What stands out
As of 20 Nov 2026, from MahaRERA and the sources below.
- Across Pune, 9 of the 28 Goel Ganga projects with both dates on MahaRERA moved their completion dates by 3 months or more.
- With 1 building rising up to 13 floors, the mid-rise project stands higher than 22 of the 53 projects under construction in Kharadi.
- 2 BHK starts at 822 sq ft: Two-bedroom apartments begin at 822 sq ft carpet area for ₹95 L, while three-bedroom units start at 1152 sq ft for ₹1.29 Cr.
Updated 21 Nov 2026
Price
2 BHK
₹95.01 L – ₹1.4 Cr
from 822 sq ft · ₹11,558/sq ft
Last checked 20 Nov 2026
All-in cost of the 2 BHK at ₹95.01 L: about ₹1.07 Cr
Price (agreement value) ₹95.01 L GST (5%) ₹4.75 L Stamp duty (7%) ₹6.65 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.07 Cr 3 BHK
₹1.29 Cr – ₹1.85 Cr
from 1,152 sq ft · ₹11,198/sq ft
Last checked 20 Nov 2026
All-in cost of the 3 BHK at ₹1.29 Cr: about ₹1.45 Cr
Price (agreement value) ₹1.29 Cr GST (5%) ₹6.45 L Stamp duty (7%) ₹9.03 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.45 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹65,962 a monthOn a ₹76.01 L loan (80% of ₹95.01 L) at 8.5% for 20 years. Ask your bank for its rate.
Rough price guide for Goel Ganga Arcadia
- 1 BHK about ₹65 – 80 L
Our own rounded guide, checked against the area on 20 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.
What new homes in Kharadi usually ask
- 2 BHK about ₹80 L – ₹1.1 Cr (24 projects)
- 3 BHK about ₹1.3 – 1.9 Cr (20 projects)
- 3.5 BHK about ₹2.1 – 2.4 Cr (5 projects)
- 4 BHK about ₹2.4 – 3.5 Cr (6 projects)
- 4.5 BHK about ₹2.7 – 4 Cr (4 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Kharadi, rounded. Use it to judge an offer, not as a price.
Kharadi average ₹12,319/sq ft across 8 projectsThe middle asking price per sq ft of other projects in Kharadi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Goel Ganga Arcadia, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.
Nov 2022 Jan 2024 Mar 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Work hubs
- World Trade Center, Kharadi1.6 km
- EON IT Park, Kharadi1.8 km
- Magarpatta City3.1 km
- Pune Airport (Lohegaon)5.1 km
Nearby
- Railway stationHadapsar1.9 km
- Industrial areaEon IT Park Pune1.9 km
- ShoppingAmanora Mall2.6 km
- Industrial areaE Space Condominium - IT Park2.6 km
- ShoppingSeasons Mall2.7 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
MahaRERA record
From MahaRERA, read 20 Nov 2026Possession date
30 Jul 2027
Completion date filed with MahaRERA. At registration: 30 Jun 2026. Moved 9 months later, 4 of them by MahaRERA's August 2026 order for most projects.
Ask for the possession date in writing in your agreement for sale.
Goel Ganga Arcadia: what changed, as we read it
Completion date filed with MahaRERA
- 30 Mar 2027 → 30 Jul 2027, by MahaRERA's August 2026 order for most projects (not the builder); we saw it on 20 Nov 2026
Read by Avasetu from MahaRERA on each date shown. MahaRERA shows only the latest figures, so earlier ones are our own readings.
Beside other Kharadi projects
Worked out by Avasetu- Completion date
- Moved 9 months later
- 9 of 49 Kharadi projects being built moved theirs 3 months or more.
From MahaRERA records read 20 Nov 2026. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 121 of 135
- Towers
- 1 in this registration
- The tallest has 18 floors. 3 in the whole project.
- Units
- 135
- 119 homes, 16 shops or offices.
- Registered on
- 7 Aug 2020
- MahaRERA registration
- P52100025978
- Listed or updated on MahaRERA 31 Aug 2026.
- Promoter (builder)
- Goel Ganga India Pvt Ltd
- Project type
- Others
- Pincode
- 411014
Check before you book
From MahaRERA- The builder has moved the completion date 9 months later since registration, from Jun 2026 to Jul 2027 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
Tower by tower
1 building
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| GANGA ARCADIA A BUILDING | 18 | 119 | 16 |
As filed with MahaRERA (sanctioned floors).
Goel Ganga: track record
From MahaRERA recordsGoel Ganga has 28 projects in our MahaRERA register for Pune. 9 of 28 with both dates moved the completion date 3 months or more later, by 13 months on average.
- KAMAL C1 C2completion filed 31 Dec 2019
- GANGA ARIA B1 B2completion filed 30 Dec 2020, moved 12 months later
- SHRINIWAS LIVIANO PHASE Icompletion filed 30 Mar 2021, moved 6 months later
- GANGA BHAGYODAY D BLDG.completion filed 30 Jun 2021
- GANGA GLITZ F. BLDGcompletion filed 30 Dec 2021
- GANGA LEGEND COMMERCIALcompletion filed 30 Jun 2023
- GANGA ARIA Acompletion filed 30 Dec 2023
- GANGA LEGEND A4 AND B1..completion filed 30 Dec 2023
- GANGA LEGEND A2 AND B4completion filed 31 Dec 2023
- WAGHOLI PLOTTED DEVELOPMENTcompletion filed 30 Jun 2024
- GANGA GLITZ G UNDRI PUNEcompletion filed 30 Dec 2024
- GANGA LEGEND A3 AND B3..completion filed 30 Dec 2024
- GANGA SERIO E F BUILDINGcompletion filed 30 Dec 2024
- GANGA AASHRAYcompletion filed 31 Dec 2024
- GANGA LEGEND B2completion filed 30 Apr 2025, moved 4 months later
- GANGA DHAM TOWER B..completion filed 30 Apr 2026
- GANGA LEGEND BUILDING B6completion filed 31 Dec 2026
- GANGA UTOPIA COMMERCIALcompletion filed 30 Apr 2027, moved 24 months later
- GANGA UTOPIA E BUILDINGcompletion filed 30 Apr 2027, moved 24 months later
- GG TOWN WAGHOLI PUNEcompletion filed 30 Jun 2027
- GANGA DHAM TOWER C BIBVEWADI PUNEcompletion filed 30 Oct 2027, moved 12 months later
- GANGA ALTUS WING Fcompletion filed 30 Jun 2028
- GG TOWN WAGHOLI PHASE B BUILDING 8 AND 9completion filed 30 Jun 2028
- GANGA ALTUS KHARADI PUNEcompletion filed 30 Dec 2028
- Ganga Altus Building Gcompletion filed 30 Dec 2028
- Pune Baner Project-Tower 3completion filed 29 Oct 2030, moved 12 months later
- Pune Baner Project-Tower 4 and 5completion filed 29 Oct 2030, moved 12 months later
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Kharadi
- Vilas Javdekar 38K Inclusive Housingpossession Apr 2027
- A S Cornerpossession Jul 2027
- Kolte Patil Aleria - Block Bfrom ₹82.55 L · possession Jun 2027Starts ₹12 L lower than Goel Ganga Arcadia
- Panchshil Eon Water Front3, 4 BHK · from ₹3.5 Cr · possession Apr 2027Starts ₹2.55 Cr higher than Goel Ganga Arcadia
- Ganga Platinum3.5, 4.5 BHK · from ₹2.27 Cr · possession Feb 2027Starts ₹1.32 Cr higher than Goel Ganga Arcadia
- Grant Baypossession Apr 2027
More by Goel Ganga India Pvt Ltd
- Ganga Altus Kharadi Punepossession Dec 2028
- Ganga Altus Wing Fpossession Jun 2028
- Ganga Dhampossession Apr 2026
- Ganga Dham Tower C Bibvewadi Punepossession Oct 2027
- Ganga Legend Building B6possession Dec 2026
- Goel Ganga GG Town Wagholi Phase B Building 8 and 9possession Jun 2028
- Goel Ganga GG Town Wagholi Punepossession Jun 2027
- Ganga Bhagyoday D BLDG.possession Jun 2021
FAQ
What is the price of Goel Ganga Arcadia?
2 BHK: ₹95.01 L to ₹1.4 Cr; 3 BHK: ₹1.29 Cr to ₹1.85 Cr, checked on 20 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Goel Ganga Arcadia?
The completion date filed with MahaRERA is 30 Jul 2027. At registration it was 30 Jun 2026. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.
What is the MahaRERA number of Goel Ganga Arcadia?
Goel Ganga Arcadia is registered with MahaRERA as P52100025978.
How many towers and floors does Goel Ganga Arcadia have?
MahaRERA lists 1 building, the tallest with 18 floors.
How many flats are there in Goel Ganga Arcadia?
MahaRERA lists 135 units (119 residential, 16 other).
How many homes in Goel Ganga Arcadia are booked?
121 of 135 homes were booked as per MahaRERA on 20 Nov 2026.
Who is the builder of Goel Ganga Arcadia?
The promoter registered with MahaRERA is Goel Ganga India Pvt Ltd. Our register has 28 Pune projects by Goel Ganga; 9 of 28 with both dates moved their completion date 3 months or more later.
Where is Goel Ganga Arcadia?
Goel Ganga Arcadia is in Kharadi, Pune (pincode 411014).
Which railway station is nearest to Goel Ganga Arcadia?
Hadapsar, about 1.9 km away in a straight line from the map position; the drive is longer.
How far is Goel Ganga Arcadia from Pune Airport?
About 5.1 km in a straight line from the map position; the drive is longer.
How far is Goel Ganga Arcadia from World Trade Center, Kharadi?
About 1.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Goel Ganga Arcadia.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 31 Aug 2026
- Dates and homes bookedFrom MahaRERA
Checked 20 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 20 Nov 2026
- Location and nearbyGathered and checked
Checked 20 Nov 2026
- DescriptionGathered and checked
Checked 5 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (20 Nov 2026)
- Rough price guideGathered and checked
An asking price seen on one site, rounded and checked against the area (20 Nov 2026)
Get the price sheet and floor plans for GANGA ARCADIA A BUILDING
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.