Skip to main contentSkip to navigation
Godrej Skyline, from the builder's websiteGodrej Properties logo
The builder's picture
MahaRERA registered PM1260002400007Verify on MahaRERA (opens in a new tab)Mid stage

Godrej Skyline, Mundhwa

See the site from above today

by Godrej Properties · Mundhwa, Pune City, Pune district · 411036

Homes
3 BHK
Price
from ₹3.59 Cr
EMI about ₹2.49 L a month
Possession
Nov 2029
completion filed with MahaRERA
Booked
162 of 334

Avasetu's read (from MahaRERA data, 11 Nov 2026)

49% of the 334 homes are booked, which is higher than the roughly 35% typical for 30 similar Mundhwa projects, so sales are ahead of peers. The builder has moved the completion date three months or more in 16 of 39 Pune projects, indicating a spotty record. Ask the builder if the 30 Nov 2029 filing is still firm.

What stands out

As of 11 Nov 2026, from MahaRERA and the sources below.

  • With 334 homes in this registration, the development has more units than 76 of 79 ongoing projects in Mundhwa.
  • 43% of homes booked: Buyers have secured 142 of the 334 homes. This puts sales ahead of local peers, where similar projects are at about 32%.
  • The original finish date was 31 Jul 2029, and a MahaRERA order added 4 months to establish the current 30 Nov 2029 target.

Updated 21 Nov 2026

Pictures

Godrej Skyline, from the builder's website
6885bcfd be16 43cd 8dc9 8d0c28919f8a
4dcd 8d53 b7402fd57b9e
35eed802 78e2 464e 8b19 835c074dd523
8f528b16 f163 8f18 6e0348c73f69
Godrej Skyline, from the builder's website
Godrej Skyline, from the builder's website

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • 3 BHK

    ₹3.59 Cr – ₹4.3 Cr

    from 1,586 sq ft · ₹22,636/sq ft

    As listed on the builder's site, 14 Nov 2026

    All-in cost of the 3 BHK at ₹3.59 Cr: about ₹4.02 Cr
    Price (agreement value)₹3.59 Cr
    GST (5%)₹17.95 L
    Stamp duty (7%)₹25.13 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹4.02 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹2.49 L a monthOn a ₹2.87 Cr loan (80% of ₹3.59 Cr) at 8.5% for 20 years. Ask your bank for its rate.

Rough price guide for Godrej Skyline

  • 4.5 BHK about ₹4.5 – 6.5 Cr

Our own rounded guide, checked against the area on 14 Nov 2026. It is not a quote: the exact price is on the builder's price sheet.

What new homes in Mundhwa usually ask

  • 2 BHK about ₹80 L – ₹1.2 Cr (7 projects)
  • 3 BHK about ₹1.2 – 1.9 Cr (8 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Mundhwa, rounded. Use it to judge an offer, not as a price.

Mundhwa average ₹12,996/sq ft across 4 projectsThe middle asking price per sq ft of other projects in Mundhwa.

Get the exact price for your home

The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.

Ask for the current offer

Godrej Skyline from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Godrej Skyline, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Mar 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.5 m a pixel.

  1. Godrej Skyline from above, satellite picture of Nov 2022
    Nov 2022
  2. Godrej Skyline from above, satellite picture of Jan 2024
    Jan 2024
  3. Godrej Skyline from above, satellite picture of Mar 2025
    Mar 2025
  4. Godrej Skyline from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Satellite imagery from 2021 through 2026 shows minimal visual changes within and around the yellow ring, maintaining largely consistent vegetation and ground features with no major construction footprints visible relative to the September 2024 registration.

Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Magarpatta City2.2 km
  • World Trade Center, Kharadi4.2 km
  • Pune Railway Station4.3 km
  • EON IT Park, Kharadi4.4 km

Nearby

  • ShoppingKOPA Mall1.1 km
  • Railway stationHadapsar1.4 km
  • SchoolArmy Public School2.3 km
  • ShoppingSeasons Mall2.3 km
  • SchoolThe Bishop's Co-Ed School2.5 km

Straight-line distances; the drive is longer. Places: Google Maps.

Around Godrej Skyline

Measured from the project's pin, each with its source and date.

ToBy road9 am6 pm, back
World Trade Center, Kharadi4.4 km11-19 min14-25 min
Magarpatta Cybercity3.9 km11-20 min11-20 min
EON IT Park, Kharadi4.9 km12-21 min15-25 min
Kalyani Nagar offices (Cerebrum IT Park)4.9 km18-37 min20-39 min
Pune Airport (Lohegaon)15.2 km41 min41 min

Driving from the project's pin on a weekday, Google's typical traffic. Source: Google Maps (Routes API), typical weekday traffic · measured 28 Nov 2026

What's changing nearby

  • Keshavnagar-Kharadi bridgeBuilt, but residents say it is unclear whether the bridge is officially open: barricades near it keep being taken down by locals, and traffic still crowds the Chanchala Kodre bridge and Mundhwa Chowk.Status of 25 Nov 2026

Being built around it

33 projects with 6,567 homes being built within 2 km, due 2026 to 2033.

From MahaRERA's register. Source: MahaRERA project register (our copy, read daily) · measured 28 Nov 2026

6 schools within 3 km: 3 CBSE, 3 ICSE.

Straight-line distance from the project's pin. No fees or ratings: they are rarely published reliably. Sources: CBSE affiliated schools (SARAS), CISCE school locator, Google Maps (school positions) · measured 28 Nov 2026

Asked rent

Rent in Mundhwa

Asked rent, from 127 listings within 2 km, Nov 2026

SizeA monthMiddleListingsYield
1 BHK₹19,000 to ₹27,000₹25,00033
2 BHK₹31,000 to ₹40,000₹34,000533.6%
3 BHK₹45,000 to ₹60,000₹55,000414.0%

What owners ask on listings, not what tenants pay; the middle half of asks. Yield: a year's middle rent over the middle asking price for that size. Sources: MagicBricks rent listings, NoBroker rent listings, Square Yards rent listings, Asking prices of new projects (Avasetu project pages) · measured 28 Nov 2026

Work nearby

Companies from each hub's own tenant list; straight-line distance. Source: MahaRERA project register (our copy) and each hub's own tenant list · measured 28 Nov 2026

MahaRERA record

From MahaRERA, read 11 Nov 2026

Possession date

30 Nov 2029

The completion date filed with MahaRERA is 30 Nov 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Jul 2029.

Beside other Mundhwa projects

Worked out by Avasetu
Homes booked
49%
The middle of 29 Mundhwa projects registered within a year of it: 35%.
Completion date
Not moved by the builder
15 of 81 Mundhwa projects being built moved theirs 3 months or more.

From MahaRERA records read 11 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.

The record

Homes booked
162 of 334
Towers
4 in this registration
The tallest has 34 floors.
Units
334
256 homes, 78 shops or offices.
Registered on
20 Sep 2024
MahaRERA registration
PM1260002400007
Listed or updated on MahaRERA 25 Mar 2026.
Promoter (builder)
Godrej Properties Limited
Project type
Mixed
Pincode
411036

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • Towers go up to 34 floors. Ask how many lifts serve your tower and how many homes share them.
  • 78 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

4 buildings

Buildings

From MahaRERA
BuildingFloorsHomesOther
Tower 1347814
Tower 2345220
Tower 3345220
Tower 4347424

As filed with MahaRERA (sanctioned floors).

Godrej Properties: track record

From MahaRERA records

Godrej Properties has 39 projects in our MahaRERA register for Pune. 16 of 39 with both dates moved the completion date 3 months or more later, by 22 months on average.

All 39 projects by Godrej Properties in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Mundhwa

More by Godrej Properties Limited

FAQ

What is the price of Godrej Skyline?

3 BHK: ₹3.59 Cr to ₹4.3 Cr, as listed on the builder's site on 14 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Godrej Skyline?

The completion date filed with MahaRERA is 30 Nov 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Godrej Skyline?

Godrej Skyline is registered with MahaRERA as PM1260002400007.

How many towers and floors does Godrej Skyline have?

MahaRERA lists 4 buildings, the tallest with 34 floors.

How many flats are there in Godrej Skyline?

MahaRERA lists 334 units (256 residential, 78 other).

How many homes in Godrej Skyline are booked?

162 of 334 homes were booked as per MahaRERA on 11 Nov 2026.

Who is the builder of Godrej Skyline?

The promoter registered with MahaRERA is Godrej Properties Limited. Our register has 39 Pune projects by Godrej Properties; 16 of 39 with both dates moved their completion date 3 months or more later.

Where is Godrej Skyline?

Godrej Skyline is in 411036, Pune City, Pune district (pincode 411036).

Which school is nearest to Godrej Skyline?

Army Public School, about 2.3 km away in a straight line from the map position; the drive is longer.

Which railway station is nearest to Godrej Skyline?

Hadapsar, about 1.4 km away in a straight line from the map position; the drive is longer.

How far is Godrej Skyline from Magarpatta City?

About 2.2 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Godrej Skyline.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 25 Mar 2026

  • Dates and homes bookedFrom MahaRERA

    Checked 14 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 14 Nov 2026

  • DescriptionNot checked yet

    Still checking

  • PricesGathered and checked

    The builder's site, or two property sites that agree (14 Nov 2026)

  • Rough price guideGathered and checked

    An asking price seen on one site, rounded and checked against the area (14 Nov 2026)

Get the price sheet and floor plans for Godrej Skyline

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment