShubh Housing · completion filed 30 Apr 2027
- Shubh Tristar Wing-A MahaRERA onlyShubh Housing · completion filed 30 Apr 2028
- Shubh Tristar Wing-B MahaRERA onlyShubh Housing · completion filed 31 Dec 2028
- SIDDH KUBE MahaRERA onlycompletion filed 31 Dec 2028
- SKYGRAPH 2 MahaRERA onlySKYGRAPH EMERALD BUILDERS LLP · completion filed 30 Apr 2028
- Spandan MahaRERA onlyEvolve Infra · completion filed 16 Feb 2027
- Sun Emerald MahaRERA onlyJindal Mittal Graha Nirman Pvt. Ltd. · completion filed 31 Dec 2029
- Tech Tower MahaRERA onlyRaisoni Properties · completion filed 30 Apr 2029
- TEJOMAY ELITE MahaRERA onlyTEJOMAY REALTIES LLP · completion filed 30 Apr 2029
- The Collection - Commercial W1 MahaRERA onlyBramhacorp Limited · completion filed 30 Dec 2029
- The Collection - Residential W1 MahaRERA onlyBramhacorp Limited · completion filed 30 Dec 2029
- The Collection - Residential W8 MahaRERA onlyBramhacorp Limited · completion filed 30 Apr 2030
- The Collection - W2 and W7 CheckedBramhacorp Limited · completion filed 30 Jan 2027
- THE COLLECTION - W5 AND W6 Checked 2/4Bramhacorp Limited · completion filed 30 Apr 2030
- The Collection Premium Checked 3/4Bramhacorp Limited · completion filed 30 Apr 2027
- THE MONARCH Checked 2/4RUDRA DEVELOPERS · completion filed 31 Dec 2029
- The Strand Checked 2/4SSPL Landmarks LLP · completion filed 30 Jan 2028
- TITAN TOWER Checked 2/4completion filed 30 Apr 2028
- Tower of Ascend MahaRERA onlyVascon Engineers Ltd · completion filed 31 Jul 2028
- Tower of Visionaries MahaRERA onlyYucca Promoters LLP · completion filed 31 Jul 2028
- TRITON RESIDENCY MahaRERA onlyM/S SANKALP VASTU LLP · completion filed 30 Apr 2030
- Uday Heights MahaRERA onlySAIGURU DEVELOPERS (AOP) · completion filed 30 Jun 2026
- Unique Youtopia Phase I MahaRERA onlyUnique Associates · completion filed 31 Dec 2025
- Unique Youtopia Phase II MahaRERA onlyUnique Associates · completion filed 30 Jun 2026
- Unique Youtopia Phase III CheckedUnique Associates · completion filed 30 Jan 2027
- Unique Youtopia Phase IV MahaRERA onlyUnique Associates · completion filed 30 Apr 2029
- Vardhaman Riddhi MahaRERA onlyVardhaman Developers · completion filed 31 Jul 2027
- Venkatesh Landmark Mhada MahaRERA onlycompletion filed 31 Dec 2025
- VENKATESH VANAYA - WING – N (MHADA)- PHASE - 8 Checked 2/4SVBPL HOMES PVT LTD · completion filed 31 Aug 2030
- VENKATESH VANAYA-WING- G & H-PHASE-3 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 30 Oct 2031
- VENKATESH VANAYA-WING- I & J-PHASE -2 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 30 Apr 2031
- VENKATESH VANAYA-WING-A, B & C–PHASE-6 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 30 Jan 2033
- VENKATESH VANAYA-WING-D-PHASE -5 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 31 Dec 2030
- VENKATESH VANAYA-WING-K & L-PHASE -1 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 30 Sep 2030
- VENKATESH VANAYA-WING-M-PHASE-7 MahaRERA onlySVBPL HOMES PVT LTD · completion filed 30 Apr 2032
- VENUS ENCLAVE MahaRERA onlycompletion filed 31 Dec 2025
- VERTILLAS MahaRERA onlyAMI ESTATES LLP · completion filed 31 Mar 2026
- VETRO APARTMENTS PH I MahaRERA onlyAR LANDMARK LLP · completion filed 31 Mar 2028
- VISHAL LEELA RESIDENCY Checked 2/4completion filed 31 Dec 2027
- VISHALLEELA RESIDENCY MahaRERA onlyS.G.LANKE CONSTRUCTION CO · completion filed 31 Jul 2027
- VJ Central Avenue Checkedcompletion filed 30 Apr 2027
- VJ IndiLife Kharadi CheckedVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · completion filed 30 Apr 2029
- VJ IndiWorks Kharadi Central Checkedcompletion filed 30 Apr 2030
- WELL HOME RIVERSIDE MahaRERA onlycompletion filed 30 Apr 2029
- Yashwin Orizzonte Phase II CheckedVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · completion filed 31 Dec 2025
- ZEN ELITE CheckedRION BUILDTECH PRIVATE LIMITED · completion filed 31 Dec 2026
- Zen Kode MahaRERA onlyRion Buildtech Private Limited · completion filed 30 Apr 2028
- ZENITH MahaRERA onlyAMBAR ICON LLP · completion filed 31 Dec 2026
Finished more than a year ago (166)
- 10 BIZ PARK MahaRERA onlyDinesh Shroff and Choice Builders LLP · completion filed 29 Aug 2024
- 18 Nests MahaRERA onlyASR Constructions · completion filed 31 Dec 2024
- A3, Song of Joy, Geras Greensville2 MahaRERA onlyGera Developments Private Limited · completion filed 30 Jun 2019
- AARAMBH MahaRERA onlyCHANDHERE KARPE BUILDERS · completion filed 30 Jun 2019
- AKASA MahaRERA onlyGANDHI ASSOCIATES · completion filed 31 Jan 2021
- AKSHAY FLORA MahaRERA onlycompletion filed 30 Sep 2023
- ALCON RETHOS MahaRERA onlycompletion filed 31 Aug 2018
- ALCON RITAZZA MahaRERA onlycompletion filed 30 Dec 2021
- AMAR TECH CENTER MahaRERA onlyAMAR BUILDERS AND PROPERTIES LLP · completion filed 30 Mar 2025
- ANAND MALHAR MahaRERA onlySAKORE DEVELOPERS LLP · completion filed 30 Jun 2018
- ANAND SADHAN MahaRERA onlySAKORE DEVELOPERS LLP · completion filed 30 Dec 2019
- Anuraj Complex MahaRERA onlycompletion filed 30 Dec 2022
- AQUILA MahaRERA onlyPANDIT JAVDEKAR ASSOCIATES · completion filed 30 Dec 2023
- ARUNAREN RESIDENCY MahaRERA onlySHILPIPROPERTY DEVELOPERS(BOMBAY) PVT LTD · completion filed 31 Dec 2017
- Ashirwad The Living B Wing MahaRERA onlyAshirwad Associates · completion filed 31 Jul 2018
- ATHENA A BUILDING AND B BUILDING MahaRERA onlyM/S KARAN VENKATESHWARA ASSOCIATES · completion filed 30 Oct 2021
- B1 Song Of Joy Geras Greenville 2 MahaRERA onlyGera Developments Private Limited · completion filed 31 Dec 2019
- Belmac Residences A MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 30 Dec 2022
- Belmac Residences B MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 14 Jun 2025
- Belmac Residences C MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 15 Jun 2023
- Belmac Residences D MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 15 Dec 2019
- Belmac Residences E MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 14 Nov 2020
- Belmac Residences F MahaRERA onlySUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · completion filed 30 Apr 2023
- blueberry MahaRERA onlycompletion filed 14 Oct 2022
- BORA VILLE PHASE - II MahaRERA onlycompletion filed 31 Dec 2019
- BRAMHA SKYCITY MahaRERA onlyBRAMHA MULTICON PVT LTD · completion filed 30 Dec 2022
- Cheryl MahaRERA onlyKOLTE-PATIL REAL ESTATE PRIVATE LIMITED · completion filed 31 Aug 2018
- CITY VISTA MahaRERA onlyKOLTE-PATIL REAL ESTATE PRIVATE LIMITED · completion filed 31 Dec 2019
- DAMODAR HERITAGE MahaRERA onlycompletion filed 31 Dec 2018
- Dynamic Grandstand II MahaRERA onlyDynamic Realty Creations · completion filed 30 Dec 2023
- EASTWOODS MahaRERA onlyAnand Constructions · completion filed 30 Dec 2023
- ELITE ESTATE BUILDING B AND C PHASE I MahaRERA onlycompletion filed 28 Aug 2022
- Erande Hills MahaRERA onlySairam Associates · completion filed 30 Apr 2019
- Espree Eminence MahaRERA onlyEspree Realtors · completion filed 30 Dec 2022
- F RESIDENCES T5 T6 and T7 MahaRERA onlyBramhacorp Limited · completion filed 31 Dec 2019
- F Residences T8 MahaRERA onlyBramhacorp Limited · completion filed 30 Jun 2022
- FERRO GARDENS MahaRERA onlyFERRO ASSOCIATES · completion filed 31 Mar 2019
- FINSWELL MahaRERA onlyLMS REALTY · completion filed 31 Jul 2022
- FOREST COUNTY-PH 3 MahaRERA onlyAjanta Enterprises · completion filed 30 Dec 2023
- Forest Edge Phase 1 MahaRERA onlyAjanta Enterprises · completion filed 30 Dec 2023
- Fortune House MahaRERA onlycompletion filed 31 May 2018
- FORTUNE PLAZA PHASE II MahaRERA onlyVENKATESH LAXMI DEVELOPERS · completion filed 30 Jun 2022
- Gagan Avencia CheckedOnyx Promoters LLP · completion filed 30 Sep 2025
- GAGAN PANAMA PHASE 1 MahaRERA onlyGAGAN PANAMA BUILDSCAPES LLP · completion filed 28 Nov 2022
- GALAXY ONE MahaRERA onlyMODULAR CONSTRUCTIONS · completion filed 31 Dec 2017
- GANGA ANTRA MahaRERA onlyMEENAMANI APC CONSTRUCTION (I) LLP · completion filed 30 Jun 2025
- Ganga Capital Square MahaRERA onlySHREE BALAJI ASSOCIATES PUNE LLP · completion filed 30 Dec 2024
- Ganga Platino Building PQR MahaRERA onlycompletion filed 31 Dec 2018
- GANGA PLATINO BUILDING STUV MahaRERA onlycompletion filed 30 Dec 2024
- Ganga Platino Building V commercial MahaRERA onlycompletion filed 30 Dec 2023
- GANGA SERIO E F BUILDING MahaRERA onlyGOEL GANGA LANDMARKS LLP · completion filed 30 Dec 2024
- Geras Imperium Alpha MahaRERA onlyGera Developments Private Limited · completion filed 30 Jan 2023
- Giga Platinum MahaRERA onlyKOLTE-PATIL DEVELOPERS LIMITED · completion filed 31 Dec 2023
- GLOBAL LIFESTYLE KHARADI MahaRERA onlyMIND SPACE SHELTERS LLP · completion filed 30 May 2022
- GRACIOUS GARDEN MahaRERA onlyRohan Properties · completion filed 31 Mar 2025
- GULMOHAR BUSINESS BAY MahaRERA onlycompletion filed 30 Jun 2023
- GURUKRUPA ASTER MahaRERA onlyGURUKRUP DEVELOPERS · completion filed 30 Dec 2021
- HARMONY MahaRERA onlyBALAJI REALTY · completion filed 31 Jan 2021
- ICON 51 MahaRERA onlyS M SQUARE CONSTRO LLP · completion filed 30 Jun 2024
- KONARK ALPHA MahaRERA onlyTreon Developers LLP · completion filed 30 Dec 2023
- KRISH LANDMARK MahaRERA onlycompletion filed 31 Mar 2024
- KRUSHNA PARK C WING MahaRERA onlycompletion filed 22 Aug 2023
- KUMAR PALAASH A MahaRERA onlyKUMAR & POTNIS ASSOCIATES · completion filed 30 Jun 2024
- KUMAR PALAASH A1 MahaRERA onlyKUMAR & POTNIS ASSOCIATES · completion filed 31 Jul 2025
- KUMAR PALAASH B MahaRERA onlyKUMAR & POTNIS ASSOCIATES · completion filed 30 Jun 2024
- Kumar Primrose C Building MahaRERA onlyKUMAR PROPERTIES AND PROMOTERS PVT. LTD · completion filed 31 Dec 2022
- LAXMI NARAYAN MahaRERA onlySIDDHIVINAYAK DEVELOPERS · completion filed 31 Dec 2017
- LOTUS COURT MahaRERA onlyKRISHNA CONSTRUCTIONS · completion filed 30 Dec 2023
- M SQUARE DREAMLAND MahaRERA onlyM SQUARE PROPERTIES · completion filed 30 Dec 2021
- MAJESTIQUE MARBELLA PHASE II MahaRERA onlyMajestique Empire LLP · completion filed 30 Sep 2025
- MAJESTIQUE MARBELLA PHASE III MahaRERA onlyMajestique Empire LLP · completion filed 30 Sep 2025
- Mangalmurti Residency MahaRERA onlyKRISHNAPRAKASH ASSOCIATES · completion filed 30 Jun 2025
- Mantri Vantage MahaRERA onlySHORE DWELLINGS PRIVATE LIMITED · completion filed 29 Apr 2022
- MARVEL AQUANAS MahaRERA onlyMARVEL REALTORS AND DEVELOPERS LTD · completion filed 31 Mar 2024
- MARVEL CERISE BLDG B, C, D MahaRERA onlyMARVEL REALTORS AND DEVELOPERS LTD · completion filed 30 Sep 2019
- MARVEL CERISE Bldg-A MahaRERA onlyMARVEL REALTORS AND DEVELOPERS LTD · completion filed 31 Dec 2017
- MARVEL CITRINE A BUILDING MahaRERA onlyMARVEL REALTORS AND DEVELOPERS LTD · completion filed 31 Dec 2017
- MARVEL ZEPHYR BUILDING U MahaRERA onlyMARVEL LANDMARKS PVT LTD · completion filed 31 Jul 2018
- MK HOMES MahaRERA onlycompletion filed 1 Apr 2025
- Mount N Glory Plot A Phase II MahaRERA onlySancheti Associates Pvt. Ltd. · completion filed 31 Dec 2023
- MULIK LUXURIA B WING MahaRERA onlycompletion filed 31 Aug 2018
- NANDAN MahaRERA onlycompletion filed 31 Mar 2024
- NAVALAKHA RITZ MahaRERA onlyNAVALAKHA CHORADIYA ASSOCIATES · completion filed 31 Dec 2018
- Nikunj MahaRERA onlyVastushilp housing · completion filed 1 Jul 2018
- Nirman Altius Wing A MahaRERA onlyNIRMAN ASSOCIATES · completion filed 31 Dec 2018
- Nirman Altius Wing B MahaRERA onlyNIRMAN ASSOCIATES · completion filed 30 Dec 2023
- Nirman Altius Wing C MahaRERA onlyNIRMAN ASSOCIATES · completion filed 31 Dec 2018
- NIRVANA ZEN MahaRERA onlyNirvana Developers · completion filed 30 Dec 2019
- NYATI ELYSIA I MahaRERA onlycompletion filed 30 Mar 2022
- NYATI ELYSIA II MahaRERA onlycompletion filed 30 Mar 2023
- NYATI ELYSIA III MahaRERA onlycompletion filed 30 Mar 2023
- NYATI ELYSIA IV MahaRERA onlycompletion filed 30 Sep 2023
- NYATI ELYSIA V MahaRERA onlycompletion filed 30 Sep 2023
- NYATI EMPRESS MahaRERA onlyNYSHAA BUILDERS LLP · completion filed 30 Sep 2024
- NYATI ENCHANTE I MahaRERA onlyNYATI BUILDERS PRIVATE LIMITED · completion filed 30 Sep 2020
- NYATI ENCHANTE II MahaRERA onlyNYATI BUILDERS PRIVATE LIMITED · completion filed 30 Mar 2021
- NYATI ENCHANTE III MahaRERA onlyNYATI BUILDERS PRIVATE LIMITED · completion filed 30 Mar 2021
- Nyati Enthral I MahaRERA onlyNyati Landmark Projects LLP · completion filed 30 Jun 2024
- NYATI KALEIDOSCOPE I MahaRERA onlycompletion filed 31 Mar 2019
- NYATI KALEIDOSCOPE II MahaRERA onlycompletion filed 31 Mar 2019
- Nyati Plaza MahaRERA onlyNyati Landmark Projects LLP · completion filed 30 Nov 2024
- OM BHAGYASHREE CONSTRUCTION MahaRERA onlycompletion filed 10 Sep 2018
- Optimus MahaRERA onlySiddhesh properties · completion filed 31 Dec 2019
- PALM WORLD ONE MahaRERA onlyPALMTREE DEVELOPMENTS PVT. LTD. · completion filed 31 Jul 2022
- PERCEPT BOUNTY 4 MahaRERA onlycompletion filed 1 Jun 2025
- PITTIE KOURTYARD - D TOWER MahaRERA onlyRAJA BAHADUR INTERNATIONAL LTD. · completion filed 1 Apr 2023
- Platinum Square Phase 1 MahaRERA onlyVascon Engineers Ltd · completion filed 31 Dec 2017
- Platinum Square Phase 2 MahaRERA onlyVascon Engineers Ltd · completion filed 31 Dec 2019
- PLOT A BUILDING MahaRERA onlyDuville Estates Private Limited · completion filed 30 Mar 2022
- PMAY SCHEME SURVEY NO 57 HISSA NO 5 PART PLOT NO 1A OLD PLOT NO 1 KHARADI MahaRERA onlyPMAY CELL,PUNE MUNICIPAL CORPORATION · completion filed 30 Dec 2023
- PMAY SCHEME SURVEY NO 57 HISSA NO 5PART PLOT NO 1B OLD PLOT NO 1 KHARADI TAL HAVELI DIST PUNE MahaRERA onlyPMAY CELL,PUNE MUNICIPAL CORPORATION · completion filed 30 Dec 2023
- Pradnyaraj Buds MahaRERA onlyPradnyaraj Properties · completion filed 12 Aug 2024
- Pradnyaraj Lotus MahaRERA onlyPradnyaraj Properties · completion filed 30 Dec 2021
- PRASUN SARVAM MahaRERA onlyPrasun Associates · completion filed 30 Dec 2024
- Primavera - B6 and S1 MahaRERA onlyKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · completion filed 30 Jan 2024
- Prospero MahaRERA onlycompletion filed 30 Jun 2018
- RADHIKA PARK I MahaRERA onlyRADHIKA CONSTRUCTIONS · completion filed 31 Dec 2017
- RAJ CORNER MahaRERA onlycompletion filed 30 Jan 2023
- Raj Residency MahaRERA onlycompletion filed 30 Nov 2019
- Reverie Phase II MahaRERA onlycompletion filed 30 Nov 2018
- Riverdale Heights MahaRERA onlyDuville Estates Private Limited · completion filed 28 Feb 2022
- Riverdale Residences-I MahaRERA onlyDuville Estates Private Limited · completion filed 26 Feb 2024
- Riverdale Suites MahaRERA onlyDuville Estates Private Limited · completion filed 30 Nov 2024
- ROYAL RESIDENCY MahaRERA onlycompletion filed 30 Jun 2024
- ROYALE HOMES MahaRERA onlyGENIUS DEVELOPERS · completion filed 30 Jan 2022
- SAI ENCLAVE, Phase II Bldg A MahaRERA onlySSD BUILDERS · completion filed 1 Dec 2018
- Sai Sanskruti MahaRERA onlyHORIZON REALTY · completion filed 30 Jun 2024
- SAI SHRADDHA PARK PH II WING M N O P PROJECT MahaRERA onlycompletion filed 30 Dec 2023
- SAI SHRADDHA PARK WING B C D E F G H I J K L PROJECT MahaRERA onlySHIVAM DEVELOPERS · completion filed 30 Dec 2023
- SAI SNEH MahaRERA onlyAQUA SYSTEMS TECHNOLOGY LLP · completion filed 30 Sep 2023
- SAI SUNDARAM MahaRERA onlyGURUSAI DEVELOPERS · completion filed 31 Oct 2018
- SATYAM SERENITY - A MahaRERA onlycompletion filed 30 Jul 2024
- SBM MYRA MahaRERA onlySBM PROPERTIES · completion filed 31 Dec 2017
- SHAMBHAVI CLASSIC MahaRERA onlycompletion filed 30 Jun 2018
- SHAMBHAVI PRESTIGE MahaRERA onlycompletion filed 30 Jun 2024
- SHANTI SAMARTH MahaRERA onlySANKALP ASSOCIATES · completion filed 30 Sep 2023
- SHIV HILLS PHASE 2 MahaRERA onlyTRIMURTI DEVELOPERS · completion filed 30 Jun 2025
- SHRINIWAS LIVIANO PHASE I MahaRERA onlyGOEL GANGA LANDMARKS LLP · completion filed 30 Mar 2021
- SHRINIWAS Q HOMES MahaRERA onlyCUPID CONSTRUCTION LLP · completion filed 31 Mar 2019
- SHRIRAM PRIDE BUILDING MahaRERA onlycompletion filed 30 Dec 2021
- Shubh Aarambh MahaRERA onlySHUBH ASSOCIATES · completion filed 30 Mar 2024
- SHUBH GANESH ICON MahaRERA onlySHUBH GANESH ASSOCIATES · completion filed 31 Mar 2024
- SHUBH GLOBAL STREET WING A MahaRERA onlycompletion filed 30 Jun 2024
- SHUBH GLOBAL STREET WING B MahaRERA onlycompletion filed 30 Dec 2023
- SHUBH GLOBAL STREET WING C MahaRERA onlycompletion filed 30 Jun 2023
- SHUBH NILAYA MahaRERA onlySHUBH REALTORS · completion filed 30 Dec 2021
- SHUBH NILAYA PHASE II MahaRERA onlySHUBH REALTORS · completion filed 30 Dec 2023
- SIGNATURE BELITAS MahaRERA onlycompletion filed 31 Mar 2024
- SILICON BAY PHASE I MahaRERA onlycompletion filed 31 Dec 2019
- SILICON BAY PHASE II MahaRERA onlycompletion filed 31 Jan 2024
- SILICON BAY PHASE III MahaRERA onlycompletion filed 31 Jul 2024
- SOLITAIRE BUSINESS HUB KALYANINAGAR MahaRERA onlyCLASSIC PROMOTERS & BUILDERS PVT LTD · completion filed 29 Dec 2024
- SRRINIVAS SSKY MahaRERA onlycompletion filed 31 Dec 2017
- Swami Samartha Complex MahaRERA onlycompletion filed 30 Sep 2023
- SWAMIRAJ ERANDE COMPLEX MahaRERA onlySWAMIRAJ DEVELOPERS · completion filed 1 May 2019
- THE PLATINUM TOWERS MahaRERA onlyAVISHKAR ARISTA DEVELOPERS LLP · completion filed 19 Aug 2025
- TUSCAN ESTATE MahaRERA onlyTUSCAN REAL ESTATE PRIVATE LIMITED · completion filed 30 Jun 2018
- Tuscan Parkland MahaRERA onlyTUSCAN REAL ESTATE PRIVATE LIMITED · completion filed 30 Dec 2022
- VASTU VIRAM MahaRERA onlycompletion filed 31 Dec 2017
- Velstand Phase 2 - formerly Kul scapes MahaRERA onlycompletion filed 31 Dec 2023
- Viman Platinum MahaRERA onlyARK PREM CONSTRUCTIONS · completion filed 29 Dec 2024
- VJ 67 K Inclusive Housing MahaRERA onlyVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · completion filed 31 Dec 2023
- VTP ONE MahaRERA onlyVT Palresha & Co. Private Limited · completion filed 28 Feb 2022
- Xenia MahaRERA onlyKOLTE-PATIL REAL ESTATE PRIVATE LIMITED · completion filed 31 Dec 2018
- Yashwin Orizzonte - Phase I MahaRERA onlyVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · completion filed 30 Jun 2024
- ZEN ESTATE CheckedDESTINATION KHARADI DEVELOPERS LLP · completion filed 30 Sep 2025
From MahaRERA's public records, read on the date shown on each project's page. A project is listed under the area of the pincode it is filed under. This is general information, not investment or legal advice.