Kohinoor Kaleido, Wagholi
Sold as Kharadi by 5 property sites; we list it under Wagholi (pincode 412207).
See the site from above todayby Kohinoor Group · Wagholi, Pune · 412207
- Homes
- 2, 3 BHK
- Price
- from ₹91.4 L
- EMI about ₹63,455 a month
- Possession
- from Apr 2028
- its parts filed Apr 2028 to Feb 2030
- Booked
- 970 of 1,827
- across all 2 of its MahaRERA registrations
Avasetu's read (from MahaRERA data, 23 Oct 2026)
With 823 of 832 homes booked, this project is 99% booked compared to about 83% for 12 similar Wagholi projects. The completion date filed with MahaRERA is 30 Apr 2028. For the builder, 10 of 35 Kohinoor Group projects in Pune with both dates on MahaRERA moved the completion date 3 months or more later.
What stands out
As of 22 Nov 2026, from MahaRERA and the sources below.
- 99% of 832 homes booked: Almost all homes in this part of the project are already sold. This is significantly higher than the 83% booking rate seen in similar projects nearby.
- Taller than 80 of 83 projects: With buildings reaching up to 23 floors, this high rise is taller than most other ongoing developments in Wagholi.
Updated 21 Nov 2026
Pictures
From the builder's website. Renders are the builder's artist's impressions and plans are indicative: check the sanctioned plans before you book.
Price
2 BHK
₹91.4 L – ₹1 Cr
Last checked 23 Nov 2026
All-in cost of the 2 BHK at ₹91.4 L: about ₹1.03 Cr
Price (agreement value) ₹91.4 L GST (5%) ₹4.57 L Stamp duty (7%) ₹6.4 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.03 Cr 3 BHK
₹1.1 Cr – ₹1.67 Cr
Last checked 23 Nov 2026
All-in cost of the 3 BHK at ₹1.1 Cr: about ₹1.24 Cr
Price (agreement value) ₹1.1 Cr GST (5%) ₹5.5 L Stamp duty (7%) ₹7.7 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.24 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹63,455 a monthOn a ₹73.12 L loan (80% of ₹91.4 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Wagholi usually ask
- 1 BHK about ₹25 – 40 L (6 projects)
- 2 BHK about ₹50 – 75 L (32 projects)
- 3 BHK about ₹85 L – ₹1.3 Cr (20 projects)
- 4 BHK about ₹1.2 – 2.6 Cr (6 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Wagholi, rounded. Use it to judge an offer, not as a price.
Wagholi average ₹8,168/sq ft across 13 projectsThe middle asking price per sq ft of other projects in Wagholi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
Kohinoor Kaleido from above, today
Kohinoor Kaleido, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Finishing earthworks and established building shadows fill the ring and adjacent plots.
Registered with MahaRERA Jun 2022 · possession filed for from Apr 2028
Satellite imagery shows the transition of vacant land into active construction following the June 2022 and November 2024 MahaRERA registrations, with building shadows and footprints steadily emerging across the site.
The seasons before
- Jan–Mar 2026Dense shadows from towering structures dominate the ring, showing substantial structural height.
- Oct–Dec 2025Multiple building footprints and heavy shadow patterns intensify within the ring area.
- Jan–Mar 2025Tall building shadows lengthen inside the ring, indicating vertical construction.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (8 earlier seasons)
- Oct–Dec 2024Dark shadows of tall buildings emerge following the November 2024 phase registration.
- Jan–Mar 2024Initial structural footprints emerge inside the ring with surrounding earthworks.
- Oct–Dec 2023Blue sheets and temporary sheds appear near the ring as activity increases.
- Jan–Mar 2023Access roads take shape around the ring as site preparation continues.
- Oct–Dec 2022Work shows after the June 2022 registration with cleared earth and initial footprints.
- Jan–Mar 2022Bright spots indicating early earth-moving equipment appear inside the ring.
- Oct–Dec 2021Ground clearing visible inside the ring, expanding toward the surrounding vacant land.
- Jan–Mar 2021Bare land with sparse vegetation inside the ring, showing no prior structures.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- EON IT Park, Kharadi3.1 km
- World Trade Center, Kharadi3.3 km
- Pune Airport (Lohegaon)6.6 km
- Magarpatta City7.8 km
Nearby
- CollegeG.H. Raisoni College OF Engineering & Management, PUNE1.2 km
- TempleWagheshwar Temple1.3 km
- Industrial areaInternational Tech Park Pune, Kharadi2 km
- Industrial areaEon IT Park Pune3 km
- SchoolBjs School Wagholi3.7 km
Straight-line distances; the drive is longer. Places: Google Maps and © OpenStreetMap contributors.
Amenities
- Residents have access to a two-floor clubhouse. (the builder's site)
- Car parking.
Last checked 23 Nov 2026.
MahaRERA record
From MahaRERA, read 22 Nov 2026Possession date
30 Apr 2028 to 15 Feb 2030
The completion dates filed with MahaRERA for its 2 registrations; each is in the table of towers and phases below.
For P52100046027: 30 Apr 2028. The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it). At registration: 30 Dec 2027.
The record
- Homes booked
- 970 of 1,827
- Across all 2 of its MahaRERA registrations. P52100046027 alone: 823 of 832.
- Towers
- 5 in this registration
- The tallest has 23 floors.
- Registered on
- 15 Jun 2022
- Main MahaRERA registration
- P52100046027
- Listed or updated on MahaRERA 15 Jun 2022.
- Promoter (builder)
- Intofinity Promoters Private Limited
- Project type
- Residential / Group Housing
- Pincode
- 412207
Tower by tower
2 registrations, 5 buildings
Towers and phases (2 registrations)
From MahaRERAMahaRERA holds Kohinoor Kaleido as 2 registrations. Together they list 1,827 homes, 970 booked.
| Registration | Completion filed | Booked |
|---|---|---|
| Kohinoor KaleidoP52100046027 (opens in a new tab) | 30 Apr 2028at registration 30 Dec 2027 | 823 of 832 |
| Kohinoor Kaleido-Phase-IIP52100078107 (opens in a new tab) | 15 Feb 2030at registration 15 Oct 2029 | 147 of 995 |
Each row is its own MahaRERA registration, as filed.
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| A1 | 23 | 168 | 0 |
| A2 | 23 | 168 | 0 |
| A4 | 22 | 160 | 0 |
| A5 | 23 | 168 | 0 |
| A6 | 23 | 168 | 0 |
As filed with MahaRERA (sanctioned floors).
Kohinoor Group: track record
From MahaRERA recordsKohinoor Group has 36 projects in our MahaRERA register for Pune. 11 of 36 with both dates moved the completion date 3 months or more later, by 24 months on average.
- KOHINOOR BLISSPARKcompletion filed 31 Dec 2018, moved 6 months later
- Kohinoor Shangrila Phase Icompletion filed 31 Dec 2018, moved 12 months later
- KOHINOOR IRIS PARKcompletion filed 31 Dec 2019
- Jai Ganesh Vision Commercial Wing Acompletion filed 30 Jan 2021, moved 18 months later
- SUBHASHREE RESIDENTIAL PHASE IIIcompletion filed 30 Jan 2021, moved 18 months later
- KOHINOOR BEGONIA PHASE IIIcompletion filed 30 Dec 2021, moved 24 months later
- SHUBHAM GALLERIAcompletion filed 30 Oct 2022, moved 21 months later
- Kohinoorcompletion filed 30 Mar 2023
- OLIVE BLISScompletion filed 31 Dec 2023, moved 56 months later
- KOHINOOR GRANDEURcompletion filed 30 Mar 2024
- KOHINOOR JEEVAcompletion filed 30 Jun 2024
- KOHINOOR EMERALD 1completion filed 30 Sep 2024
- KOHINOOR CORALcompletion filed 30 Dec 2024
- KOHINOOR SAPPHIREcompletion filed 30 Dec 2024
- Kohinoor Heights IIcompletion filed 31 Dec 2025
- KOHINOOR WORLD TOWER PHASE 1completion filed 30 Jun 2026
- SHUBHAM GALLERIA PH-2completion filed 31 Jul 2026, moved 15 months later
- S3 LIFESTYLEcompletion filed 30 Nov 2026, moved 66 months later
- KOHINOOR VIVA PIXEL- PHASE Icompletion filed 30 Sep 2027, moved 11 months later
- Kohinoor City I and Kohinoor City IIcompletion filed 30 Apr 2028
- KOHINOOR RIVERDALEcompletion filed 31 Dec 2028
- Kohinoor Business Towercompletion filed 31 Dec 2028
- KOHINOOR FAMVILLEcompletion filed 30 Apr 2029
- Kohinoor Central Park - Phase 1completion filed 30 Apr 2029
- Kohinoor Westview Reservecompletion filed 30 Apr 2029
- Kohinoor Westview Reserve-IIcompletion filed 30 Apr 2029
- Kohinoor A/Ccompletion filed 28 Jun 2029
- Kohinoor Bcompletion filed 28 Jun 2029
- KOHINOOR WOODSHIREcompletion filed 31 Dec 2029
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Wagholi
- Aarav Arcaciapossession Apr 2028
- Aarav Blossom3 BHK · from ₹57.05 L · possession Apr 2028Starts ₹34 L lower than Kohinoor Kaleido
- Aarav Elite Row Villaspossession Apr 2028
- Anshul Kanvas B Building1 BHK · from ₹36.78 L · possession Aug 2028Starts ₹55 L lower than Kohinoor Kaleido
- Castle Gardenpossession Apr 2028
- Castle Hillspossession Apr 2028
More by Intofinity Promoters Private Limited
- Kohinoor Riverdale2, 3 BHK · from ₹97.5 L · possession Dec 2028
- Kohinoor Woodshirepossession Dec 2029
- Kohinoor Avantarapossession Jul 2032
- Kohinoor Central Park2, 3 BHK · from ₹88 L · possession Apr 2029
- Kohinoor Royale Towerspossession Apr 2031
- Kohinoor Satori Mahalunge3, 4, 4.5 BHK · from ₹1.6 Cr · possession Apr 2030
FAQ
What is the price of Kohinoor Kaleido?
2 BHK: ₹91.4 L to ₹1 Cr; 3 BHK: ₹1.1 Cr to ₹1.67 Cr, checked on 23 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of Kohinoor Kaleido?
The 2 MahaRERA registrations of Kohinoor Kaleido have filed completion dates from 30 Apr 2028 to 15 Feb 2030. For P52100046027: The completion date filed with MahaRERA is 30 Apr 2028; MahaRERA's August 2026 order added 4 months to it (the builder has not moved it).
What is the MahaRERA number of Kohinoor Kaleido?
Kohinoor Kaleido is registered with MahaRERA in 2 parts (towers or phases): P52100046027, P52100078107.
How many towers and floors does Kohinoor Kaleido have?
MahaRERA lists 5 buildings in registration P52100046027, one of the project's 2, the tallest with 23 floors.
How many flats are there in Kohinoor Kaleido?
MahaRERA lists 1827 units across all 2 of its MahaRERA registrations; P52100046027 has 832.
How many homes in Kohinoor Kaleido are booked?
970 of 1827 homes were booked as per MahaRERA on 22 Nov 2026, across all 2 of its MahaRERA registrations.
Who is the builder of Kohinoor Kaleido?
The promoter registered with MahaRERA is Intofinity Promoters Private Limited. Our register has 36 Pune projects by Kohinoor Group; 11 of 36 with both dates moved their completion date 3 months or more later.
Where is Kohinoor Kaleido?
Kohinoor Kaleido is in Wagholi, Pune (pincode 412207).
Which school is nearest to Kohinoor Kaleido?
Bjs School Wagholi, about 3.7 km away in a straight line from the map position; the drive is longer.
How far is Kohinoor Kaleido from Pune Airport?
About 6.6 km in a straight line from the map position; the drive is longer.
How far is Kohinoor Kaleido from EON IT Park, Kharadi?
About 3.1 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to Kohinoor Kaleido.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 15 Jun 2022
- Dates and homes bookedFrom MahaRERA
Checked 23 Nov 2026
- Buildings and wingsFrom MahaRERA
Checked 23 Nov 2026
- Location and nearbyGathered and checked
Checked 23 Nov 2026
- DescriptionNot checked yet
Still checking
- PricesGathered and checked
The builder's site, or two property sites that agree (23 Nov 2026)
- Project facts and amenitiesGathered and checked
The builder's site and property sites, which can be wrong: where they differ from MahaRERA, MahaRERA counts (23 Nov 2026)