Skip to main contentSkip to navigation
dw godrej urbanretreat pune slider image x900 9116784a b4Godrej Properties logo
The builder's picture
MahaRERA registered P52100050128Verify on MahaRERA (opens in a new tab)Near completion

Godrej Urban Retreat, Manjari

Sold as Kharadi by 6 property sites; we list it under Manjari (pincode 412307).

See the site from above today

by Godrej Properties · Manjari, Haveli, Pune district · 412307

Possession
Oct 2027
completion filed with MahaRERA
Booked
631 of 698

What stands out

As of 12 Nov 2026, from MahaRERA and the sources below.

  • 89% of homes booked: MahaRERA shows 624 of 698 homes booked.
  • Buildings in this registration: 3, up to 33 floors.
  • 89% booked here; the middle of 10 Manjari projects registered within a year of it is 60%.
  • Compared with other projects still being built in Manjari: Compared with other projects still being built in Manjari: its tallest building is higher than that of 9 of 13.
  • Completion date filed with MahaRERA: 11 Oct 2027.

Updated 21 Nov 2026

Pictures

dw godrej urbanretreat pune slider image x900 7c982f0d f0a6 a7
dw Godrej Urbanretreat Pune Amenities04 1166X5508512c308 69a2 484e a87d 8a896e3e99ea
godrej urbanretreat pune gallery02 x750 06d162ab 9c87 467f ae29
godrej urbanretreat pune gallery09 x750 16d8ed92 46db 9e4a fdfc8c
exteriorAV20e02e55 c9e9 4d78 a307 686bca5b3f20
InteriorAV855a5d42 a33e 8d50 a3a2125e8b11
townshipAV361b4240 f381 45fb a102 84183dc67d76

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

No price for Godrej Urban Retreat is published yet.

What new homes in Manjari usually ask

  • 2 BHK about ₹65 – 80 L (7 projects)
  • 3 BHK about ₹90 L – ₹1.2 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Manjari, rounded. Use it to judge an offer, not as a price.

Manjari average ₹9,668/sq ft across 3 projectsThe middle asking price per sq ft of other projects in Manjari.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Godrej Urban Retreat from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Godrej Urban Retreat, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Jan 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Godrej Urban Retreat from above, satellite picture of Nov 2022
    Nov 2022
  2. Godrej Urban Retreat from above, satellite picture of Jan 2024
    Jan 2024
  3. Godrej Urban Retreat from above, satellite picture of Jan 2025
    Jan 2025
  4. Godrej Urban Retreat from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Little change, established building footprints and shadows visible.

possession filed for Oct 2027

Month by month, Jan 2021 to Nov 2026: 42 clear months, October to May (the monsoon is under cloud).

Godrej Urban Retreat in Kharadi shows vacant land until early 2023 when groundwork begins following its March 2023 registration, followed by the emergence of tall building structures and dark shadows by 2024 to 2026.

The seasons before

  1. Apr–May 2026Little change, structures remain clearly visible.
  2. Jan–Mar 2026Long winter shadows confirm tall building frames within the ring.
  3. Oct–Dec 2025Pronounced shadows indicate substantial vertical structures inside the ring.
Construction proof from space: Jan 2021 to Nov 2026, Copernicus Sentinel-2 (13 earlier seasons)
  1. Apr–May 2025Little change, clear outlines of structures within the ring.
  2. Jan–Mar 2025Tall building shadows cast northwest, showing vertical structure growth.
  3. Oct–Dec 2024Structures become more pronounced with surrounding ground work.
  4. Apr–May 2024Little change, structures and bright material visible inside the ring.
  5. Jan–Mar 2024Building structures and shadows emerge following the 2023 registration.
  6. Oct–Dec 2023New foundation footprints and early groundwork visible inside the ring.
  7. Apr–May 2023Dry conditions with bare soil inside the ring.
  8. Jan–Mar 2023Ground clearing visible, preparing for registration after March 2023.
  9. Oct–Dec 2022Vegetation persists around the ring with bare ground at the center.
  10. Jan–Mar 2022Plant cover increases slightly within the yellow ring area.
  11. Oct–Dec 2021Green vegetation appears inside the ring after monsoon.
  12. Apr–May 2021Little change, dry soil visible inside the ring.
  13. Jan–Mar 2021Ground is cleared with sparse plants inside the yellow ring.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi3.5 km
  • World Trade Center, Kharadi3.6 km
  • Magarpatta City6 km
  • Pune Airport (Lohegaon)8.7 km

Nearby

  • SchoolThe Orbis School, Keshav Nagar, Pune (CBSE)3.1 km
  • Railway stationManjari Budruk3.1 km
  • Industrial areaEon IT Park 23.1 km
  • Industrial areaEon IT Park Pune3.2 km
  • TempleRenuka Mata Mandir3.5 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 12 Nov 2026

Possession date

11 Oct 2027

Completion date filed with MahaRERA. Not moved since registration.

Beside other Manjari projects

Worked out by Avasetu
Homes booked
90%
The middle of 9 Manjari projects registered within a year of it: 72%.
Completion date
Not moved by the builder
12 of 36 Manjari projects being built moved theirs 3 months or more.

From MahaRERA records read 12 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
631 of 698
Towers
3 in this registration
The tallest has 33 floors.
Registered on
20 Mar 2023
MahaRERA registration
P52100050128
Listed or updated on MahaRERA 9 May 2026.
Promoter (builder)
Manjari Housing Projects LLP
Project type
Residential / Group Housing
Pincode
412307

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 33 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower 3332530
Tower 4332550
Tower 5331900

As filed with MahaRERA (sanctioned floors).

Godrej Properties: track record

From MahaRERA records

Godrej Properties has 39 projects in our MahaRERA register for Pune. 16 of 39 with both dates moved the completion date 3 months or more later, by 21 months on average.

All 39 projects by Godrej Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Manjari

More by Manjari Housing Projects LLP

FAQ

What is the price of Godrej Urban Retreat?

No price for Godrej Urban Retreat is published yet. Ask through the enquiry form on this page for the current price.

What is the possession date of Godrej Urban Retreat?

The completion date filed with MahaRERA is 11 Oct 2027.

What is the MahaRERA number of Godrej Urban Retreat?

Godrej Urban Retreat is registered with MahaRERA as P52100050128.

How many towers and floors does Godrej Urban Retreat have?

MahaRERA lists 3 buildings, the tallest with 33 floors.

How many flats are there in Godrej Urban Retreat?

MahaRERA lists 698 units.

How many homes in Godrej Urban Retreat are booked?

631 of 698 homes were booked as per MahaRERA on 12 Nov 2026.

Who is the builder of Godrej Urban Retreat?

The promoter registered with MahaRERA is Manjari Housing Projects LLP. Our register has 39 Pune projects by Godrej Properties; 16 of 39 with both dates moved their completion date 3 months or more later.

Where is Godrej Urban Retreat?

Godrej Urban Retreat is in Haveli, Pune district (pincode 412307).

Which school is nearest to Godrej Urban Retreat?

The Orbis School, Keshav Nagar, Pune (CBSE), about 3.1 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Godrej Urban Retreat?

Manjari Budruk, about 3.1 km away in a straight line from the map position; the drive is longer.

How far is Godrej Urban Retreat from Pune Airport?

About 8.7 km in a straight line from the map position; the drive is longer.

How far is Godrej Urban Retreat from EON IT Park, Kharadi?

About 3.5 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Godrej Urban Retreat.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 9 May 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 10 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 10 Nov 2026

  • Location and nearbyGathered and checked

    Checked 10 Nov 2026

  • DescriptionGathered and checked

    Checked 10 Nov 2026

Get the price sheet and floor plans for Godrej Urban Retreat

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment