VTP Altair, Wagholi
Sold as Kharadi by 4 property sites; we list it under Wagholi (pincode 412207).
See the site from above todayby VTP Realty · Wagholi, Pune · 412207
- Homes
- 2, 3 BHK
- Price
- from ₹71 L
- EMI about ₹49,292 a month
- Possession
- Jun 2026
- completion filed with MahaRERA
- Booked
- 487 of 495
What stands out
As of 7 Nov 2026, from MahaRERA and the sources below.
- 98% of homes booked: Buyers have booked 487 of the 495 homes, while similar projects are at about 83%.
- With 495 homes across 3 buildings, this registration is larger than 74 of 80 ongoing projects in the locality.
- Completion date revised by one year: The original completion date filed at registration was 30 Jun 2025, which has been revised to 29 Jun 2026. Across Pune, 29 of 55 VTP Realty projects postponed their completion by 3 months or more.
Updated 21 Nov 2026
Price
2 BHK
₹71 L – ₹82 L
from 852 sq ft · ₹8,333/sq ft
Last checked 4 Nov 2026
All-in cost of the 2 BHK at ₹71 L: about ₹76.27 L + GST if any
Price (agreement value) ₹71 L GST Ask Stamp duty (7%) ₹4.97 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹76.27 L 3 BHK
₹1.04 Cr – ₹1.27 Cr
from 1,328 sq ft · ₹7,831/sq ft
Last checked 4 Nov 2026
All-in cost of the 3 BHK at ₹1.04 Cr: about ₹1.12 Cr + GST if any
Price (agreement value) ₹1.04 Cr GST Ask Stamp duty (7%) ₹7.28 L Registration (1%, at most ₹30,000) ₹30,000 Total before the builder's charges ₹1.12 Cr
Starting prices; tower, floor, parking and floor-rise change the final price. Not included: parking, club house, maintenance deposit, legal and society charges. They differ by project: ask the builder for the full cost sheet. If a price already includes GST or stamp duty, do not add them twice.
EMI on the lowest price, as an example: about ₹49,292 a monthOn a ₹56.8 L loan (80% of ₹71 L) at 8.5% for 20 years. Ask your bank for its rate.
What new homes in Wagholi usually ask
- 1 BHK about ₹25 – 40 L (6 projects)
- 2 BHK about ₹50 – 75 L (32 projects)
- 3 BHK about ₹85 L – ₹1.3 Cr (20 projects)
- 4 BHK about ₹1.2 – 2.6 Cr (6 projects)
Our own guide: the middle half of the starting prices we have read for projects being sold in Wagholi, rounded. Use it to judge an offer, not as a price.
Wagholi average ₹8,485/sq ft across 12 projectsThe middle asking price per sq ft of other projects in Wagholi.
Get the exact price for your home
The Avasetu team gets you the current price sheet for the size you want, with parking and all other charges.
VTP Altair from above, today
VTP Altair, year by year, up close
Sharp satellite pictures taken in Nov 2022, Jan 2024, Feb 2025 and Apr 2026, centred on the project's map pin, about 580 m across at about 0.3 m a pixel.
Nov 2022 Jan 2024 Feb 2025 Apr 2026 · latest
Each picture is dated by when it was taken; the ring is 100 m around the pin. Map image is the intellectual property of Esri and is used herein under license. Copyright © 2026 Esri and its licensors (imagery: Maxar, Vantor). All rights reserved. Compare every release ↗
Latest reading from space, Oct–Dec 2026 (looked Nov 2026)
Final phase structures remain clear with surrounding development outside the ring.
Registered with MahaRERA Aug 2021 · possession filed for Jun 2026
Satellite imagery shows the transition of open land into major residential towers following the August 2021 registration, with substantial structural growth and shadow casting visible through 2026.
The seasons before
- Apr–May 2026Little change, structures and surrounding access roads remain visible.
- Oct–Dec 2025Structures remain prominent with consistent shadow patterns.
- Apr–May 2025Little change in the established building footprints.
Construction proof from space: Jan 2021 to Oct 2026, Copernicus Sentinel-2 (12 earlier seasons)
- Jan–Mar 2025Tall buildings show distinct shadows extending northwest.
- Oct–Dec 2024Continued presence of tall structures casting northwest shadows.
- Apr–May 2024Little change, bright structural outlines remain visible in the ring.
- Jan–Mar 2024Tall structures cast prominent dark shadows toward the northwest.
- Oct–Dec 2023Vertical growth visible with dark shadows cast to the northwest.
- Apr–May 2023Bright structures emerge inside the ring with surrounding cleared land.
- Jan–Mar 2023New building footprints and bright reflection from construction materials inside the ring.
- Oct–Dec 2022Foundations and early structural footprints appear inside the ring.
- Jan–Mar 2022Excavation work and cleared soil visible inside the ring.
- Oct–Dec 2021Ground clearing visible inside the ring following the August 2021 registration.
- Apr–May 2021Bare soil persists inside the ring with no new structures visible.
- Jan–Mar 2021Ring shows bare ground with sparse vegetation; little change from previous periods.
The yellow ring marks the project's map pin. Each picture is 600 m across at 10 m a pixel: it takes in neighbouring plots, and shows ground, not floors. The satellite sees 10 m a pixel, so this shows that the ground changed, not the towers themselves. Pictures are the middle of every clear pass, sharpened and colour-corrected by code; nothing is drawn in. The timeline starts a year before the project registered. The lines are written from the pictures and the MahaRERA filings, and say only what can be seen. Contains modified Copernicus Sentinel data 2021-2026.
Floor plans
Location
Position checkedThe project's pin on Google Maps, checked against its MahaRERA name and pincode. Open the map (opens in a new tab)
Work hubs
- EON IT Park, Kharadi2.3 km
- World Trade Center, Kharadi2.4 km
- Magarpatta City6 km
- Pune Airport (Lohegaon)7.3 km
Straight-line distances; the drive is longer.
MahaRERA record
From MahaRERA, read 7 Nov 2026Possession date
29 Jun 2026
Completion date filed with MahaRERA. At registration: 30 Jun 2025. Moved 8 months later, 4 of them by MahaRERA's August 2026 order for most projects.
The filed completion date has passed. Ask for the occupancy certificate (OC) before you book.
Ask for the possession date in writing in your agreement for sale.
Beside other Wagholi projects
Worked out by Avasetu- Homes booked
- 98%
- The middle of 8 Wagholi projects registered within a year of it: 83%.
- Completion date
- Moved 8 months later
- 26 of 96 Wagholi projects being built moved theirs 3 months or more.
From MahaRERA records read 7 Nov 2026. Homes booked are the builders' own quarterly counts. Dates net of MahaRERA's August 2026 order.
The record
- Homes booked
- 487 of 495
- Towers
- 3 in this registration
- The tallest has 35 floors.
- Registered on
- 30 Aug 2021
- MahaRERA registration
- P52100030521
- Listed or updated on MahaRERA 12 Aug 2026.
- Promoter (builder)
- Integrated Business Ecosystem Private Limited
- Project type
- Residential / Group Housing
- Pincode
- 412207
Check before you book
From MahaRERA- The completion date filed with MahaRERA (Jun 2026) has passed. Ask for the occupancy certificate (OC) before you pay anything more.
- The builder has moved the completion date 8 months later since registration, from Jun 2025 to Jun 2026 (MahaRERA's 2026 blanket extension for all projects left out). Ask why, and which date goes in your agreement for sale.
- Towers go up to 35 floors. Ask how many lifts serve your tower and how many homes share them.
Tower by tower
3 buildings
Buildings
From MahaRERA| Building | Floors | Homes | Other |
|---|---|---|---|
| Tower 1 | 35 | 175 | 0 |
| Tower 2 | 35 | 115 | 0 |
| Tower 3 | 35 | 205 | 0 |
As filed with MahaRERA (sanctioned floors).
What the builder's and property sites say
Gathered and checked- Floors per tower (highest)
- up to 35 floors
Last checked 4 Nov 2026. MahaRERA counts where they differ.
VTP Realty: track record
From MahaRERA recordsVTP Realty has 50 projects in our MahaRERA register for Pune. 27 of 50 with both dates moved the completion date 3 months or more later, by 20 months on average.
- Urban Risecompletion filed 30 Jun 2018, moved 6 months later
- URBAN BALANCEcompletion filed 31 Jul 2018, moved 1 month later
- Trade Park Phase1completion filed 29 Dec 2021, moved 24 months later
- Market Placecompletion filed 30 Dec 2021, moved 24 months later
- VTP ONEcompletion filed 28 Feb 2022, moved 14 months later
- Urban Nest Phase1completion filed 30 Mar 2022, moved 24 months later
- KPSQUAREcompletion filed 30 Jun 2022
- Urbanlife plottingcompletion filed 30 Jun 2022, moved 18 months later
- Purvanchal Phase1 ABcompletion filed 29 Dec 2022, moved 18 months later
- VTP Leonara E Buidlingcompletion filed 16 May 2023
- VTP Alpinecompletion filed 14 Jun 2023, moved 12 months later
- VTP SOLITAIRE PHASE 1 ABcompletion filed 31 Oct 2023, moved 34 months later
- Purvanchal Phase2 C D Ecompletion filed 31 Dec 2023, moved 6 months later
- Vtp Beaumonde- Nation R2 Tower5completion filed 15 Apr 2024, moved 20 months later
- VTP Beaumonde-Nation R2 T1completion filed 24 Oct 2024, moved 33 months later
- VTP Belair B And D Buildingcompletion filed 30 Dec 2024
- VTP Belair C buildingcompletion filed 30 Dec 2024
- VTP Leonara A and D Buildingcompletion filed 30 Dec 2024
- VTP Leonara building C and Fcompletion filed 30 Dec 2024
- VTP TOWNSQUAREcompletion filed 31 Mar 2025, moved 33 months later
- VTP Leonara H buildingcompletion filed 15 May 2025, moved 29 months later
- Purvanchal F Buildingcompletion filed 29 Jun 2025, moved 12 months later
- THE HUBcompletion filed 30 Jun 2025, moved 18 months later
- VTP Beaumonde Building T3completion filed 30 Jun 2025
- VTP Cygnus Building T11completion filed 30 Jun 2025
- VTP Cygnus BuildingT12 and Commercialcompletion filed 30 Jun 2025
- Vtp Cygnus- Nation R1-Tower 9completion filed 18 Jul 2025
- VTP Beaumonde Nation R2 Tower6completion filed 15 Aug 2025, moved 12 months later
- VTP AETHEREUS HIGH STREETcompletion filed 31 Mar 2026, moved 12 months later
Planning to buy here?
Ask about prices, floor plans, offers or a site visit.
Other projects in Wagholi
More by Integrated Business Ecosystem Private Limited
FAQ
What is the price of VTP Altair?
2 BHK: ₹71 L to ₹82 L; 3 BHK: ₹1.04 Cr to ₹1.27 Cr, checked on 4 Nov 2026. Builders change prices often and add parking and other charges: ask for the current price sheet before you book.
What is the possession date of VTP Altair?
The completion date filed with MahaRERA is 29 Jun 2026. At registration it was 30 Jun 2025. MahaRERA added 4 months to most projects' dates in August 2026 (Order 66/2026). Ask the builder for the possession date in your agreement, in writing.
What is the MahaRERA number of VTP Altair?
VTP Altair is registered with MahaRERA as P52100030521.
How many towers and floors does VTP Altair have?
MahaRERA lists 3 buildings, the tallest with 35 floors.
How many flats are there in VTP Altair?
MahaRERA lists 495 units.
How many homes in VTP Altair are booked?
487 of 495 homes were booked as per MahaRERA on 7 Nov 2026.
Who is the builder of VTP Altair?
The promoter registered with MahaRERA is Integrated Business Ecosystem Private Limited. Our register has 50 Pune projects by VTP Realty; 27 of 50 with both dates moved their completion date 3 months or more later.
Where is VTP Altair?
VTP Altair is in Wagholi, Pune (pincode 412207).
Has the completion date of VTP Altair passed?
Yes. Ask the builder for the occupancy certificate (OC) before you book.
How far is VTP Altair from Pune Airport?
About 7.3 km in a straight line from the map position; the drive is longer.
How far is VTP Altair from EON IT Park, Kharadi?
About 2.3 km in a straight line from the map position; the drive is longer. It is the nearest of Pune's main work hubs to VTP Altair.
Sources
- Registration, promoter, pincodeFrom MahaRERA
MahaRERA listing, updated 12 Aug 2026
- Dates and homes bookedFrom MahaRERA
Checked 8 Oct 2026
- Buildings and wingsFrom MahaRERA
Checked 8 Oct 2026
- Location and nearbyGathered and checked
Checked 5 Nov 2026
- DescriptionGathered and checked
Checked 5 Nov 2026
- PricesGathered and checked
The builder's site, or two property sites that agree (4 Nov 2026)
Get the price sheet and floor plans for VTP ALTAIR
The Avasetu team calls or WhatsApps you back; we never share your number without your OK.