Skip to main contentSkip to navigation
dw godrej river royale pune slider image x900 6112e75b 243b 49b3Godrej Properties logo
The builder's picture
MahaRERA registered P52100052957Verify on MahaRERA (opens in a new tab)Mid stage

Godrej River Royale, Baner

Sold as Mahalunge by 5 property sites; we list it under Baner (pincode 411045).

See the site from above today

by Godrej Properties · Baner, Mulshi, Pune district · 411045

Price
from ₹1.5 Cr
EMI about ₹1.04 L a month
Possession
Jul 2029
completion filed with MahaRERA
Booked
118 of 370

Avasetu's read (from MahaRERA data, 13 Oct 2026)

Sales are slow, with 118 of 370 homes booked at 32%, compared to about 53% across 56 similar Baner projects. The builder's timeline record is mixed, as 16 of 39 Godrej Properties projects in Pune moved completion dates by 3 months or more. You should ask about progress toward the MahaRERA completion date of 31 Jul 2029.

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • This registration has more homes than 157 of 172 other projects still being built in Baner, with 370 homes in this registration.
  • Similar projects are at about 50%, this project is 32% booked, with 118 of 370 homes booked.

Updated 21 Nov 2026

Pictures

dw godrej river royale pune overview image x810 480f3c14 f1b5 486c a67
dw godrej river royale pune slider image x900 85aa4b52 4dfd 8c
dw godrej river royale pune slider image x900 fcc0acd7 f0dc 429d a8
dw godrej river royale pune slider image x900 c553 41b7 b7
godrej river royale pune gallery x750 e2b1a87c 9bce 44d2 a37c 2ef94

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • Homes

    ₹1.5 Cr – ₹1.75 Cr

    Last checked 13 Nov 2026

    All-in cost of a home at ₹1.5 Cr: about ₹1.68 Cr
    Price (agreement value)₹1.5 Cr
    GST (5%)₹7.5 L
    Stamp duty (7%)₹10.5 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.68 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹1.04 L a monthOn a ₹1.2 Cr loan (80% of ₹1.5 Cr) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Baner usually ask

  • 2 BHK about ₹90 L – ₹1.3 Cr (32 projects)
  • 3 BHK about ₹1.4 – 2.1 Cr (43 projects)
  • 4 BHK about ₹2.5 – 3.5 Cr (25 projects)
  • 4.5 BHK about ₹3 – 4.75 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Baner, rounded. Use it to judge an offer, not as a price.

Baner average ₹14,176/sq ft across 24 projectsThe middle asking price per sq ft of other projects in Baner.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Godrej River Royale from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Godrej River Royale, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Godrej River Royale from above, satellite picture of Nov 2022
    Nov 2022
  2. Godrej River Royale from above, satellite picture of Jan 2024
    Jan 2024
  3. Godrej River Royale from above, satellite picture of Feb 2025
    Feb 2025
  4. Godrej River Royale from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Jan–Mar 2024 (looked Nov 2026)

Dark shadows of tall buildings appear inside the ring.

Registered with MahaRERA Oct 2023 · possession filed for Jul 2029

Season by season, Jan 2022 to Oct 2026: 15 seasons, October to May (the monsoon is under cloud).

Satellite pictures show ground clearing and subsequent dark shadows of tall building construction starting after the October 2023 registration, tracking the three registered towers.

The seasons before

  1. Oct–Dec 2023Ground cleared near the ring after October 2023 registration.
Construction proof from space: Jan 2022 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2022-2026.

Open the full timelineMore Pune projects from space

Floor plans

See the 2 floor plans

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)2.4 km
  • Baner-Balewadi High Street4 km
  • Pune Railway Station15.3 km
  • Pune Airport (Lohegaon)18.2 km

Nearby

  • Industrial areaRadius Tech Park1.2 km
  • ShoppingStreets of Europe1.7 km
  • Industrial areaSoftware Technology Parks of India2.2 km
  • ShoppingGrand Highstreet2.9 km
  • HospitalManipal Hospitals Baner3.5 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Project facts

  • 3 towers.

Amenities

  • 31,000 sqft.
  • Visitor Parking.

Last checked 13 Nov 2026.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

31 Jul 2029

The completion date filed with MahaRERA is 31 Jul 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Mar 2029.

Beside other Baner projects

Worked out by Avasetu
Homes booked
32%
The middle of 52 Baner projects registered within a year of it: 50%.
Completion date
Not moved by the builder
42 of 188 Baner projects being built moved theirs 3 months or more.

From MahaRERA records read 13 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
118 of 370
Towers
3 in this registration
The tallest has 41 floors.
Registered on
6 Oct 2023
MahaRERA registration
P52100052957
Listed or updated on MahaRERA 17 Apr 2025.
Promoter (builder)
Mahalunge Township Developers Private Limited
Project type
Residential / Group Housing
Pincode
411045

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 41 floors. Ask how many lifts serve your tower and how many homes share them.

Tower by tower

3 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER 141740
TOWER 2411480
TOWER 3411480

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Floors per tower (highest)
up to 38 floors
Land
4.37 acres
Clubhouse
31,000 sq ft

Last checked 13 Nov 2026. MahaRERA counts where they differ.

Godrej Properties: track record

From MahaRERA records

Godrej Properties has 39 projects in our MahaRERA register for Pune. 16 of 39 with both dates moved the completion date 3 months or more later, by 21 months on average.

All 39 projects by Godrej Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Baner

More by Mahalunge Township Developers Private Limited

FAQ

What is the price of Godrej River Royale?

Homes from ₹1.5 Cr to ₹1.75 Cr, checked on 13 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Godrej River Royale?

The completion date filed with MahaRERA is 31 Jul 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Godrej River Royale?

Godrej River Royale is registered with MahaRERA as P52100052957.

How many towers and floors does Godrej River Royale have?

MahaRERA lists 3 buildings, the tallest with 41 floors.

How many flats are there in Godrej River Royale?

MahaRERA lists 370 units.

How many homes in Godrej River Royale are booked?

118 of 370 homes were booked as per MahaRERA on 13 Nov 2026.

Who is the builder of Godrej River Royale?

The promoter registered with MahaRERA is Mahalunge Township Developers Private Limited. Our register has 39 Pune projects by Godrej Properties; 16 of 39 with both dates moved their completion date 3 months or more later.

Where is Godrej River Royale?

Godrej River Royale is in 411045, Mulshi, Pune district (pincode 411045).

Which hospital is nearest to Godrej River Royale?

Manipal Hospitals Baner, about 3.5 km away in a straight line from the map position; the drive is longer.

How far is Godrej River Royale from Pune Airport?

About 18.2 km in a straight line from the map position; the drive is longer.

How far is Godrej River Royale from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 2.4 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Godrej River Royale.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 17 Apr 2025

  • Dates and homes bookedFrom MahaRERA

    Checked 13 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 13 Nov 2026

  • DescriptionGathered and checked

    Checked 13 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (13 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (13 Nov 2026)

Get the price sheet and floor plans for Godrej River Royale

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment