Skip to main contentSkip to navigation
Kohinoor Kaleido, from the builder's websiteKohinoor Group logo
The builder's picture
MahaRERA registered P52100046027Verify on MahaRERA (opens in a new tab)

Kohinoor Kaleido, Wagholi

Sold as Kharadi by 5 property sites; we list it under Wagholi (pincode 412207).

See the site from above today

by Kohinoor Group · Wagholi, Pune · 412207

Homes
2, 3 BHK
Price
from ₹91.4 L
EMI about ₹63,455 a month
Possession
from Apr 2028
its parts filed Apr 2028 to Feb 2030
Booked
970 of 1,827
across all 2 of its MahaRERA registrations

Avasetu's read (from MahaRERA data, 23 Oct 2026)

With 823 of 832 homes booked, this project is 99% booked compared to about 83% for 12 similar Wagholi projects. The completion date filed with MahaRERA is 30 Apr 2028. For the builder, 10 of 35 Kohinoor Group projects in Pune with both dates on MahaRERA moved the completion date 3 months or more later.

What stands out

As of 22 Nov 2026, from MahaRERA and the sources below.

  • 99% of 832 homes booked: Almost all homes in this part of the project are already sold. This is significantly higher than the 83% booking rate seen in similar projects nearby.
  • Taller than 80 of 83 projects: With buildings reaching up to 23 floors, this high rise is taller than most other ongoing developments in Wagholi.

Updated 21 Nov 2026

Pictures

Kohinoor Kaleido, from the builder's website
Kohinoor Kaleido, from the builder's website
Kohinoor Kaleido, from the builder's website

From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.

Price

  • 2 BHK

    ₹91.4 L – ₹1 Cr

    Last checked 23 Nov 2026

    All-in cost of the 2 BHK at ₹91.4 L: about ₹1.03 Cr
    Price (agreement value)₹91.4 L
    GST (5%)₹4.57 L
    Stamp duty (7%)₹6.4 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.03 Cr
  • 3 BHK

    ₹1.1 Cr – ₹1.67 Cr

    Last checked 23 Nov 2026

    All-in cost of the 3 BHK at ₹1.1 Cr: about ₹1.24 Cr
    Price (agreement value)₹1.1 Cr
    GST (5%)₹5.5 L
    Stamp duty (7%)₹7.7 L
    Registration (1%, at most ₹30,000)₹30,000
    Total before the builder's charges₹1.24 Cr

Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.

EMI on the lowest price, as an example: about ₹63,455 a monthOn a ₹73.12 L loan (80% of ₹91.4 L) at 8.5% for 20 years. Ask your bank for its rate.

What new homes in Wagholi usually ask

  • 1 BHK about ₹25 – 40 L (6 projects)
  • 2 BHK about ₹50 – 75 L (32 projects)
  • 3 BHK about ₹85 L – ₹1.3 Cr (20 projects)
  • 4 BHK about ₹1.2 – 2.6 Cr (6 projects)

Our own guide: the middle half of the starting prices we have read for projects being sold in Wagholi, rounded. Use it to judge an offer, not as a price.

Wagholi average ₹8,168/sq ft across 13 projectsThe middle asking price per sq ft of other projects in Wagholi.

Get the exact price for your home

The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.

Ask for the current offer

Kohinoor Kaleido from above, today

Google satellite, centred on the project's map pin. Zoom in to see the site. Google does not date its picture, and it can be a year or more old: the latest reading below is from this season.

Kohinoor Kaleido, year by year, up close

Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.

  1. Kohinoor Kaleido from above, satellite picture of Nov 2022
    Nov 2022
  2. Kohinoor Kaleido from above, satellite picture of Jan 2024
    Jan 2024
  3. Kohinoor Kaleido from above, satellite picture of Feb 2025
    Feb 2025
  4. Kohinoor Kaleido from above, satellite picture of Apr 2026
    Apr 2026 · latest

Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗

Latest reading from space, Oct–Dec 2026 (looked Nov 2026)

Finishing earthworks and established building shadows fill the ring and adjacent plots.

Registered with MahaRERA Jun 2022 · possession filed for from Apr 2028

Season by season, Jan 2021 to Oct 2026: 17 seasons, October to May (the monsoon is under cloud).

Satellite imagery shows the transition of vacant land into active construction following the June 2022 and November 2024 MahaRERA registrations, with building shadows and footprints steadily emerging across the site.

The seasons before

  1. Jan–Mar 2026Dense shadows from towering structures dominate the ring, showing substantial structural height.
  2. Oct–Dec 2025Multiple building footprints and heavy shadow patterns intensify within the ring area.
  3. Jan–Mar 2025Tall building shadows lengthen inside the ring, indicating vertical construction.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
  1. Oct–Dec 2024Dark shadows of tall buildings emerge following the November 2024 phase registration.
  2. Jan–Mar 2024Initial structural footprints emerge inside the ring with surrounding earthworks.
  3. Oct–Dec 2023Blue sheets and temporary sheds appear near the ring as activity increases.
  4. Jan–Mar 2023Access roads take shape around the ring as site preparation continues.
  5. Oct–Dec 2022Work shows after the June 2022 registration with cleared earth and initial footprints.
  6. Jan–Mar 2022Bright spots indicating early earth-moving equipment appear inside the ring.
  7. Oct–Dec 2021Ground clearing visible inside the ring, expanding toward the surrounding vacant land.
  8. Jan–Mar 2021Bare land with sparse vegetation inside the ring, showing no prior structures.

The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.

Open the full timelineMore Pune projects from space

Floor plans

We send them to you on WhatsApp

Location

Position checked

The project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)

Work hubs

  • EON IT Park, Kharadi3.1 km
  • World Trade Center, Kharadi3.3 km
  • Pune Airport (Lohegaon)6.6 km
  • Magarpatta City7.8 km

Nearby

  • CollegeG.H. Raisoni College OF Engineering & Management, PUNE1.2 km
  • TempleWagheshwar Temple1.3 km
  • Industrial areaInternational Tech Park Pune, Kharadi2 km
  • Industrial areaEon IT Park Pune3 km
  • SchoolBjs School Wagholi3.7 km

Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.

Amenities

Last checked 23 Nov 2026.

MahaRERA record

From MahaRERA, read 22 Nov 2026

Possession date

30 Apr 2028 to 15 Feb 2030

The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.

For P52100046027: 30 Apr 2028. The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Dec 2027.

The record

Homes booked
970 of 1,827
Across all 2 of its MahaRERA registrations. P52100046027 alone: 823 of 832.
Towers
5 in this registration
The tallest has 23 floors.
Registered on
15 Jun 2022
Main MahaRERA registration
P52100046027
Listed or updated on MahaRERA 15 Jun 2022.
Promoter (builder)
Intofinity Promoters Private Limited
Project type
Residential / Group Housing
Pincode
412207

Open the MahaRERA record (opens in a new tab)

Tower by tower

2 registrations, 5 buildings

Towers and phases (2 registrations)

From MahaRERA

MahaRERA holds Kohinoor Kaleido as 2 registrations. Together they list 1,827 homes, 970 booked.

RegistrationCompletion filedBooked
Kohinoor KaleidoP52100046027 (opens in a new tab)30 Apr 2028at registration 30 Dec 2027823 of 832
Kohinoor Kaleido-Phase-IIP52100078107 (opens in a new tab)15 Feb 2030at registration 15 Oct 2029147 of 995

Each row is its own MahaRERA registration, as filed.

Buildings

From MahaRERA
BuildingFloorsHomesOther
A1231680
A2231680
A4221600
A5231680
A6231680

As filed with MahaRERA (sanctioned floors).

Kohinoor Group: track record

From MahaRERA records

Kohinoor Group has 36 projects in our MahaRERA register for Pune. 11 of 36 with both dates moved the completion date 3 months or more later, by 24 months on average.

All 36 projects by Kohinoor Group in Pune

Planning to buy here?

Ask about prices, floor plans, offers or a site visit.

Other projects in Wagholi

More by Intofinity Promoters Private Limited

FAQ

What is the price of Kohinoor Kaleido?

2 BHK: ₹91.4 L to ₹1 Cr; 3 BHK: ₹1.1 Cr to ₹1.67 Cr, checked on 23 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.

What is the possession date of Kohinoor Kaleido?

The 2 MahaRERA registrations of Kohinoor Kaleido have filed completion dates from 30 Apr 2028 to 15 Feb 2030. For P52100046027: The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).

What is the MahaRERA number of Kohinoor Kaleido?

Kohinoor Kaleido is registered with MahaRERA in 2 parts (towers or phases): P52100046027, P52100078107.

How many towers and floors does Kohinoor Kaleido have?

MahaRERA lists 5 buildings in registration P52100046027, one of the project's 2, the tallest with 23 floors.

How many flats are there in Kohinoor Kaleido?

MahaRERA lists 1827 units across all 2 of its MahaRERA registrations; P52100046027 has 832.

How many homes in Kohinoor Kaleido are booked?

970 of 1827 homes were booked as per MahaRERA on 22 Nov 2026, across all 2 of its MahaRERA registrations.

Who is the builder of Kohinoor Kaleido?

The promoter registered with MahaRERA is Intofinity Promoters Private Limited. Our register has 36 Pune projects by Kohinoor Group; 11 of 36 with both dates moved their completion date 3 months or more later.

Where is Kohinoor Kaleido?

Kohinoor Kaleido is in Wagholi, Pune (pincode 412207).

Which school is nearest to Kohinoor Kaleido?

Bjs School Wagholi, about 3.7 km away in a straight line from the map position; the drive is longer.

How far is Kohinoor Kaleido from Pune Airport?

About 6.6 km in a straight line from the map position; the drive is longer.

How far is Kohinoor Kaleido from EON IT Park, Kharadi?

About 3.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Kohinoor Kaleido.

Sources
  • Registration, promoter, pincodeFrom MahaRERA

    MahaRERA listing, updated 15 Jun 2022

  • Dates and homes bookedFrom MahaRERA

    Checked 23 Nov 2026

  • Buildings and wingsFrom MahaRERA

    Checked 23 Nov 2026

  • Location and nearbyGathered and checked

    Checked 23 Nov 2026

  • DescriptionNot checked yet

    Still checking

  • PricesGathered and checked

    The builder's site, or two property sites that agree (23 Nov 2026)

  • Project facts and amenitiesGathered and checked

    The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (23 Nov 2026)

Get the price sheet and floor plans for Kohinoor Kaleido

The Avasetu team calls or WhatsApps you back; we never share your number without your OK.

What would you like?

BHK

Add budget, move-in or a note (optional)

Skip anything you like. It only helps with better options.

Budget

Move in

Payment