Skip to main contentSkip to navigation
Kohinoor Group logo
The builder's logo, from iamkohinoor.com
MahaRERA registered P52100056358Verify on MahaRERA (opens in a new tab)

Kohinoor Central Park, Hinjawadi

Filed on MahaRERA as Kohinoor Central Park - Phase 1

See the site from above today

by Kohinoor Group · Hinjawadi, Mulshi, Pune district · 411057

Homes
2, 3 BHK
Price
from ₹88 L
EMI about ₹61,095 a month
Possession
from Apr 2029
its parts filed Apr 2029 to Feb 2030
Booked
1,139 of 1,648
across all 2 of its MahaRERA registrations

What stands out

As of 13 Nov 2026, from MahaRERA and the sources below.

  • 70% of homes booked: MahaRERA shows 767 of 1095 homes booked.
  • 70% booked here; the middle of 55 Hinjawadi projects registered within a year of it is 59%.
  • Land: Land: 13.5 acres.
  • Homes on offer (BHK types, sizes): Homes on offer (BHK types, sizes): The project offers 2BHK, 3BHK, and 3BHK Duplex configurations.
  • Completion date filed with MahaRERA: 30 Apr 2029.

Updated 21 Nov 2026

Price

  • 2 BHK

    ₹88 L – ₹1.07 Cr

    from 884 sq ft · ₹9,955/sq ft

    Last checked 5 Nov 2026

    All-in cost of the 2 BHK at ₹88 L: about ₹98.86 L
    Price (agreement value)₹88 L
    GST (5%)₹4.4 L
    Stamp duty (7%)₹6.16 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹98.86 L
  • 3 BHK

    ₹1.08 Cr – ₹1.48 Cr

    Last checked 5 Nov 2026

    All-in cost of the 3 BHK at ₹1.08 Cr: about ₹1.21 Cr
    Price (agreement value)₹1.08 Cr
    GST (5%)₹5.4 L
    Stamp duty (7%)₹7.56 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.21 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹61,095 a monthOn a ₹70.4 L loan (80% of ₹88 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Hinjawadi usually ask

  • 1 BHK about ₹70 – 85 L (4 projects)
  • 2 BHK about ₹75 L – ₹1.1 Cr (44 projects)
  • 2.5 BHK about ₹85 L – ₹1.4 Cr (4 projects)
  • 3 BHK about ₹1 – 1.6 Cr (43 projects)
  • 3.5 BHK about ₹1.6 – 2.1 Cr (6 projects)
  • 4 BHK about ₹1.9 – 2.7 Cr (14 projects)
  • 4.5 BHK about ₹1.8 – 2.2 Cr (5 projects)
  • 5 BHK about ₹2.1 – 2.7 Cr (4 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Hinjawadi, rounded. Use it to judge an offer, not as a price.

Hinjawadi average ₹11,555/sq ft across 20 projectsThe middle asking price per sq ft of other projects in Hinjawadi.

Ask about this project

Outside our main East Pune areas: the Avasetu team finds out what it can.

Send your question

Kohinoor Central Park from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Kohinoor Central Park, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Kohinoor Central Park from above, satellite picture of Nov 2022
    Nov 2022
  2. Kohinoor Central Park from above, satellite picture of Jan 2024
    Jan 2024
  3. Kohinoor Central Park from above, satellite picture of Feb 2025
    Feb 2025
  4. Kohinoor Central Park from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2025 (looked Nov 2026)

Prominent shadows from tall structures persist near the ring.

Registered with MahaRERA May 2024 · possession filed for from Apr 2029

Season by season, Jan 2023 to Oct 2026: 12 seasons, October to May (the monsoon is under cloud).

Satellite images show the site transitioning from bare ground and sparse vegetation into active construction with tall building shadows emerging after the May 2024 registration, consistent with multi-phase development.

The seasons before

  1. Jan–Mar 2025Tall building shadows lengthen northwest, aligning with project registrations.
  2. Jan–Mar 2024Ground disturbance and darker shadow footprints visible near the ring.
  3. Oct–Dec 2023Dark shadows of tall structures appear near the ring.
Construction proof from space: Jan 2023 to Oct 2026, Copernicus Sentinel-2 (1 earlier seasons)
  1. Jan–Mar 2023Sparse vegetation remains inside the ring; surrounding area shows existing structures.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2023-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)3.6 km
  • Baner-Balewadi High Street7.8 km
  • Pune Railway Station19.3 km
  • Pune Airport (Lohegaon)21.6 km

Nearby

  • Industrial areaInternational Tech Park Pune2.1 km
  • ShoppingGrand Highstreet2.3 km
  • Industrial areaRajiv Gandhi Infotech Park, Maan Phase-32.3 km
  • ShoppingStreets of Europe2.9 km
  • Industrial areaSoftware Technology Parks of India3.1 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

MahaRERA record

From MahaRERA, read 13 Nov 2026

Possession date

30 Apr 2029 to 15 Feb 2030

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100056358: 30 Apr 2029. The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 31 Dec 2028.

The record

Homes booked
1,139 of 1,648
Across all 2 of its MahaRERA registrations. P52100056358 alone: 767 of 1,095.
Towers
7 in this registration
The tallest has 23 floors.
Units
1,095
1,039 homes, 56 shops or offices.
Registered on
29 May 2024
Main MahaRERA registration
P52100056358
Listed or updated on MahaRERA 13 Aug 2024.
Promoter (builder)
Intofinity Promoters Private Limited
Project type
Others
Pincode
411057

Open the MahaRERA record (opens in a new tab)

Check before you book

From MahaRERA
  • A large project: 1,648 homes in 7 towers, built in phases. Ask when your own tower and the clubhouse are due, not only the project.
  • 56 shops or offices are part of the project. Ask where they open and whether their visitors use the residents' gate.

Tower by tower

2 registrations, 7 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds Kohinoor Central Park as 2 registrations. Together they list 1,648 homes, 1,139 booked.

RegistrationCompletion filedBooked
Kohinoor Central Park - Phase 1P52100056358 (opens in a new tab)30 Apr 2029at registration 31 Dec 2028767 of 1,095
Kohinoor Central Park - Phase IIP52100078767 (opens in a new tab)15 Feb 2030at registration 15 Oct 2029372 of 553

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
TOWER 1231720
TOWER 2231720
TOWER 3231760
TOWER 4231730
COMMERCIAL1056
TOWER 5231730
TOWER 6231730

As filed with MahaRERA (sanctioned floors).

What the builder's and property sites say

Gathered and checked
Land
13.5 acres

Last checked 5 Nov 2026. MahaRERA counts where they differ.

Kohinoor Group: track record

From MahaRERA records

Kohinoor Group has 36 projects in our MahaRERA register for Pune. 11 of 36 with both dates moved the completion date 3 months or more later, by 24 months on average.

All 36 projects by Kohinoor Group in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Hinjawadi

More by Intofinity Promoters Private Limited

FAQ

What is the price of Kohinoor Central Park?

2 BHK: ₹88 L to ₹1.07 Cr; 3 BHK: ₹1.08 Cr to ₹1.48 Cr, checked on 5 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Kohinoor Central Park?

The 2 MahaRERA registrations of Kohinoor Central Park have filed completion dates from 30 Apr 2029 to 15 Feb 2030. For P52100056358: The completion date filed with MahaRERA is 30 Apr 2029; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Kohinoor Central Park?

Kohinoor Central Park is registered with MahaRERA in 2 parts (towers or phases): P52100056358, P52100078767.

How many towers and floors does Kohinoor Central Park have?

MahaRERA lists 7 buildings in registration P52100056358, one of the project's 2, the tallest with 23 floors.

How many flats are there in Kohinoor Central Park?

MahaRERA lists 1648 units across all 2 of its MahaRERA registrations; P52100056358 has 1095.

How many homes in Kohinoor Central Park are booked?

1139 of 1648 homes were booked as per MahaRERA on 13 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of Kohinoor Central Park?

The promoter registered with MahaRERA is Intofinity Promoters Private Limited. Our register has 36 Pune projects by Kohinoor Group; 11 of 36 with both dates moved their completion date 3 months or more later.

Where is Kohinoor Central Park?

Kohinoor Central Park is in Mulshi, Pune district (pincode 411057).

How far is Kohinoor Central Park from Pune Airport?

About 21.6 km in a straight line from the map position; the drive is longer.

How far is Kohinoor Central Park from Hinjawadi Phase 1 (Rajiv Gandhi Infotech Park)?

About 3.6 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Kohinoor Central Park.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 13 Aug 2024

  • Dates and homes bookedFrom MahaRERA

    Checked 5 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 5 Nov 2026

  • Location and nearbyGathered and checked

    Checked 5 Nov 2026

  • DescriptionGathered and checked

    Checked 5 Nov 2026

  • PricesGathered and checked

    The builder's site, or two property sites that agree (5 Nov 2026)

Get the price sheet and floor plans for Kohinoor Central Park - Phase 1

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment