Skip to main contentSkip to navigation
947d3ee0 a517 4d50 a610 ec8c7c43228cGodrej Properties logo
The builder's picture
MahaRERA registered P52100026875Verify on MahaRERA (opens in a new tab)Completion date passed

Godrej Green Cove, Baner

Sold as Mahalunge by 7 property sites; we list it under Baner (pincode 411045).

See the site from above today

by Godrej Properties · Baner, Mulshi, Pune district · 411045

Homes
2, 3 BHK
Price
from ₹71 L
EMI about ₹49,292 a month
Possession
Oct 2026
completion filed with MahaRERA
Booked
727 of 741

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 98% of homes booked: Buyers have reserved 729 of the 741 homes, which is higher than similar projects in Baner that are at about 88%.
  • Bigger than 179 of 182 projects: With 741 homes in this phase, it holds more units than almost all other ongoing developments in Baner.
  • The builder originally filed for completion by 30 Mar 2025, but the updated date on MahaRERA is 30 Oct 2026. Across Pune, 16 of 39 Godrej Properties developments with both records shifted their completion dates by 3 months or more.

Updated 21 Nov 2026

Pictures

6a175855 43f5 4d74 a9dc 6dfb2c062aa9
20a1cfef e6c3 463a 9cca 537d3b680ce0
05010f18 6b24 4c45 a0d9 5d5c7011696f
7776839c c011 4f35 2ba85e94deb5
bbd5df49 affe 43ba befb 2fb5ce65be8b
dw Godrej GreenCove Pune Amenities01 1166X550acc3c2ff c079 a321 5bef35d9d173
dw Godrej GreenCove Pune Amenities02 1166X550b10fb8a7 8f35 4ec7 ad92 0f9f7e9e14c4

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • 2 BHK

    From ₹71 L

    Last checked 4 Nov 2026

    All-in cost of the 2 BHK at ₹71 L: about ₹76.27 L + GST if any
    Price (agreement value)₹71 L
    GSTAsk
    Stamp duty (7%)₹4.97 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹76.27 L
  • 3 BHK

    From ₹81.5 L

    Last checked 4 Nov 2026

    All-in cost of the 3 BHK at ₹81.5 L: about ₹87.5 L + GST if any
    Price (agreement value)₹81.5 L
    GSTAsk
    Stamp duty (7%)₹5.71 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹87.5 L

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹49,292 a monthOn a ₹56.8 L loan (80% of ₹71 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Baner usually ask

  • 2 BHK about ₹90 L – ₹1.3 Cr (31 projects)
  • 3 BHK about ₹1.5 – 2.1 Cr (42 projects)
  • 4 BHK about ₹2.5 – 3.5 Cr (25 projects)
  • 4.5 BHK about ₹3 – 4.75 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Baner, rounded. Use it to judge an offer, not as a price.

Baner average ₹14,176/sq ft across 24 projectsThe middle asking price per sq ft of other projects in Baner.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Godrej Green Cove from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Godrej Green Cove, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Godrej Green Cove from above, satellite picture of Nov 2022
    Nov 2022
  2. Godrej Green Cove from above, satellite picture of Jan 2024
    Jan 2024
  3. Godrej Green Cove from above, satellite picture of Feb 2025
    Feb 2025
  4. Godrej Green Cove from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Final views show established towers and surrounding development matching registration plans.

Registered with MahaRERA Nov 2020 · possession filed for Oct 2026

Season by season, Jan 2021 to Oct 2026: 18 seasons, October to May (the monsoon is under cloud).

The ground around the project's map pin, seen by the Sentinel-2 satellite once each dry season from Jan 2021 to Oct 2026.

The seasons before

  1. Oct–Dec 2025Surrounding area densifies with roads and adjacent phase structures taking shape.
  2. Jan–Mar 2025Winter shadows highlight advanced building heights and structural presence.
  3. Oct–Dec 2024Core structures cast distinct shadows, reflecting ongoing development in the area.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (10 earlier seasons)
  1. Apr–May 2024Little change as construction activity continues around established building footprints.
  2. Oct–Dec 2023Building structures cast prominent shadows, indicating vertical growth inside the ring.
  3. Apr–May 2023Construction footprints expand slightly with ongoing groundwork across the site.
  4. Jan–Mar 2023Tall building shadows lengthen northwest, showing active construction within the ring.
  5. Oct–Dec 2022New building foundations and footprints take shape following the Nov 2020 registration.
  6. Apr–May 2022Excavation and earth movement visible within the ring with surrounding ground cleared.
  7. Jan–Mar 2022Dark shadows from emerging tall buildings appear inside and near the ring.
  8. Oct–Dec 2021Ground clearing continues with minor earthworks visible inside the ring.
  9. Apr–May 2021Ground remains cleared and largely unchanged as dry summer conditions persist.
  10. Jan–Mar 2021Bare ground with small structures inside the ring, showing little change from before.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)2.8 km
  • Baner-Balewadi High Street4.1 km
  • Pune Railway Station15.2 km
  • Pune Airport (Lohegaon)18.3 km

Nearby

  • Industrial areaRadius Tech Park1.7 km
  • ShoppingStreets of Europe2.1 km
  • Industrial areaSoftware Technology Parks of India2.6 km
  • HospitalSymbiosis University Hospital & Research Centre3.2 km
  • ShoppingGrand Highstreet3.3 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

30 Oct 2026

Completion date filed with MahaRERA. At registration: 30 Mar 2025. Moved 15 months later, 4 of them by MahaRERA's August 2026 order for most projects.

The filed completion date has passed. Ask for the occupancy certificate (OC) before you book.

Ask for the possession date in writing in your agreement for sale.

Beside other Baner projects

Worked out by Avasetu
Homes booked
98%
The middle of 10 Baner projects registered within a year of it: 86%.
Completion date
Moved 15 months later
42 of 190 Baner projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
727 of 741
Towers
6 in this registration
The tallest has 23 floors.
Units
741
712 homes, 29 shops or offices.
Registered on
3 Nov 2020
MahaRERA registration
P52100026875
Listed or updated on MahaRERA 13 Feb 2026.
Promoter (builder)
Mahalunge Township Developers Private Limited
Project type
Others
Pincode
411045

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • The completion date filed with MahaRERA (Oct 2026) has passed. Ask for the occupancy certificate (OC) before you pay anything more.
  • The builder has moved the completion date 15 months later since registration, from Mar 2025 to Oct 2026 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
  • 29 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

6 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower 22317410
Tower 3231820
Tower 4231820
Tower 12317410
MLCP Tower408
Retail Tower201

As filed with MahaRERA (sanctioned floors).

Godrej Properties: track record

From MahaRERA records

Godrej Properties has 39 projects in our MahaRERA register for Pune. 16 of 39 with both dates moved the completion date 3 months or more later, by 21 months on average.

All 39 projects by Godrej Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Baner

More by Mahalunge Township Developers Private Limited

FAQ

What is the price of Godrej Green Cove?

2 BHK: ₹71 L; 3 BHK: ₹81.5 L, checked on 4 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Godrej Green Cove?

The completion date filed with MahaRERA is 30 Oct 2026. At registration it was 30 Mar 2025. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.

What is the MahaRERA number of Godrej Green Cove?

Godrej Green Cove is registered with MahaRERA as P52100026875.

How many towers and floors does Godrej Green Cove have?

MahaRERA lists 6 buildings, the tallest with 23 floors.

How many flats are there in Godrej Green Cove?

MahaRERA lists 741 units (712 residential, 29 other).

How many homes in Godrej Green Cove are booked?

727 of 741 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Godrej Green Cove?

The promoter registered with MahaRERA is Mahalunge Township Developers Private Limited. Our register has 39 Pune projects by Godrej Properties; 16 of 39 with both dates moved their completion date 3 months or more later.

Where is Godrej Green Cove?

Godrej Green Cove is in Mulshi, Pune district (pincode 411045).

Has the completion date of Godrej Green Cove passed?

Yes. Ask the builder for the occupancy certificate (OC) before you book.

Which hospital is nearest to Godrej Green Cove?

Symbiosis University Hospital & Research Centre, about 3.2 km away in a straight line from the map position; the drive is longer.

How far is Godrej Green Cove from Pune Airport?

About 18.3 km in a straight line from the map position; the drive is longer.

How far is Godrej Green Cove from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 2.8 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Godrej Green Cove.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 13 Feb 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (4 Nov 2026)

Get the price sheet and floor plans for Godrej Green Cove

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment